# Agent Journal

This is the human-readable journal for repeated `automoat` work loops.

Use short dated entries. Focus on decisions, changes, blockers, and next steps.

## 2026-04-25

- Bootstrapped project direction: vision, use cases, MVP framing, and generated landing page.
- Chosen current wedge: Dallas, Texas residential electrical permits and inspections.
- Added loop scaffolding plan; next step is to define the minimal ingestion schema, eval tasks, and business-first discovery artifacts.
- Added lock-aware loop scaffolding with `LOOP.md`, `NEXT_TASK.md`, `scripts/codex-loop.sh`, repo-local run logs, and a shared agent journal.
- Added `implementation-spec.md` covering the first executable slice: schema targets, eval task types, business-first artifacts, UI requirements, and implementation order.
- Added `HEARTBEAT.md` and `scripts/codex-session.sh` so a single command can hold the shared lock and keep making bounded progress for a fixed session window.
- Added `schema.md` for the Dallas electricians MVP: canonical output files, required entities, field-level contracts, normalization vocabularies, inclusion rules, join expectations, and concrete example permit and inspection records.
- Added `evals.md` for the Dallas electricians MVP: four task families, task row shape, split rules, baseline definitions, scoring outputs, and minimum success criteria.
- Added `discovery-artifacts.md` for the Dallas electricians MVP: business-first output files, intake contract, moat hypothesis schema, data gap plan, eval opportunity bridge, and discovery stop/go rules.
- Added `generated/discovery/dallas-electrician-sample-v1/` as a concrete Dallas business-first scaffold with sample JSON and Markdown outputs for business profile, workflow map, moat hypotheses, data gaps, eval opportunities, and a short operator summary.
- Added `generated/evals/dallas-electrician-sample-v1/` as a concrete dataset-first scaffold with sample `tasks.jsonl`, `task_splits.json`, and a short report showing one row per Dallas electricians eval family.
- Added `generated/fixtures/dallas-electrician-sequences-v1/` as a reusable synthetic fixture pack with normalized permit histories and pattern slices that cover all four Dallas electricians eval families.
- Added `scripts/generate_dallas_eval_artifacts.py` as a deterministic Dallas eval writer and regenerated `generated/evals/dallas-electrician-sample-v1/` from the reusable fixture pack.
- Added `scripts/generate_dallas_discovery_artifacts.py` plus `generated/intake/dallas-electrician-sample-v1/intake.json`, and regenerated the Dallas sample discovery scaffold from structured business intake instead of hand-authored output files.
- Tightened `evals.md` with a first-class `label_reviews.json` contract so reviewed failure labels and ranked next-action references are durable eval artifacts instead of implicit task metadata.
- Extended `scripts/generate_dallas_eval_artifacts.py` to emit `generated/evals/dallas-electrician-sample-v1/label_reviews.json` and updated the sample eval report to count reviewed label rows.
- Added `generated/normalized/dallas-electrician-sample-v1/` plus `scripts/generate_dallas_fixture_pack.py` so the Dallas fixture pack is now generated from row-shaped normalized permit, inspection, property, and contractor records instead of hand-maintained JSON.
- Added `scripts/generate_dallas_label_reviews.py` and finished the handoff from fixture-backed supervision to row-derived reviewed labels, so `label_reviews.json` is now emitted directly from normalized Dallas permit and inspection rows and consumed by the eval scaffold.
- Added `scripts/codex-day.sh` and `scripts/codex-publish.sh`, plus session/loop upgrades for stale-lock recovery, automatic landing-page sync, automatic publish to `main`, and a dedicated reporter pass during unattended runs.

## 2026-04-26

- Widened `generated/raw/dallas-electrician-import-sample-v2/` with three more Dallas electrician permit sequences so the imported fixture now repeats the existing `75208` remodel-final, `75214` new-install rough-in/correction-followup, and `75216` repair rough-in slices instead of leaving them as one-off examples.
- Regenerated `generated/normalized/dallas-electrician-import-sample-v2/`, `generated/fixtures/dallas-electrician-import-sequences-v2/`, and `generated/evals/dallas-electrician-import-sample-v2/`; imported `v2` now carries `8` permits, `22` inspections, `31` eval tasks, `13` reviewed label rows, and `38` source-lineage rows.
- Extended `scripts/generate_dallas_contract_summary.py` to report repeated pattern-slice and repeated next-action support directly, then regenerated `generated/contracts/dallas-electrician-contract-summary-v1/`; the summary now passes `10/10` checks and shows imported `v2` with `4` repeated pattern slices and `3` repeated next-action groups.
- Refreshed `NEXT_TASK.md` and `generated/landing.html` so the repo now points at the narrower remaining gap: repeated imported support for service-release and access-related edge cases rather than generic pattern-repeat scarcity.
- Re-read `generated/landing.html`, `NEXT_TASK.md`, `.automoat/logs/agent-journal.md`, `.pixelbox/handoff.md`, `README.md`, and the freshest generated artifacts before updating the landing page again.
- Refreshed `generated/landing.html` so it now acts as a higher-signal status page and changelog for the real current repo state: broad framing intact, contract summary centered, stale counts removed, imported `v2` corrected to `27` source records and `3` rule documents, and the remaining gap kept focused on repeat support for recurring patterns.
- Extended `scripts/import_dallas_permit_extracts.py` so imported Dallas samples can optionally ingest `rule_documents.csv`, emitting `rule_documents.jsonl` plus matching `rule_document` source-lineage rows in `source_records.jsonl`.
- Added Dallas electrical rule fixtures at `generated/raw/dallas-electrician-import-sample-v1/rule_documents.csv` and `generated/raw/dallas-electrician-import-sample-v2/rule_documents.csv`, then regenerated the imported normalized outputs so `v1` now carries `2` rule documents and `21` source records while `v2` carries `3` rule documents and `27` source records.
- Regenerated `generated/contracts/dallas-electrician-contract-summary-v1/summary.json` and `summary.md`; the contract summary now checks the imported rules workflow explicitly and passes `9/9` checks across the synthetic and imported Dallas scaffolds.
- Updated `NEXT_TASK.md` and `generated/landing.html` to retire the old normalization gap and point the repo at the next real Dallas MVP need: broader imported fixture support for repeated pattern slices and reviewed next-action examples.
- Reworked `generated/landing.html` into a higher-signal product/status page centered on the latest contract summary, exact Dallas scaffold counts, intentionally broad product framing, and the current normalization gap without claiming unbuilt progress.
- Added `scripts/generate_dallas_contract_summary.py` and generated `generated/contracts/dallas-electrician-contract-summary-v1/summary.json` plus `summary.md` to compare the synthetic Dallas scaffold against imported `v1` and `v2`.
- Made the contract summary validate stable normalized file presence, stable eval task families, stable label-review fields, and monotonic widening of permits, inspections, tasks, and source-lineage counts across imported samples.
- Updated `NEXT_TASK.md` and `generated/landing.html` so the repo no longer claims the cross-sample check is missing; the remaining Dallas MVP gap is now the repeatable normalization path for `source_records.jsonl` and optional `rule_documents.jsonl`.
- Extended `scripts/generate_dallas_discovery_artifacts.py` with batch mode so every intake variant under `generated/intake/` can emit a matching discovery run under `generated/discovery/` without hand-editing output fixtures.
- Added a second Dallas business-first intake at `generated/intake/dallas-electrician-south-dallas-v1/intake.json` focused on older-home South Dallas and Oak Cliff electrical work.
- Generated `generated/discovery/dallas-electrician-south-dallas-v1/` to prove the same Dallas discovery contract works across multiple realistic electrician profiles.
- Narrowed the next implementation gap to widening the normalized Dallas sample toward imported records while preserving the now-stable multi-intake discovery and downstream eval contracts.
- Rewrote `generated/landing.html` into an evidence-based landing page and changelog that reflects the repo's real state, current Dallas MVP scope, concrete generated artifacts, and explicit unbuilt gaps without inventing progress.
- Added `scripts/import_dallas_permit_extracts.py` plus `generated/raw/dallas-electrician-import-sample-v1/` so a small Dallas permit, inspection, and contractor CSV extract can normalize into the repo's stable row contracts.
- Generated `generated/normalized/dallas-electrician-import-sample-v1/`, `generated/fixtures/dallas-electrician-import-sequences-v1/`, and `generated/evals/dallas-electrician-import-sample-v1/` to prove the imported sample keeps the same downstream Dallas fixture, reviewed-label, and eval shapes.
- Parameterized `scripts/generate_dallas_eval_artifacts.py` so imported or widened normalized Dallas datasets can emit their own eval scaffolds without rewriting the script.
- Refreshed `generated/landing.html` again so the public-facing status page now matches the current imported-sample counts, discovery variant count, and remaining gap without stale claims about missing import paths.
- Added `generated/raw/dallas-electrician-import-sample-v2/` as a wider Dallas electrician import fixture with `pass`, `fail`, `partial`, `cancelled`, `not_ready`, and `unknown` inspection outcomes.
- Generated `generated/normalized/dallas-electrician-import-sample-v2/`, `generated/fixtures/dallas-electrician-import-sequences-v2/`, and `generated/evals/dallas-electrician-import-sample-v2/` to prove the importer and downstream Dallas contracts still hold across the broader result mix.
- Updated `NEXT_TASK.md` and `generated/landing.html` so the repo now points at the next real gap: cross-sample contract checks and a repeatable normalization path for source lineage plus optional rule documents.
- Refreshed `generated/landing.html` once more against the current repo artifacts so the page now reports three normalized dataset paths, three eval scaffolds, `52` total generated tasks, `19` reviewed label rows, and the imported `v2` sample as the latest concrete build signal.
- The 24-hour supervisor produced those artifacts, then exposed a bug in `scripts/codex-session.sh`: failed iterations were breaking the inner loop but still returning `0`, which let `scripts/codex-day.sh` spin through broken short cycles instead of stopping cleanly.

## 2026-05-10

- Widened `generated/raw/dallas-electrician-import-sample-v2/` with one more Dallas service-upgrade sequence and one more access-blocked remodel-final sequence so imported `v2` now repeats service-release and access-heavy next-action paths instead of leaving them as one-offs.
- Tightened `scripts/import_dallas_permit_extracts.py`, `scripts/generate_dallas_fixture_pack.py`, and `scripts/generate_dallas_label_reviews.py` so access-related labels no longer come from accidental `panel schedule` matches and access-blocked service-release rows normalize consistently.
- Regenerated `generated/normalized/dallas-electrician-import-sample-v2/`, `generated/fixtures/dallas-electrician-import-sequences-v2/`, `generated/evals/dallas-electrician-import-sample-v2/`, and `generated/contracts/dallas-electrician-contract-summary-v1/`; imported `v2` now carries `10` permits, `28` inspections, `37` eval tasks, `15` reviewed label rows, `46` source-lineage rows, and `4` repeated next-action groups while the contract stays at `10/10`.
- Refreshed `NEXT_TASK.md` and `generated/landing.html` so the repo now points at the narrower remaining gap: repeated cancelled, unknown, and panel-service examples rather than missing service-release or access support.

## 2026-05-17

- Widened `generated/raw/dallas-electrician-import-sample-v2/` with three more Dallas electrician permit sequences: one repeated cancelled/unknown remodel-final path and two repeated panel/service release failures.
- Regenerated `generated/normalized/dallas-electrician-import-sample-v2/`, `generated/fixtures/dallas-electrician-import-sequences-v2/`, `generated/evals/dallas-electrician-import-sample-v2/`, and `generated/contracts/dallas-electrician-contract-summary-v1/`; imported `v2` now carries `13` permits, `38` inspections, `49` eval tasks, `19` reviewed label rows, and `59` source-lineage rows.
- Confirmed the shared contract remains at `10/10`; imported `v2` now reports `5` repeated pattern slices and `5` repeated next-action groups, including repeated `correct_panel_or_service|add_labels_or_documentation|schedule_reinspection` support.
- Refreshed `NEXT_TASK.md` and `generated/landing.html` so the next real artifact is an explicit edge-case coverage report rather than more hidden fixture widening.
- Added `scripts/generate_dallas_edge_case_coverage.py` and generated `generated/coverage/dallas-electrician-edge-case-coverage-v1/coverage.json` plus `coverage.md`.
- The coverage report shows imported `v2` has repeated support for `6/6` result states, `4/5` failure reasons, `5/5` pattern slices, and `5/6` next-action groups; the remaining thin support is `incomplete_work` and `complete_remaining_work|schedule_reinspection`.
- Updated `README.md`, `NEXT_TASK.md`, `generated/landing.html`, and `index.html` so the next real step is promoting coverage expectations into contract checks rather than adding another hidden fixture expansion.
- Promoted the main edge-case coverage expectations into `scripts/generate_dallas_contract_summary.py`; `generated/contracts/dallas-electrician-contract-summary-v1/` now passes `13/13` checks, including repeated current result-state support, repeated core failure-reason support, and repeated key next-action support.
- Updated `NEXT_TASK.md`, `generated/landing.html`, and `index.html` so the next choice is either widening the remaining thin incomplete-work support or starting a small runnable local inspection workflow.
- Added `scripts/generate_dallas_inspection_workflow.py` and generated `generated/workflows/dallas-inspection-workflow-v1/action-queue.json` plus `action-queue.md`.
- The generated inspection workflow queue has `13` action items with priority, address, contractor, trigger inspection, recommended actions, and observed follow-up fields; this is the first product-shaped output beyond reports and contract summaries.
- Extended the workflow writer to emit `generated/workflows/dallas-inspection-workflow-v1/index.html`, a static browser-readable queue page with the same `13` action items.

## 2026-05-21

- Copied the Autom oat SVG mark from the matthoffner site repo into local static assets and generated assets so both `index.html` and `generated/landing.html` can resolve it.
- Refreshed the landing page header and hero to use the logo instead of the old dot mark, then tightened mobile layout with compact navigation pills, full-width calls to action, single-column content grids, better text wrapping for long code paths, and smaller mobile hero type.
- Synced `generated/landing.html` back to root `index.html` and verified the local static page plus logo asset served successfully from `http://127.0.0.1:4173/`.
- Recolored the Autom oat SVG away from the source site's teal/neon palette and into the landing page's ink, terracotta, cream, and clay colors.
- Rewrote the top-level landing message around a tangible moat candidate: local inspection failure memory, reviewed next-action labels, reusable eval contracts, and a workflow feedback loop from accepted, rejected, or edited recommendations.
- Corrected the landing page back toward the broader product thesis: `automoat` creates data moats automatically from repeated business workflows, while permit and inspection data remains only the first concrete MVP proof wedge.
- Added an Agent Cockpit section to the landing page that frames the product surface as a terminal/log tunnel into a bounded Codex loop, with loop runner, live terminal stream, artifact feed, and moat-memory concepts tied to existing repo artifacts.
- Added a real local MVP cockpit runtime: `scripts/run_mvp_loop.py` runs a visible loop that regenerates and verifies the Dallas contract, coverage, and action queue, while `scripts/serve_mvp_cockpit.py` starts the loop and streams log/status output in a browser.
- Added a read-only remote bridge path: `scripts/serve_mvp_cockpit.py --read-only` limits exposed routes to live status, loop logs, and whitelisted MVP artifacts, while `scripts/bridge_mvp_cockpit.py` opens an ngrok tunnel for remote observers.

## 2026-05-22

- Restarted the live MVP loop/cockpit and read-only ngrok bridge after the previous tunnel went offline.
- Embedded the fresh bridge URL directly into `generated/landing.html` and `index.html` as a non-iframe live panel under Agent Cockpit.
- The landing page now polls the bridge for `/api/status` and `.automoat/logs/mvp-loop.log`, rendering status, iteration, loop state, contract checks, queue count, and a terminal-style log tail inline.
- Verified the bridge URL `https://0626-140-186-106-90.ngrok-free.app` returns CORS preflight headers, live JSON status, and log output from the landing-page origin.
- Moved a live cockpit panel into the above-fold hero area so the Vercel landing page shows the running Codex loop immediately instead of burying it below the product sections.
- Added Vercel serverless proxy handlers at `api/cockpit-status.js` and `api/cockpit-log.js`, with `AUTOMOAT_BRIDGE_URL` support and the current ngrok URL as a fallback.
- Updated the landing-page cockpit script to refresh every cockpit panel, prefer same-origin Vercel proxy endpoints, and fall back to direct read-only bridge fetches when running as a plain static page.
- Restored the bridge after the previous ngrok endpoint went offline: restarted `scripts/serve_mvp_cockpit.py --auto-start --interval 6 --port 4174`, restarted `scripts/bridge_mvp_cockpit.py`, and updated the landing page plus Vercel API fallbacks to `https://7597-140-186-106-90.ngrok-free.app`.
- Tightened the Vercel proxy handlers so stale upstream bridge URLs return explicit `502` bridge errors instead of passing ngrok's offline HTML through as cockpit JSON/text.
- Fixed the repeated bridge failure by restarting the cockpit and bridge as detached OS-session processes instead of foreground tool sessions; the new processes are parented to PID 1 and should survive after this Codex turn ends.
- Updated the Vercel cockpit bridge fallback to `https://5694-140-186-106-90.ngrok-free.app` and ignored the detached-process pid/log files under `.automoat/`.
- Added `scripts/run_autonomous_agent_loop.py`, which writes the same cockpit status/log files but runs a real bounded `codex exec` iteration, then syncs landing output, checks the diff, commits changed paths except `.pxcode/preview.json`, and pushes to `main`.
- Updated `scripts/serve_mvp_cockpit.py` with `--loop-mode agent` / `--agent-loop`, and added `scripts/start_autonomous_cockpit_bridge.py` so the autonomous cockpit plus read-only bridge can be restarted as detached processes with one command.
- Refreshed the landing page and README copy so the cockpit is described as an autonomous Codex agent loop rather than only a deterministic Dallas artifact heartbeat.

## 2026-05-23

- Added local operator-correction capture for the Dallas inspection action queue: the generated workflow page now includes accept/reject/edit controls, preserves a source-controlled `operator-corrections.jsonl` ledger, and carries correction counts in `action-queue.json` plus `action-queue.md`.
- Added local-only `POST /api/operator-corrections` handling to `scripts/serve_mvp_cockpit.py`; read-only bridges can view correction summaries and the ledger but still reject mutations.
- Updated `scripts/run_mvp_loop.py` so cockpit status includes the workflow's operator-correction summary.
- Added a shared `scripts/operator_corrections.py` helper and `scripts/record_operator_correction.py` CLI so an operator can validate or append one accepted/rejected/edited Dallas queue correction without running the cockpit server.
- Added `--list-queue-items` to `scripts/record_operator_correction.py` so the non-server correction path can print current queue item IDs, trigger context, and recommended action IDs before appending or dry-running a decision.
- Added `--summary` to `scripts/record_operator_correction.py` and made `--list-queue-items` correction-aware so the non-server correction path shows total captured queue items, missing queue item IDs, and per-item captured/missing status before an operator records another Dallas decision.
- Added `--missing-only` to `scripts/record_operator_correction.py --list-queue-items` so the next non-server operator pass can print only Dallas queue items without captured corrections.
- Added `--next-missing` to `scripts/record_operator_correction.py` so a non-server operator pass can print one uncaptured Dallas queue item at a time with dry-run and append commands for accepted/rejected decisions plus edited-action templates.
- Extended `scripts/record_operator_correction.py --next-missing` so its suggested commands also include optional `--operator-note` variants for accepted, rejected, and edited corrections, making rationale capture executable without rebuilding the command by hand.
- Added an action ID catalog to `scripts/record_operator_correction.py --list-queue-items` and `--next-missing` so edited Dallas operator corrections can be filled from the CLI output without opening the action queue JSON.
- Added `--format text` to the read-only `scripts/record_operator_correction.py` modes so `--summary`, `--list-queue-items`, and `--next-missing` can print readable non-server operator work orders while keeping JSON as the default automation contract.
- Added `--validate-ledger` to `scripts/record_operator_correction.py` so the non-server operator path can verify captured Dallas correction events against the current queue item IDs, valid decisions, known action IDs, and accepted/rejected/edited action shapes before the next capture pass.
- Added `--use-next-missing` to `scripts/record_operator_correction.py` so the non-server operator path can dry-run or append the first uncaptured Dallas correction directly, without copying the queue item ID out of the work order.
- Tightened edited operator-correction capture so `scripts/operator_corrections.py` rejects unknown corrected action IDs before dry-run or append, keeping simple action-ID typos out of the Dallas correction ledger.
- Added `--require-missing` to `scripts/record_operator_correction.py` and included it in the generated next-missing work-order commands, so stale fixed-item capture commands fail cleanly if another correction has already been recorded for that Dallas queue item.
- Extended `scripts/record_operator_correction.py --format text` to correction dry-runs and appends, so the non-server Dallas operator path can show a readable event confirmation without changing the default JSON automation contract.
- Updated `scripts/record_operator_correction.py --next-missing --format text` so its copyable dry-run and append commands preserve `--format text`, keeping the non-server Dallas operator path readable end to end while JSON work orders remain machine-oriented.
- Updated `scripts/record_operator_correction.py --next-missing --format text` so the same work order now ends with a copyable text-mode `--validate-ledger` command, keeping the non-server Dallas correction pass executable through its final check.
- Updated `scripts/record_operator_correction.py --validate-ledger` so validation output includes captured versus missing queue item coverage and missing queue item IDs, making the final non-server check show both ledger validity and remaining Dallas correction work.
- Updated `scripts/record_operator_correction.py --next-missing` and `--list-queue-items` so read-only operator work orders include evidence and observed follow-up context from the Dallas action queue before asking for accepted/rejected/edited correction capture.
- Added `--require-complete` to `scripts/record_operator_correction.py --validate-ledger`, giving the non-server Dallas correction path a strict final gate that fails until every current queue item has a captured operator correction.
- Updated text-mode ledger validation with missing queue items to print the next `python3 scripts/record_operator_correction.py --next-missing --format text` work-order command, so validation points directly back to the next non-server capture pass.
- Tightened `scripts/record_operator_correction.py --validate-ledger` so it now rejects missing or duplicated `correction_id` values, catching deterministic replay collisions before the Dallas operator-correction ledger is treated as clean.
- Tightened `scripts/operator_corrections.py` so duplicate `correction_id` values are rejected before appending operator-correction events, keeping deterministic replay collisions out of the Dallas ledger instead of relying only on later validation.
- Tightened Dallas correction queue integrity so duplicate `queue_item_id` values now fail ledger validation and correction dry-runs/appends before an operator decision can attach to an ambiguous queue row.
- Updated text-mode Dallas correction dry-run and record confirmations so they now print the copyable ledger-validation, next-missing, and completion-gate commands immediately after the event summary.
- Tightened deterministic Dallas correction dry-runs so `scripts/record_operator_correction.py --dry-run` now rejects duplicate `correction_id` values against the selected ledger, matching append-time replay safety before an operator copies a reusable capture command.
- Added an expected-ID guard to non-server Dallas correction shortcut commands: `--next-missing` now prints `--expected-next-missing-id`, and `--use-next-missing` refuses to record if the first missing queue item changed after the work order was generated.
- Updated `scripts/record_operator_correction.py --summary --format text` so progress output includes copyable next-missing, ledger-validation, and completion-gate commands for the non-server Dallas operator-correction pass.
- Updated `scripts/record_operator_correction.py --next-missing --format text` so note-bearing dry-run shortcut and fixed-item command groups are printed before append commands, letting an operator validate the exact Dallas correction rationale before writing to the ledger.
- Added `scripts/record_operator_correction.py --smoke-check --format text`, a non-mutating readiness check that validates the Dallas correction ledger, confirms guarded next-missing commands are present, and builds accepted/rejected/edited dry-run event shapes before an operator writes to the ledger.
- Tightened `scripts/record_operator_correction.py --smoke-check --format text` so guarded shortcut checks now cover accepted, rejected, and edited command groups, including edited corrected-action templates and note dry-runs instead of only the accepted path.
- Tightened `scripts/record_operator_correction.py --smoke-check --format text` so fixed-item dry-run and append command groups now also have checked queue item IDs, `--require-missing` guards, note placeholders, and edited-action templates before an operator pass.
- Tightened `scripts/record_operator_correction.py --smoke-check --format text` so generated text-mode dry-run and append command groups must keep `--format text`, preserving readable confirmations throughout the non-server Dallas operator pass.
- Tightened `scripts/record_operator_correction.py --smoke-check --format text` so note-bearing append shortcut and fixed-item command groups now also verify `--operator-note`, stale-capture guards, text output, and queue identity guards before an operator writes to the ledger.
- Tightened `scripts/record_operator_correction.py --smoke-check` so it now honors the requested output mode: the default JSON smoke check verifies generated commands stay machine-readable, while `--format text` still verifies readable command preservation.
- Tightened `scripts/record_operator_correction.py --validate-ledger` so its next-missing command preserves the requested output mode, and extended the smoke check to catch JSON validation output that accidentally switches back to text-mode work orders.
- Tightened `scripts/record_operator_correction.py --smoke-check` again so summary/progress commands are checked for the requested output mode, keeping `--summary` JSON automation output from drifting into text-mode follow-up commands.
- Tightened `scripts/record_operator_correction.py --smoke-check` so shortcut command groups must use `--use-next-missing` and fixed-item command groups must stay on `--queue-item-id`, preventing generated Dallas work orders from mixing the two capture modes.
- Tightened `scripts/record_operator_correction.py --smoke-check` so it now verifies stale-capture rejection against a temporary correction ledger, proving `--require-missing` behavior without mutating the real Dallas operator-correction ledger.
- Tightened `scripts/record_operator_correction.py --smoke-check` so it now verifies `--next-missing` validation and completion follow-up commands preserve the requested JSON or text output mode through the final ledger checks.
- Tightened `scripts/record_operator_correction.py --smoke-check` so it now verifies stale expected-ID rejection for `--use-next-missing`, and reused the same next-missing resolver in the CLI capture path.
- Tightened `scripts/record_operator_correction.py --smoke-check` so it now verifies the strict completion gate rejects incomplete Dallas correction coverage before every queue item has a captured operator decision.
- Tightened `scripts/record_operator_correction.py --validate-ledger` so captured Dallas correction events must keep permit ID, inspection ID, and source permit number aligned with the current queue item, and extended `--smoke-check` with a temporary stale-context ledger guard.
- Captured the first non-server Dallas operator correction: `workflow-item:dallas:next-action:0008` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains one event, and the regenerated workflow summary reports `1` correction with `workflow-item:dallas:next-action:0004` as the next missing item.
- Captured the second non-server Dallas operator correction: `workflow-item:dallas:next-action:0004` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains two events, and the regenerated workflow summary reports `2` corrections with `workflow-item:dallas:next-action:0002` as the next missing item.
- Captured the third non-server Dallas operator correction: `workflow-item:dallas:next-action:0002` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains three events, and the regenerated workflow summary reports `3` corrections with `workflow-item:dallas:next-action:0009` as the next missing item.
- Captured the fourth non-server Dallas operator correction: `workflow-item:dallas:next-action:0009` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains four events, and the regenerated workflow summary reports `4` corrections with `workflow-item:dallas:next-action:0012` as the next missing item.
- Captured the fifth non-server Dallas operator correction: `workflow-item:dallas:next-action:0012` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains five events, and the regenerated workflow summary reports `5` corrections with `workflow-item:dallas:next-action:0013` as the next missing item.
- Captured the sixth non-server Dallas operator correction: `workflow-item:dallas:next-action:0013` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains six events, and the regenerated workflow summary reports `6` corrections with `workflow-item:dallas:next-action:0006` as the next missing item.
- Captured the seventh non-server Dallas operator correction: `workflow-item:dallas:next-action:0006` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains seven events, and the regenerated workflow summary reports `7` corrections with `workflow-item:dallas:next-action:0007` as the next missing item.
- Captured the eighth non-server Dallas operator correction: `workflow-item:dallas:next-action:0007` is accepted with a fixture-review note, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains eight events, and the regenerated workflow summary reports `8` corrections with `workflow-item:dallas:next-action:0010` as the next missing item.
- Captured the ninth non-server Dallas operator correction: `workflow-item:dallas:next-action:0010` is accepted from follow-up evidence, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains nine events, and the regenerated workflow summary reports `9` corrections with `workflow-item:dallas:next-action:0001` as the next missing item.
- Captured the tenth non-server Dallas operator correction: `workflow-item:dallas:next-action:0001` is accepted from fixture follow-up evidence, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains ten events, and the regenerated workflow summary reports `10` corrections with `workflow-item:dallas:next-action:0011` as the next missing item.
- Captured the eleventh non-server Dallas operator correction: `workflow-item:dallas:next-action:0011` is accepted from fixture follow-up evidence, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains eleven events, and the regenerated workflow summary reports `11` corrections with `workflow-item:dallas:next-action:0003` as the next missing item.
- Captured the twelfth non-server Dallas operator correction: `workflow-item:dallas:next-action:0003` is accepted from fixture follow-up evidence, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains twelve events, and the regenerated workflow summary reports `12` corrections with `workflow-item:dallas:next-action:0005` as the next missing item.
- Captured the thirteenth non-server Dallas operator correction: `workflow-item:dallas:next-action:0005` is accepted from fixture follow-up evidence, `generated/workflows/dallas-inspection-workflow-v1/operator-corrections.jsonl` now contains thirteen events, and the regenerated workflow plus completion gate report all `13` current queue items captured.
- Fed accepted operator corrections back into the Dallas workflow artifact: `scripts/generate_dallas_inspection_workflow.py` now emits `operator_correction_patterns`, and regenerated `action-queue.json`, `action-queue.md`, and `index.html` surface `6` accepted action patterns across all `13` captured queue items.
- Widened imported `v2` with one more Dallas electrical repair permit sequence that repeats the incomplete-work rough-in path, then regenerated the normalized, fixture, eval, coverage, contract, and workflow artifacts; imported `v2` now carries `14` permits, `40` inspections, `51` eval tasks, `20` reviewed label rows, and `62` source-lineage rows.
- Captured the fourteenth non-server Dallas operator correction: `workflow-item:dallas:next-action:0014` is accepted from fixture follow-up evidence, and the regenerated workflow plus completion gate report all `14` current queue items captured with `complete_remaining_work|schedule_reinspection` backed by two accepted correction examples; the workflow HTML generator now trims row fragments so regenerated pages pass whitespace checks.
- Added `scripts/record_operator_correction.py --list-patterns` so the non-server Dallas operator path can print the reusable accepted correction patterns directly in JSON or text, and extended the smoke check to verify the pattern payload plus completion-command output mode.
- Tightened `scripts/record_operator_correction.py --smoke-check` for completed Dallas ledgers: it now builds a temporary incomplete correction ledger, proves the next-missing work order still resolves, verifies the completion gate rejects incomplete coverage, and exercises accepted/rejected/edited dry-run event shapes without mutating the real ledger.
- Added `scripts/run_dallas_import_pipeline.py`, a non-server end-to-end command that refreshes the latest Dallas import sample from raw CSV through normalized rows, fixture pack, evals, coverage, contract summary, workflow, and strict correction-ledger validation; `scripts/import_dallas_permit_extracts.py` now writes a deterministic imported project timestamp so repeated pipeline runs avoid timestamp churn.
- Updated `scripts/run_dallas_import_pipeline.py` so its summary prints copyable pattern-review and completion-gate commands plus the generated coverage, contract, and workflow report paths; verified with the full Dallas import pipeline, accepted-pattern listing, and Python compile check.
- Updated `scripts/run_dallas_import_pipeline.py` so each deterministic Dallas import pipeline run also writes `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, giving the autonomous loop a durable contract/workflow/coverage/correction-gate summary to read after the command exits.
- Updated `scripts/run_dallas_import_pipeline.py` so the durable pipeline summary now embeds the latest Dallas coverage counts, thin counts, thin group names, and coverage next step; refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md` with the current all-repeated coverage snapshot.
- Updated `scripts/run_dallas_import_pipeline.py` so the durable pipeline summary now also embeds latest imported artifact counts, task-family counts, and inspection result vocabulary; refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, and verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py` plus `python3 scripts/run_dallas_import_pipeline.py`.
- Updated `scripts/run_dallas_import_pipeline.py` so the durable pipeline summary now embeds accepted operator-pattern details: action IDs, labels, queue-item support, failure reasons, inspection types, follow-up results, example permits, and queue IDs for all `6` accepted Dallas correction patterns. Refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, and verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py` plus `python3 scripts/run_dallas_import_pipeline.py`.
- Updated `scripts/run_dallas_import_pipeline.py` so the durable pipeline summary now embeds an `execution_readiness` gate combining contract pass state, complete operator corrections, strict correction-gate status, no thin coverage groups, and accepted operator-pattern availability. Refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, and verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py` plus `python3 scripts/run_dallas_import_pipeline.py`.
- Added `scripts/run_dallas_import_pipeline.py --require-ready`, which refreshes the same Dallas import pipeline and exits nonzero if the generated `execution_readiness` gate is blocked. Refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, then verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py` plus `python3 scripts/run_dallas_import_pipeline.py --require-ready`.
- Added `scripts/run_dallas_import_pipeline.py --summary-only --require-ready`, which skips artifact regeneration, still validates the Dallas correction completion gate, rebuilds the durable pipeline summary from current generated artifacts, and exits nonzero if execution readiness is blocked. Refreshed `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json` and `summary.md`, then verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py` plus `python3 scripts/run_dallas_import_pipeline.py --summary-only --require-ready`.
- Added `scripts/run_dallas_import_pipeline.py --format json`, which emits the final Dallas import summary as machine-readable stdout while routing summary-only notices, step logs, and child command output to stderr. Refreshed the durable pipeline summary with the JSON readiness command, then verified with `python3 -m py_compile scripts/run_dallas_import_pipeline.py`, `python3 scripts/run_dallas_import_pipeline.py --summary-only --require-ready --format json > /tmp/automoat-dallas-summary.json`, `python3 -m json.tool /tmp/automoat-dallas-summary.json > /tmp/automoat-dallas-summary.pretty.json`, `python3 scripts/run_dallas_import_pipeline.py --summary-only --require-ready`, and `git diff --check`.
- Exposed the durable Dallas import pipeline summary in loop status: `scripts/run_mvp_loop.py` and `scripts/run_autonomous_agent_loop.py` now add `artifacts.import_pipeline` to `.automoat/state/mvp-loop-status.json`, including execution-readiness status, blockers, gates, latest import counts, coverage thin groups, accepted pattern counts, and the JSON readiness command. Verified with Python compile, summary-only JSON readiness, JSON parsing, a one-iteration deterministic MVP loop, the autonomous-loop artifact inspector, and whitespace checks.
- Exposed Dallas import readiness in the landing-page cockpit: `generated/landing.html` and synced `index.html` now render `artifacts.import_pipeline.execution_readiness.status` beside loop state, contract checks, and queue items so the permit-data MVP readiness gate is visible to observers.
- Refreshed Dallas import readiness inside the loop path: `scripts/run_mvp_loop.py` now rebuilds the summary-only readiness gate before writing cockpit status, and `scripts/run_autonomous_agent_loop.py` runs the same gate after each bounded Codex edit before diff/publish checks so loop status does not read stale permit-data readiness.
- Updated the completed Dallas operator-correction summary path: `scripts/record_operator_correction.py --summary --format text` now prints the accepted-pattern review command and the summary-only import-readiness gate once all queue items are captured, and the smoke check verifies that follow-up command stays present only after completion.
- Added the parseable readiness handoff to completed Dallas correction summaries: `scripts/record_operator_correction.py --summary` now returns `import_readiness_json_command` with `--format json` after `14/14` corrections are captured, text summaries print the same JSON gate, and the smoke check verifies both text and JSON readiness commands stay hidden until coverage is complete.
- Exposed the last durable Dallas import-readiness snapshot in completed operator-correction summaries: `scripts/record_operator_correction.py --summary` now includes `last_import_readiness_summary` from `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json`, and text summaries show the last readiness status plus `ready_for_next_import_records` before the operator reruns the summary-only readiness gate.
- Added import-snapshot scale to completed Dallas correction summaries: `last_import_readiness_summary` now carries latest import counts, accepted pattern count, and coverage thin counts, while text summaries print those counts before the summary-only readiness rerun command.
- Added coverage thin group names to completed Dallas correction summaries: `last_import_readiness_summary` now carries `coverage_thin_groups`, text summaries print the exact thin coverage groups or `(none)`, and the smoke check verifies the added readiness snapshot contract.
- Added the durable import-readiness next step to completed Dallas correction summaries: `last_import_readiness_summary.next_step` now carries the pipeline handoff directly into `scripts/record_operator_correction.py --summary`, text summaries print it, and the smoke check verifies the completed-correction handoff contract.
- Added the next Dallas raw-import handoff to completed correction summaries: `last_import_readiness_summary.next_import_record_handoff` now names the raw `permits.csv`, `inspections.csv`, `contractors.csv`, and `rule_documents.csv` files plus the full `--require-ready` refresh command, and the smoke check verifies that machine-readable handoff.
- Added the next Dallas raw-import handoff directly to the durable pipeline summary: `scripts/run_dallas_import_pipeline.py` now writes `next_import_record_handoff` into `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json`, prints the raw CSV files in `summary.md` and text output, and keeps `--summary-only --require-ready --format json` self-contained for the next permit-data widening pass.
- Added raw CSV row counts to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_row_counts` for the four raw CSV inputs, and `scripts/record_operator_correction.py --summary` carries those counts into the completed correction handoff before the next permit-data widening pass.
- Added raw CSV headers to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_headers` for the four raw CSV inputs, and `scripts/record_operator_correction.py --summary` carries those headers into the completed correction handoff so the next import pass has file names, row counts, headers, and refresh commands together.
- Added raw CSV required fields to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_required_fields` for the importer-critical columns, and `scripts/record_operator_correction.py --summary` carries those fields into completed correction output so the next permit-data widening pass can distinguish required fields from optional headers before editing raw CSV rows.
- Added raw CSV optional fields to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_optional_fields` derived from headers minus required fields, and `scripts/record_operator_correction.py --summary` carries those optional columns into completed correction output so the next real Dallas row pass has required and optional field groups side by side.
- Added raw CSV append templates to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_append_templates` with importer-required cells marked as `<required>`, and `scripts/record_operator_correction.py --summary` carries those per-file row skeletons into completed correction output before the next real Dallas row-widening pass.
- Added raw CSV required-field gap counts to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_required_field_gaps`, `scripts/record_operator_correction.py --summary` and `--smoke-check --format text` surface the same preflight, and the refreshed pipeline summary shows zero missing required cells across the current raw Dallas CSV files.
- Added raw CSV import-scope counts to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_import_scope_counts`, `scripts/record_operator_correction.py --summary` carries those counts into completed correction output, and the refreshed pipeline summary shows `14/15` permit rows, `40/41` inspection rows, `5/6` contractor rows, and `3/3` rule document rows importable for the Dallas residential electrical MVP.
- Added raw CSV exclusion examples to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_exclusion_examples`, `scripts/record_operator_correction.py --summary` carries those examples into completed correction output, and the refreshed pipeline summary names the excluded plumbing permit, inspection, and contractor rows with CSV row numbers and exclusion reasons.
- Added raw CSV importable examples to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_importable_examples`, `scripts/record_operator_correction.py --summary` carries those in-scope row examples into completed correction output, and the refreshed pipeline summary shows concrete permit, inspection, contractor, and rule-document rows that will import into the Dallas residential electrical MVP.

## 2026-05-23

- Added an ordered raw CSV append sequence to the Dallas raw-handoff verifier: `scripts/run_dallas_import_pipeline.py --verify-raw-handoff` now returns `computed_raw_file_append_sequence` and `expected_raw_file_append_sequence` in JSON, and text output prints each raw file with the exact append path, CSV row number, header line, and required-cell template line.
- Added raw CSV next append rows to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_next_append_rows`, `scripts/record_operator_correction.py --summary` carries those row numbers into completed correction output, and the refreshed pipeline summary points the next raw edits at `permits.csv` row `17`, `inspections.csv` row `43`, `contractors.csv` row `8`, and `rule_documents.csv` row `5`.
- Added raw CSV last data rows to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_last_data_rows`, `scripts/record_operator_correction.py --summary` carries those terminal row previews into completed correction output, and the refreshed pipeline summary shows the last permit, inspection, contractor, and rule-document rows beside the next append rows.
- Added raw CSV identity key checks to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_identity_key_checks`, `scripts/record_operator_correction.py --summary` carries the duplicate-key preflight into completed correction output, and the refreshed pipeline summary shows zero duplicate permit, inspection, contractor, or rule-document identity keys before the next append pass.
- Added raw CSV value profiles to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_value_profiles`, `scripts/record_operator_correction.py --summary` carries the compact field vocabularies into completed correction output, and the refreshed pipeline summary shows the current trade, work class, permit status/type, inspection result/type, license type, and rule-document type distributions before the next append pass.
- Added raw CSV relationship checks to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_relationship_checks`, `scripts/record_operator_correction.py --summary` carries the linkage preflight into completed correction output, and the refreshed pipeline summary shows inspection-to-permit and permit-to-contractor links have zero unresolved rows before the next append pass.
- Added raw CSV date profiles to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_date_profiles`, `scripts/record_operator_correction.py --summary` carries the date coverage preflight into completed correction output, and the refreshed pipeline summary shows current permit, inspection, and rule-document date ranges with zero invalid date values before the next append pass.
- Added raw CSV fingerprints to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_fingerprints`, `scripts/record_operator_correction.py --summary` carries SHA-256 hashes and byte counts into completed correction output, and the refreshed pipeline summary gives the next append pass a deterministic snapshot check before editing raw Dallas CSV rows.
- Added a raw CSV append preflight to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_append_preflight`, `scripts/record_operator_correction.py --summary` carries the pass/block signal into completed correction output, and the refreshed pipeline summary reports `passed` across file presence, required fields, identity keys, date parsing, and relationship resolution before the next append pass.
- Added copyable raw CSV append-line templates to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_append_csv_templates`, `scripts/record_operator_correction.py --summary` carries the same header and template lines into completed correction output, and the refreshed pipeline summary gives the next append pass exact CSV header order plus `<required>` placeholders for each raw import file.
- Added a deterministic raw-handoff verification command for the Dallas next-import pass: `scripts/run_dallas_import_pipeline.py --verify-raw-handoff` now compares current raw CSV row counts, headers, fingerprints, and the saved append preflight against `generated/pipeline/dallas-import-pipeline-summary-v1/summary.json`, and completed correction summaries now surface both text and JSON verification commands before raw CSV editing.
- Tightened the Dallas raw-handoff verification command: `scripts/run_dallas_import_pipeline.py --verify-raw-handoff` now also blocks if saved next append row numbers or append CSV templates drift from current raw CSV row counts and headers, and the text/JSON output includes the verified template lines for the next append pass.
- Added a per-file raw CSV append work order to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes and verifies `raw_file_append_work_order` with file path, CSV row number, header line, and required-cell template line, while `scripts/record_operator_correction.py --summary` carries the same field after completed operator correction capture.
- Added a durable ordered raw CSV append sequence to the Dallas next-import handoff: `scripts/run_dallas_import_pipeline.py` now writes `raw_file_append_sequence` into the pipeline summary and verifies `raw_file_append_sequence_match` before raw edits, while `scripts/record_operator_correction.py --summary` carries the same sequence after completed correction capture.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0216` now adds two inspection rows that repeat the incomplete-work rough-in path, the non-server CLI captured `workflow-item:dallas:next-action:0015` as accepted, and the refreshed Dallas pipeline reports `ready` with `15/15` queue corrections, `15` imported permits, `42` imported inspections, `53` eval tasks, and next raw append rows at `permits.csv` row `18` and `inspections.csv` row `45`.
- Synced the README cockpit architecture note with the current Dallas operator-correction state: it now reports `15/15` queue items captured, matching the ready import summary before the next raw append pass.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0217` now adds an access-blocked final inspection plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0016` as accepted, and the refreshed Dallas pipeline reports `ready` with `16/16` queue corrections, `16` imported permits, `44` imported inspections, `55` eval tasks, `22` reviewed labels, and next raw append rows at `permits.csv` row `19` and `inspections.csv` row `47`.
- Synced the README cockpit architecture note after the `ELZ-2026-0217` append: it now reports `16/16` queue items captured, matching the ready import summary before the next raw append pass.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0218` now adds a repair rough-in partial for wiring/device completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0017` as accepted, and the refreshed Dallas pipeline reports `ready` with `17/17` queue corrections, `17` imported permits, `46` imported inspections, `57` eval tasks, `23` reviewed labels, `71` source-lineage rows, and next raw append rows at `permits.csv` row `20` and `inspections.csv` row `49`.
- Synced README, `NEXT_TASK.md`, `generated/landing.html`, and `index.html` with the current `17/17` Dallas operator-correction state and the latest imported `v2` counts.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0219` now adds a repair rough-in partial for AFCI/device completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0018` as accepted, and the refreshed Dallas pipeline reports `ready` with `18/18` queue corrections, `18` imported permits, `48` imported inspections, `59` eval tasks, `24` reviewed labels, `74` source-lineage rows, and next raw append rows at `permits.csv` row `21` and `inspections.csv` row `51`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0220` now adds a repair rough-in partial for receptacle/device completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0019` as accepted, and the refreshed Dallas pipeline reports `ready` with `19/19` queue corrections, `19` imported permits, `50` imported inspections, `61` eval tasks, `25` reviewed labels, `77` source-lineage rows, and next raw append rows at `permits.csv` row `22` and `inspections.csv` row `53`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0221` now adds a repair rough-in partial for wiring/device-box completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0020` as accepted, and the refreshed Dallas pipeline reports `ready` with `20/20` queue corrections, `20` imported permits, `52` imported inspections, `63` eval tasks, `26` reviewed labels, `80` source-lineage rows, and next raw append rows at `permits.csv` row `23` and `inspections.csv` row `55`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0222` now adds a repair rough-in partial for junction-cover/device-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0021` as accepted, and the refreshed Dallas pipeline reports `ready` with `21/21` queue corrections, `21` imported permits, `54` imported inspections, `65` eval tasks, `27` reviewed labels, `83` source-lineage rows, and next raw append rows at `permits.csv` row `24` and `inspections.csv` row `57`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0223` now adds a repair rough-in partial for switch-box/device-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0022` as accepted, and the refreshed Dallas pipeline reports `ready` with `22/22` queue corrections, `22` imported permits, `56` imported inspections, `67` eval tasks, `28` reviewed labels, `86` source-lineage rows, and next raw append rows at `permits.csv` row `25` and `inspections.csv` row `59`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0224` now adds a repair rough-in partial for dimmer-device completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0023` as accepted, and the refreshed Dallas pipeline reports `ready` with `23/23` queue corrections, `23` imported permits, `58` imported inspections, `69` eval tasks, `29` reviewed labels, `89` source-lineage rows, and next raw append rows at `permits.csv` row `26` and `inspections.csv` row `61`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0225` now adds a repair rough-in partial for occupancy-sensor and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0024` as accepted, and the refreshed Dallas pipeline reports `ready` with `24/24` queue corrections, `24` imported permits, `60` imported inspections, `71` eval tasks, `30` reviewed labels, `92` source-lineage rows, and next raw append rows at `permits.csv` row `27` and `inspections.csv` row `63`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0226` now adds a repair rough-in partial for smoke-alarm and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0025` as accepted, and the refreshed Dallas pipeline reports `ready` with `25/25` queue corrections, `25` imported permits, `62` imported inspections, `73` eval tasks, `31` reviewed labels, `95` source-lineage rows, and next raw append rows at `permits.csv` row `28` and `inspections.csv` row `65`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0227` now adds a repair rough-in partial for light-fixture and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0026` as accepted, and the refreshed Dallas pipeline reports `ready` with `26/26` queue corrections, `26` imported permits, `64` imported inspections, `75` eval tasks, `32` reviewed labels, `98` source-lineage rows, and next raw append rows at `permits.csv` row `29` and `inspections.csv` row `67`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0228` now adds a repair rough-in partial for weatherproof-cover and exterior-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0027` as accepted, and the refreshed Dallas pipeline reports `ready` with `27/27` queue corrections, `27` imported permits, `66` imported inspections, `77` eval tasks, `33` reviewed labels, `101` source-lineage rows, and next raw append rows at `permits.csv` row `30` and `inspections.csv` row `69`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0229` now adds a repair rough-in partial for exterior-GFCI and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0028` as accepted, and the refreshed Dallas pipeline reports `ready` with `28/28` queue corrections, `28` imported permits, `68` imported inspections, `79` eval tasks, `34` reviewed labels, `104` source-lineage rows, and next raw append rows at `permits.csv` row `31` and `inspections.csv` row `71`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0230` now adds a repair rough-in partial for exhaust-fan-timer device and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0029` as accepted, and the refreshed Dallas pipeline reports `ready` with `29/29` queue corrections, `29` imported permits, `70` imported inspections, `81` eval tasks, `35` reviewed labels, `107` source-lineage rows, and next raw append rows at `permits.csv` row `32` and `inspections.csv` row `73`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0231` now adds a repair rough-in partial for under-cabinet-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0030` as accepted, and the refreshed Dallas pipeline reports `ready` with `30/30` queue corrections, `30` imported permits, `72` imported inspections, `83` eval tasks, `36` reviewed labels, `110` source-lineage rows, and next raw append rows at `permits.csv` row `33` and `inspections.csv` row `75`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0232` now adds a repair rough-in partial for pendant-fixture and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0031` as accepted, and the refreshed Dallas pipeline reports `ready` with `31/31` queue corrections, `31` imported permits, `74` imported inspections, `85` eval tasks, `37` reviewed labels, `113` source-lineage rows, and next raw append rows at `permits.csv` row `34` and `inspections.csv` row `77`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0233` now adds a repair rough-in partial for recessed-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0032` as accepted, and the refreshed Dallas pipeline reports `ready` with `32/32` queue corrections, `32` imported permits, `76` imported inspections, `87` eval tasks, `38` reviewed labels, `116` source-lineage rows, and next raw append rows at `permits.csv` row `35` and `inspections.csv` row `79`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0234` now adds a repair rough-in partial for vanity-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0033` as accepted, and the refreshed Dallas pipeline reports `ready` with `33/33` queue corrections, `33` imported permits, `78` imported inspections, `89` eval tasks, `39` reviewed labels, `119` source-lineage rows, and next raw append rows at `permits.csv` row `36` and `inspections.csv` row `81`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0235` now adds a repair rough-in partial for sconce-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0034` as accepted, and the refreshed Dallas pipeline reports `ready` with `34/34` queue corrections, `34` imported permits, `80` imported inspections, `91` eval tasks, `40` reviewed labels, `122` source-lineage rows, and next raw append rows at `permits.csv` row `37` and `inspections.csv` row `83`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0236` now adds a repair rough-in partial for track-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0035` as accepted, and the refreshed Dallas pipeline reports `ready` with `35/35` queue corrections, `35` imported permits, `82` imported inspections, `93` eval tasks, `41` reviewed labels, `125` source-lineage rows, and next raw append rows at `permits.csv` row `38` and `inspections.csv` row `85`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0237` now adds a repair rough-in partial for ceiling-fan controls and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0036` as accepted, and the refreshed Dallas pipeline reports `ready` with `36/36` queue corrections, `36` imported permits, `84` imported inspections, `95` eval tasks, `42` reviewed labels, `128` source-lineage rows, and next raw append rows at `permits.csv` row `39` and `inspections.csv` row `87`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0238` now adds a repair rough-in partial for chandelier controls and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0037` as accepted, and the refreshed Dallas pipeline reports `ready` with `37/37` queue corrections, `37` imported permits, `86` imported inspections, `97` eval tasks, `43` reviewed labels, `131` source-lineage rows, and next raw append rows at `permits.csv` row `40` and `inspections.csv` row `89`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0239` now adds a repair rough-in partial for exterior-coach-light completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0038` as accepted, and the refreshed Dallas pipeline reports `ready` with `38/38` queue corrections, `38` imported permits, `88` imported inspections, `99` eval tasks, `44` reviewed labels, `134` source-lineage rows, and next raw append rows at `permits.csv` row `41` and `inspections.csv` row `91`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0240` now adds a repair rough-in partial for motion-sensor lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0039` as accepted, and the refreshed Dallas pipeline reports `ready` with `39/39` queue corrections, `39` imported permits, `90` imported inspections, `101` eval tasks, `45` reviewed labels, `137` source-lineage rows, and next raw append rows at `permits.csv` row `42` and `inspections.csv` row `93`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0241` now adds a repair rough-in partial for security-floodlight and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0040` as accepted, and the refreshed Dallas pipeline reports `ready` with `40/40` queue corrections, `40` imported permits, `92` imported inspections, `103` eval tasks, `46` reviewed labels, `140` source-lineage rows, and next raw append rows at `permits.csv` row `43` and `inspections.csv` row `95`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0242` now adds a repair rough-in partial for pathway-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0041` as accepted, and the refreshed Dallas pipeline reports `ready` with `41/41` queue corrections, `41` imported permits, `94` imported inspections, `105` eval tasks, `47` reviewed labels, `143` source-lineage rows, and next raw append rows at `permits.csv` row `44` and `inspections.csv` row `97`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0243` now adds a repair rough-in partial for bollard-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0042` as accepted, and the refreshed Dallas pipeline reports `ready` with `42/42` queue corrections, `42` imported permits, `96` imported inspections, `107` eval tasks, `48` reviewed labels, `146` source-lineage rows, and next raw append rows at `permits.csv` row `45` and `inspections.csv` row `99`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0244` now adds a repair rough-in partial for gate-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0043` as accepted, and the refreshed Dallas pipeline reports `ready` with `43/43` queue corrections, `43` imported permits, `98` imported inspections, `109` eval tasks, `49` reviewed labels, `149` source-lineage rows, and next raw append rows at `permits.csv` row `46` and `inspections.csv` row `101`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0245` now adds a repair rough-in partial for task-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0044` as accepted, and the refreshed Dallas pipeline reports `ready` with `44/44` queue corrections, `44` imported permits, `100` imported inspections, `111` eval tasks, `50` reviewed labels, `152` source-lineage rows, and next raw append rows at `permits.csv` row `47` and `inspections.csv` row `103`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0246` now adds a repair rough-in partial for canopy-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0045` as accepted, and the refreshed Dallas pipeline reports `ready` with `45/45` queue corrections, `45` imported permits, `102` imported inspections, `113` eval tasks, `51` reviewed labels, `155` source-lineage rows, and next raw append rows at `permits.csv` row `48` and `inspections.csv` row `105`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0247` now adds a repair rough-in partial for step-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0046` as an edited correction from `ensure_site_access|schedule_reinspection` to `complete_remaining_work|schedule_reinspection`, and the refreshed Dallas pipeline reports `ready` with `46/46` queue corrections, `46` imported permits, `104` imported inspections, `115` eval tasks, `52` reviewed labels, `158` source-lineage rows, and next raw append rows at `permits.csv` row `49` and `inspections.csv` row `107`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0248` now adds a repair rough-in partial for utility-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0047` as accepted, and the refreshed Dallas pipeline reports `ready` with `47/47` queue corrections, `47` imported permits, `106` imported inspections, `117` eval tasks, `53` reviewed labels, `161` source-lineage rows, and next raw append rows at `permits.csv` row `50` and `inspections.csv` row `109`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0249` now adds a repair rough-in partial for closet-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0048` as accepted, and the refreshed Dallas pipeline reports `ready` with `48/48` queue corrections, `48` imported permits, `108` imported inspections, `119` eval tasks, `54` reviewed labels, `164` source-lineage rows, and next raw append rows at `permits.csv` row `51` and `inspections.csv` row `111`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0250` now adds a repair rough-in partial for recessed closet fixtures and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0049` as accepted, and the refreshed Dallas pipeline reports `ready` with `49/49` queue corrections, `49` imported permits, `110` imported inspections, `121` eval tasks, `55` reviewed labels, `167` source-lineage rows, and next raw append rows at `permits.csv` row `52` and `inspections.csv` row `113`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0251` now adds a repair rough-in partial for under-shelf lighting plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0050` as accepted, and the refreshed Dallas pipeline reports `ready` with `50/50` queue corrections, `50` imported permits, `112` imported inspections, `123` eval tasks, `56` reviewed labels, `170` source-lineage rows, and next raw append rows at `permits.csv` row `53` and `inspections.csv` row `115`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0252` now adds a repair rough-in partial for shelf lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0051` as accepted, and the refreshed Dallas pipeline reports `ready` with `51/51` queue corrections, `51` imported permits, `114` imported inspections, `125` eval tasks, `57` reviewed labels, `173` source-lineage rows, and next raw append rows at `permits.csv` row `54` and `inspections.csv` row `117`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0253` now adds a repair rough-in partial for ceiling-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0052` as accepted, and the refreshed Dallas pipeline reports `ready` with `52/52` queue corrections, `52` imported permits, `116` imported inspections, `127` eval tasks, `58` reviewed labels, `176` source-lineage rows, and next raw append rows at `permits.csv` row `55` and `inspections.csv` row `119`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0254` now adds a repair rough-in partial for pendant lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0053` as an edited correction from `ensure_site_access|schedule_reinspection` to `complete_remaining_work|schedule_reinspection`, and the refreshed Dallas pipeline reports `ready` with `53/53` queue corrections, `53` imported permits, `118` imported inspections, `129` eval tasks, `59` reviewed labels, `179` source-lineage rows, and next raw append rows at `permits.csv` row `56` and `inspections.csv` row `121`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0255` now adds a repair rough-in partial for cove-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0054` as accepted, and the refreshed Dallas pipeline reports `ready` with `54/54` queue corrections, `54` imported permits, `120` imported inspections, `131` eval tasks, `60` reviewed labels, `182` source-lineage rows, and next raw append rows at `permits.csv` row `57` and `inspections.csv` row `123`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0256` now adds a repair rough-in partial for mirror-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0055` as accepted, and the refreshed Dallas pipeline reports `ready` with `55/55` queue corrections, `55` imported permits, `122` imported inspections, `133` eval tasks, `61` reviewed labels, `185` source-lineage rows, and next raw append rows at `permits.csv` row `58` and `inspections.csv` row `125`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0257` now adds a repair rough-in partial for strip-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0056` as accepted, and the refreshed Dallas pipeline reports `ready` with `56/56` queue corrections, `56` imported permits, `124` imported inspections, `135` eval tasks, `62` reviewed labels, `188` source-lineage rows, and next raw append rows at `permits.csv` row `59` and `inspections.csv` row `127`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0258` now adds a repair rough-in partial for linear-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0057` as accepted, and the refreshed Dallas pipeline reports `ready` with `57/57` queue corrections, `57` imported permits, `126` imported inspections, `137` eval tasks, `63` reviewed labels, `191` source-lineage rows, and next raw append rows at `permits.csv` row `60` and `inspections.csv` row `129`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0259` now adds a repair rough-in partial for tape-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0058` as accepted, and the refreshed Dallas pipeline reports `ready` with `58/58` queue corrections, `58` imported permits, `128` imported inspections, `139` eval tasks, `64` reviewed labels, `194` source-lineage rows, and next raw append rows at `permits.csv` row `61` and `inspections.csv` row `131`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0260` now adds a repair rough-in partial for pantry puck-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0059` as accepted, and the refreshed Dallas pipeline reports `ready` with `59/59` queue corrections, `59` imported permits, `130` imported inspections, `141` eval tasks, `65` reviewed labels, `197` source-lineage rows, and next raw append rows at `permits.csv` row `62` and `inspections.csv` row `133`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0261` now adds a repair rough-in partial for storage-closet rail-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0060` as accepted, and the refreshed Dallas pipeline reports `ready` with `60/60` queue corrections, `60` imported permits, `132` imported inspections, `143` eval tasks, `66` reviewed labels, `200` source-lineage rows, and next raw append rows at `permits.csv` row `63` and `inspections.csv` row `135`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0262` now adds a repair rough-in partial for rear-closet channel-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0061` as accepted, and the refreshed Dallas pipeline reports `ready` with `61/61` queue corrections, `61` imported permits, `134` imported inspections, `145` eval tasks, `67` reviewed labels, `203` source-lineage rows, and next raw append rows at `permits.csv` row `64` and `inspections.csv` row `137`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0263` now adds a repair rough-in partial for hall-closet rod-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0062` as accepted, and the refreshed Dallas pipeline reports `ready` with `62/62` queue corrections, `62` imported permits, `136` imported inspections, `147` eval tasks, `68` reviewed labels, `206` source-lineage rows, and next raw append rows at `permits.csv` row `65` and `inspections.csv` row `139`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0264` now adds a repair rough-in partial for front-closet track-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0063` as accepted, and the refreshed Dallas pipeline reports `ready` with `63/63` queue corrections, `63` imported permits, `138` imported inspections, `149` eval tasks, `69` reviewed labels, `209` source-lineage rows, and next raw append rows at `permits.csv` row `66` and `inspections.csv` row `141`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0265` now adds a repair rough-in partial for back-hall-closet bar lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0064` as accepted, and the refreshed Dallas pipeline reports `ready` with `64/64` queue corrections, `64` imported permits, `140` imported inspections, `151` eval tasks, `70` reviewed labels, `212` source-lineage rows, and next raw append rows at `permits.csv` row `67` and `inspections.csv` row `143`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0266` now adds a repair rough-in partial for stair-closet bulkhead-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0065` as accepted, and the refreshed Dallas pipeline reports `ready` with `65/65` queue corrections, `65` imported permits, `142` imported inspections, `153` eval tasks, `71` reviewed labels, `215` source-lineage rows, and next raw append rows at `permits.csv` row `68` and `inspections.csv` row `145`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0267` now adds a repair rough-in partial for linen-closet shelf-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0066` as accepted, and the refreshed Dallas pipeline reports `ready` with `66/66` queue corrections, `66` imported permits, `144` imported inspections, `155` eval tasks, `72` reviewed labels, `218` source-lineage rows, and next raw append rows at `permits.csv` row `69` and `inspections.csv` row `147`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0268` now adds a repair rough-in partial for foyer-closet cove lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0067` as accepted, and the refreshed Dallas pipeline reports `ready` with `67/67` queue corrections, `67` imported permits, `146` imported inspections, `157` eval tasks, `73` reviewed labels, `221` source-lineage rows, and next raw append rows at `permits.csv` row `70` and `inspections.csv` row `149`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0269` now adds a repair rough-in partial for entry-closet valance lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0068` as an edited correction from `ensure_site_access|schedule_reinspection` to `complete_remaining_work|schedule_reinspection`, and the refreshed Dallas pipeline reports `ready` with `68/68` queue corrections, `68` imported permits, `148` imported inspections, `159` eval tasks, `74` reviewed labels, `224` source-lineage rows, and next raw append rows at `permits.csv` row `71` and `inspections.csv` row `151`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0270` now adds a repair rough-in partial for bedroom-closet soffit lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0069` as accepted, and the refreshed Dallas pipeline reports `ready` with `69/69` queue corrections, `69` imported permits, `150` imported inspections, `161` eval tasks, `75` reviewed labels, `227` source-lineage rows, and next raw append rows at `permits.csv` row `72` and `inspections.csv` row `153`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0271` now adds a repair rough-in partial for upstairs-closet cabinet lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0070` as accepted, and the refreshed Dallas pipeline reports `ready` with `70/70` queue corrections, `70` imported permits, `152` imported inspections, `163` eval tasks, `76` reviewed labels, `230` source-lineage rows, and next raw append rows at `permits.csv` row `73` and `inspections.csv` row `155`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0272` now adds a repair rough-in partial for downstairs-closet niche lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0071` as accepted, and the refreshed Dallas pipeline reports `ready` with `71/71` queue corrections, `71` imported permits, `154` imported inspections, `165` eval tasks, `77` reviewed labels, `233` source-lineage rows, and next raw append rows at `permits.csv` row `74` and `inspections.csv` row `157`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0273` now adds a repair rough-in partial for pantry-closet toe-kick lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0072` as accepted, and the refreshed Dallas pipeline reports `ready` with `72/72` queue corrections, `72` imported permits, `156` imported inspections, `167` eval tasks, `78` reviewed labels, `236` source-lineage rows, and next raw append rows at `permits.csv` row `75` and `inspections.csv` row `159`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0274` now adds a repair rough-in partial for rear-pantry accent lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0073` as accepted, and the refreshed Dallas pipeline reports `ready` with `73/73` queue corrections, `73` imported permits, `158` imported inspections, `169` eval tasks, `79` reviewed labels, `239` source-lineage rows, and next raw append rows at `permits.csv` row `76` and `inspections.csv` row `161`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0275` now adds a repair rough-in partial for side-pantry task lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0074` as accepted, and the refreshed Dallas pipeline reports `ready` with `74/74` queue corrections, `74` imported permits, `160` imported inspections, `171` eval tasks, `80` reviewed labels, `242` source-lineage rows, and next raw append rows at `permits.csv` row `77` and `inspections.csv` row `163`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0276` now adds a repair rough-in partial for west-pantry under-cabinet lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0075` as accepted, and the refreshed Dallas pipeline reports `ready` with `75/75` queue corrections, `75` imported permits, `162` imported inspections, `173` eval tasks, `81` reviewed labels, `245` source-lineage rows, and next raw append rows at `permits.csv` row `78` and `inspections.csv` row `165`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0277` now adds a repair rough-in partial for east-pantry linear lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0076` as accepted, and the refreshed Dallas pipeline reports `ready` with `76/76` queue corrections, `76` imported permits, `164` imported inspections, `175` eval tasks, `82` reviewed labels, `248` source-lineage rows, and next raw append rows at `permits.csv` row `79` and `inspections.csv` row `167`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0278` now adds a repair rough-in partial for north-pantry display lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0077` as accepted, and the refreshed Dallas pipeline reports `ready` with `77/77` queue corrections, `77` imported permits, `166` imported inspections, `177` eval tasks, `83` reviewed labels, `251` source-lineage rows, and next raw append rows at `permits.csv` row `80` and `inspections.csv` row `169`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0279` now adds a repair rough-in partial for south-pantry picture lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0078` as accepted, and the refreshed Dallas pipeline reports `ready` with `78/78` queue corrections, `78` imported permits, `168` imported inspections, `179` eval tasks, `84` reviewed labels, `254` source-lineage rows, and next raw append rows at `permits.csv` row `81` and `inspections.csv` row `171`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0280` now adds a repair rough-in partial for center-pantry rail-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0079` as accepted, and the refreshed Dallas pipeline reports `ready` with `79/79` queue corrections, `79` imported permits, `170` imported inspections, `181` eval tasks, `85` reviewed labels, `257` source-lineage rows, and next raw append rows at `permits.csv` row `82` and `inspections.csv` row `173`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0281` now adds a repair rough-in partial for upper-pantry puck-lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0080` as accepted, and the refreshed Dallas pipeline reports `ready` with `80/80` queue corrections, `80` imported permits, `172` imported inspections, `183` eval tasks, `86` reviewed labels, `260` source-lineage rows, and next raw append rows at `permits.csv` row `83` and `inspections.csv` row `175`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0282` now adds a repair rough-in partial for lower-pantry rope lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0081` as accepted, and the refreshed Dallas pipeline reports `ready` with `81/81` queue corrections, `81` imported permits, `174` imported inspections, `185` eval tasks, `87` reviewed labels, `263` source-lineage rows, and next raw append rows at `permits.csv` row `84` and `inspections.csv` row `177`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0283` now adds a repair rough-in partial for corner-pantry accent-strip lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0082` as accepted, and the refreshed Dallas pipeline reports `ready` with `82/82` queue corrections, `82` imported permits, `176` imported inspections, `187` eval tasks, `88` reviewed labels, `266` source-lineage rows, and next raw append rows at `permits.csv` row `85` and `inspections.csv` row `179`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0284` now adds a repair rough-in partial for rear-hall-pantry cove lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0083` as accepted, and the refreshed Dallas pipeline reports `ready` with `83/83` queue corrections, `83` imported permits, `178` imported inspections, `189` eval tasks, `89` reviewed labels, `269` source-lineage rows, and next raw append rows at `permits.csv` row `86` and `inspections.csv` row `181`.

## 2026-05-24

- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0285` now adds a repair rough-in partial for front-hall-pantry valance lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0084` as accepted, and the refreshed Dallas pipeline reports `ready` with `84/84` queue corrections, `84` imported permits, `180` imported inspections, `191` eval tasks, `90` reviewed labels, `272` source-lineage rows, and next raw append rows at `permits.csv` row `87` and `inspections.csv` row `183`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0286` now adds a repair rough-in partial for side-hall-pantry shelf lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0085` as accepted, and the refreshed Dallas pipeline reports `ready` with `85/85` queue corrections, `85` imported permits, `182` imported inspections, `193` eval tasks, `91` reviewed labels, `275` source-lineage rows, and next raw append rows at `permits.csv` row `88` and `inspections.csv` row `185`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0287` now adds a repair rough-in partial for middle-hall-pantry ceiling-strip lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0086` as accepted, and the refreshed Dallas pipeline reports `ready` with `86/86` queue corrections, `86` imported permits, `184` imported inspections, `195` eval tasks, `92` reviewed labels, `278` source-lineage rows, and next raw append rows at `permits.csv` row `89` and `inspections.csv` row `187`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0288` now adds a repair rough-in partial for rear-annex-pantry under-shelf lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0087` as accepted, and the refreshed Dallas pipeline reports `ready` with `87/87` queue corrections, `87` imported permits, `186` imported inspections, `197` eval tasks, `93` reviewed labels, `281` source-lineage rows, and next raw append rows at `permits.csv` row `90` and `inspections.csv` row `189`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0289` now adds a repair rough-in partial for east-annex-pantry toe-kick lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0088` as accepted, and the refreshed Dallas pipeline reports `ready` with `88/88` queue corrections, `88` imported permits, `188` imported inspections, `199` eval tasks, `94` reviewed labels, `284` source-lineage rows, and next raw append rows at `permits.csv` row `91` and `inspections.csv` row `191`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0290` now adds a repair rough-in partial for west-annex-pantry baseboard lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0089` as accepted, and the refreshed Dallas pipeline reports `ready` with `89/89` queue corrections, `89` imported permits, `190` imported inspections, `201` eval tasks, `95` reviewed labels, `287` source-lineage rows, and next raw append rows at `permits.csv` row `92` and `inspections.csv` row `193`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0291` now adds a repair rough-in partial for north-annex-pantry display lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0090` as accepted, and the refreshed Dallas pipeline reports `ready` with `90/90` queue corrections, `90` imported permits, `192` imported inspections, `203` eval tasks, `96` reviewed labels, `290` source-lineage rows, and next raw append rows at `permits.csv` row `93` and `inspections.csv` row `195`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0292` now adds a repair rough-in partial for south-annex-pantry picture lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0091` as accepted, and the refreshed Dallas pipeline reports `ready` with `91/91` queue corrections, `91` imported permits, `194` imported inspections, `205` eval tasks, `97` reviewed labels, `293` source-lineage rows, and next raw append rows at `permits.csv` row `94` and `inspections.csv` row `197`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0293` now adds a repair rough-in partial for garden-annex-pantry cove lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0092` as accepted, and the refreshed Dallas pipeline reports `ready` with `92/92` queue corrections, `92` imported permits, `196` imported inspections, `207` eval tasks, `98` reviewed labels, `296` source-lineage rows, and next raw append rows at `permits.csv` row `95` and `inspections.csv` row `199`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0294` now adds a repair rough-in partial for west-garden-annex-pantry valance lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0093` as accepted, and the refreshed Dallas pipeline reports `ready` with `93/93` queue corrections, `93` imported permits, `198` imported inspections, `209` eval tasks, `99` reviewed labels, `299` source-lineage rows, and next raw append rows at `permits.csv` row `96` and `inspections.csv` row `201`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0295` now adds a repair rough-in partial for east-garden-annex-pantry lantern-strip lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0094` as accepted, and the refreshed Dallas pipeline reports `ready` with `94/94` queue corrections, `94` imported permits, `200` imported inspections, `211` eval tasks, `100` reviewed labels, `302` source-lineage rows, and next raw append rows at `permits.csv` row `97` and `inspections.csv` row `203`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0296` now adds a repair rough-in partial for north-garden-annex-pantry shelf lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0095` as accepted, and the refreshed Dallas pipeline reports `ready` with `95/95` queue corrections, `95` imported permits, `202` imported inspections, `213` eval tasks, `101` reviewed labels, `305` source-lineage rows, and next raw append rows at `permits.csv` row `98` and `inspections.csv` row `205`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0297` now adds a repair rough-in partial for south-garden-annex-pantry picture-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0096` as accepted, and the refreshed Dallas pipeline reports `ready` with `96/96` queue corrections, `96` imported permits, `204` imported inspections, `215` eval tasks, `102` reviewed labels, `308` source-lineage rows, and next raw append rows at `permits.csv` row `99` and `inspections.csv` row `207`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0298` now adds a repair rough-in partial for east-conservatory-pantry under-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0097` as accepted, and the refreshed Dallas pipeline reports `ready` with `97/97` queue corrections, `97` imported permits, `206` imported inspections, `217` eval tasks, `103` reviewed labels, `311` source-lineage rows, and next raw append rows at `permits.csv` row `100` and `inspections.csv` row `209`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0299` now adds a repair rough-in partial for west-conservatory-pantry cove-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0098` as accepted, and the refreshed Dallas pipeline reports `ready` with `98/98` queue corrections, `98` imported permits, `208` imported inspections, `219` eval tasks, `104` reviewed labels, `314` source-lineage rows, and next raw append rows at `permits.csv` row `101` and `inspections.csv` row `211`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0300` now adds a repair rough-in partial for south-conservatory-pantry lantern-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0099` as accepted, and the refreshed Dallas pipeline reports `ready` with `99/99` queue corrections, `99` imported permits, `210` imported inspections, `221` eval tasks, `105` reviewed labels, `317` source-lineage rows, and next raw append rows at `permits.csv` row `102` and `inspections.csv` row `213`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0301` now adds a repair rough-in partial for north-conservatory-pantry valance-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0100` as accepted, and the refreshed Dallas pipeline reports `ready` with `100/100` queue corrections, `100` imported permits, `212` imported inspections, `223` eval tasks, `106` reviewed labels, `320` source-lineage rows, and next raw append rows at `permits.csv` row `103` and `inspections.csv` row `215`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0302` now adds a repair rough-in partial for east-mezzanine-pantry gallery-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0101` as accepted, and the refreshed Dallas pipeline reports `ready` with `101/101` queue corrections, `101` imported permits, `214` imported inspections, `225` eval tasks, `107` reviewed labels, `323` source-lineage rows, and next raw append rows at `permits.csv` row `104` and `inspections.csv` row `217`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0303` now adds a repair rough-in partial for west-mezzanine-pantry display-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0102` as accepted, and the refreshed Dallas pipeline reports `ready` with `102/102` queue corrections, `102` imported permits, `216` imported inspections, `227` eval tasks, `108` reviewed labels, `326` source-lineage rows, and next raw append rows at `permits.csv` row `105` and `inspections.csv` row `219`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0304` now adds a repair rough-in partial for north-mezzanine-pantry canopy-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0103` as accepted, and the refreshed Dallas pipeline reports `ready` with `103/103` queue corrections, `103` imported permits, `218` imported inspections, `229` eval tasks, `109` reviewed labels, `329` source-lineage rows, and next raw append rows at `permits.csv` row `106` and `inspections.csv` row `221`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0305` now adds a repair rough-in partial for south-mezzanine-pantry bulkhead-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0104` as accepted, and the refreshed Dallas pipeline reports `ready` with `104/104` queue corrections, `104` imported permits, `220` imported inspections, `231` eval tasks, `110` reviewed labels, `332` source-lineage rows, and next raw append rows at `permits.csv` row `107` and `inspections.csv` row `223`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0306` now adds a repair rough-in partial for east-loft-pantry shelf-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0105` as accepted, and the refreshed Dallas pipeline reports `ready` with `105/105` queue corrections, `105` imported permits, `222` imported inspections, `233` eval tasks, `111` reviewed labels, `335` source-lineage rows, and next raw append rows at `permits.csv` row `108` and `inspections.csv` row `225`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0307` now adds a repair rough-in partial for west-loft-pantry track-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0106` as accepted, and the refreshed Dallas pipeline reports `ready` with `106/106` queue corrections, `106` imported permits, `224` imported inspections, `235` eval tasks, `112` reviewed labels, `338` source-lineage rows, and next raw append rows at `permits.csv` row `109` and `inspections.csv` row `227`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0308` now adds a repair rough-in partial for south-loft-pantry cove-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0107` as accepted, and the refreshed Dallas pipeline reports `ready` with `107/107` queue corrections, `107` imported permits, `226` imported inspections, `237` eval tasks, `113` reviewed labels, `341` source-lineage rows, and next raw append rows at `permits.csv` row `110` and `inspections.csv` row `229`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0309` now adds a repair rough-in partial for north-attic-pantry cornice-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0108` as accepted, and the refreshed Dallas pipeline reports `ready` with `108/108` queue corrections, `108` imported permits, `228` imported inspections, `239` eval tasks, `114` reviewed labels, `344` source-lineage rows, and next raw append rows at `permits.csv` row `111` and `inspections.csv` row `231`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0310` now adds a repair rough-in partial for east-attic-pantry pendant-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0109` as accepted, and the refreshed Dallas pipeline reports `ready` with `109/109` queue corrections, `109` imported permits, `230` imported inspections, `241` eval tasks, `115` reviewed labels, `347` source-lineage rows, and next raw append rows at `permits.csv` row `112` and `inspections.csv` row `233`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0311` now adds a repair rough-in partial for west-attic-pantry gallery-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0110` as accepted, and the refreshed Dallas pipeline reports `ready` with `110/110` queue corrections, `110` imported permits, `232` imported inspections, `243` eval tasks, `116` reviewed labels, `350` source-lineage rows, and next raw append rows at `permits.csv` row `113` and `inspections.csv` row `235`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0312` now adds a repair rough-in partial for south-attic-pantry transom-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0111` as accepted, and the refreshed Dallas pipeline reports `ready` with `111/111` queue corrections, `111` imported permits, `234` imported inspections, `245` eval tasks, `117` reviewed labels, `353` source-lineage rows, and next raw append rows at `permits.csv` row `114` and `inspections.csv` row `237`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0313` now adds a repair rough-in partial for north-annex-attic pantry soffit-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0112` as accepted, and the refreshed Dallas pipeline reports `ready` with `112/112` queue corrections, `112` imported permits, `236` imported inspections, `247` eval tasks, `118` reviewed labels, `356` source-lineage rows, and next raw append rows at `permits.csv` row `115` and `inspections.csv` row `239`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0314` now adds a repair rough-in partial for south-annex-attic pantry lintel-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0113` as accepted, and the refreshed Dallas pipeline reports `ready` with `113/113` queue corrections, `113` imported permits, `238` imported inspections, `249` eval tasks, `119` reviewed labels, `359` source-lineage rows, and next raw append rows at `permits.csv` row `116` and `inspections.csv` row `241`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0315` now adds a repair rough-in partial for east-annex-attic pantry clerestory-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0114` as accepted, and the refreshed Dallas pipeline reports `ready` with `114/114` queue corrections, `114` imported permits, `240` imported inspections, `251` eval tasks, `120` reviewed labels, `362` source-lineage rows, and next raw append rows at `permits.csv` row `117` and `inspections.csv` row `243`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0316` now adds a repair rough-in partial for west-annex-attic pantry pilaster-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0115` as accepted, and the refreshed Dallas pipeline reports `ready` with `115/115` queue corrections, `115` imported permits, `242` imported inspections, `253` eval tasks, `121` reviewed labels, `365` source-lineage rows, and next raw append rows at `permits.csv` row `118` and `inspections.csv` row `245`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0317` now adds a repair rough-in partial for north wing attic pantry mullion-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0116` as accepted, and the refreshed Dallas pipeline reports `ready` with `116/116` queue corrections, `116` imported permits, `244` imported inspections, `255` eval tasks, `122` reviewed labels, `368` source-lineage rows, and next raw append rows at `permits.csv` row `119` and `inspections.csv` row `247`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0318` now adds a repair rough-in partial for south wing attic pantry stile-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0117` as accepted, and the refreshed Dallas pipeline reports `ready` with `117/117` queue corrections, `117` imported permits, `246` imported inspections, `257` eval tasks, `123` reviewed labels, `371` source-lineage rows, and next raw append rows at `permits.csv` row `120` and `inspections.csv` row `249`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0319` now adds a repair rough-in partial for east wing attic pantry header-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0118` as accepted, and the refreshed Dallas pipeline reports `ready` with `118/118` queue corrections, `118` imported permits, `248` imported inspections, `259` eval tasks, `124` reviewed labels, `374` source-lineage rows, and next raw append rows at `permits.csv` row `121` and `inspections.csv` row `251`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0320` now adds a repair rough-in partial for west wing attic pantry cap-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0119` as accepted, and the refreshed Dallas pipeline reports `ready` with `119/119` queue corrections, `119` imported permits, `250` imported inspections, `261` eval tasks, `125` reviewed labels, `377` source-lineage rows, and next raw append rows at `permits.csv` row `122` and `inspections.csv` row `253`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0321` now adds a repair rough-in partial for north porch attic pantry jamb-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0120` as accepted, and the refreshed Dallas pipeline reports `ready` with `120/120` queue corrections, `120` imported permits, `252` imported inspections, `263` eval tasks, `126` reviewed labels, `380` source-lineage rows, and next raw append rows at `permits.csv` row `123` and `inspections.csv` row `255`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0322` now adds a repair rough-in partial for south porch attic pantry sill-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0121` as accepted, and the refreshed Dallas pipeline reports `ready` with `121/121` queue corrections, `121` imported permits, `254` imported inspections, `265` eval tasks, `127` reviewed labels, `383` source-lineage rows, and next raw append rows at `permits.csv` row `124` and `inspections.csv` row `257`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0323` now adds a repair rough-in partial for east porch attic pantry rail-splice lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0122` as accepted, and the refreshed Dallas pipeline reports `ready` with `122/122` queue corrections, `122` imported permits, `256` imported inspections, `267` eval tasks, `128` reviewed labels, `386` source-lineage rows, and next raw append rows at `permits.csv` row `125` and `inspections.csv` row `259`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0324` now adds a repair rough-in partial for west porch attic pantry bracket-rail lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0123` as accepted, and the refreshed Dallas pipeline reports `ready` with `123/123` queue corrections, `123` imported permits, `258` imported inspections, `269` eval tasks, `129` reviewed labels, `389` source-lineage rows, and next raw append rows at `permits.csv` row `126` and `inspections.csv` row `261`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0325` now adds a repair rough-in partial for garden porch attic pantry transom-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0124` as accepted, and the refreshed Dallas pipeline reports `ready` with `124/124` queue corrections, `124` imported permits, `260` imported inspections, `271` eval tasks, `130` reviewed labels, `392` source-lineage rows, and next raw append rows at `permits.csv` row `127` and `inspections.csv` row `263`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0326` now adds a repair rough-in partial for north garden porch attic pantry threshold-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0125` as accepted, and the refreshed Dallas pipeline reports `ready` with `125/125` queue corrections, `125` imported permits, `262` imported inspections, `273` eval tasks, `131` reviewed labels, `395` source-lineage rows, and next raw append rows at `permits.csv` row `128` and `inspections.csv` row `265`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0327` now adds a repair rough-in partial for south garden porch attic pantry latch-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0126` as accepted, and the refreshed Dallas pipeline reports `ready` with `126/126` queue corrections, `126` imported permits, `264` imported inspections, `275` eval tasks, `132` reviewed labels, `398` source-lineage rows, and next raw append rows at `permits.csv` row `129` and `inspections.csv` row `267`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0328` now adds a repair rough-in partial for east garden porch attic pantry hinge-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0127` as accepted, and the refreshed Dallas pipeline reports `ready` with `127/127` queue corrections, `127` imported permits, `266` imported inspections, `277` eval tasks, `133` reviewed labels, `401` source-lineage rows, and next raw append rows at `permits.csv` row `130` and `inspections.csv` row `269`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0329` now adds a repair rough-in partial for west garden porch attic pantry sill-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0128` as accepted, and the refreshed Dallas pipeline reports `ready` with `128/128` queue corrections, `128` imported permits, `268` imported inspections, `279` eval tasks, `134` reviewed labels, `404` source-lineage rows, and next raw append rows at `permits.csv` row `131` and `inspections.csv` row `271`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0330` now adds a repair rough-in partial for northwest garden porch attic pantry jamb-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0129` as accepted, and the refreshed Dallas pipeline reports `ready` with `129/129` queue corrections, `129` imported permits, `270` imported inspections, `281` eval tasks, `135` reviewed labels, `407` source-lineage rows, and next raw append rows at `permits.csv` row `132` and `inspections.csv` row `273`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0331` now adds a repair rough-in partial for northeast garden porch attic pantry stile-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0130` as accepted, and the refreshed Dallas pipeline reports `ready` with `130/130` queue corrections, `130` imported permits, `272` imported inspections, `283` eval tasks, `136` reviewed labels, `410` source-lineage rows, and next raw append rows at `permits.csv` row `133` and `inspections.csv` row `275`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0332` now adds a repair rough-in partial for southeast garden porch attic pantry mullion-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0131` as accepted, and the refreshed Dallas pipeline reports `ready` with `131/131` queue corrections, `131` imported permits, `274` imported inspections, `285` eval tasks, `137` reviewed labels, `413` source-lineage rows, and next raw append rows at `permits.csv` row `134` and `inspections.csv` row `277`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0333` now adds a repair rough-in partial for upper garden porch attic pantry sash-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0132` as accepted, and the refreshed Dallas pipeline reports `ready` with `132/132` queue corrections, `132` imported permits, `276` imported inspections, `287` eval tasks, `138` reviewed labels, `416` source-lineage rows, and next raw append rows at `permits.csv` row `135` and `inspections.csv` row `279`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0334` now adds a repair rough-in partial for upper west garden porch attic pantry casing-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0133` as accepted, and the refreshed Dallas pipeline reports `ready` with `133/133` queue corrections, `133` imported permits, `278` imported inspections, `289` eval tasks, `139` reviewed labels, `419` source-lineage rows, and next raw append rows at `permits.csv` row `136` and `inspections.csv` row `281`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0335` now adds a repair rough-in partial for upper east garden porch attic pantry apron-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0134` as accepted, and the refreshed Dallas pipeline reports `ready` with `134/134` queue corrections, `134` imported permits, `280` imported inspections, `291` eval tasks, `140` reviewed labels, `422` source-lineage rows, and next raw append rows at `permits.csv` row `137` and `inspections.csv` row `283`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0336` now adds a repair rough-in partial for upper south garden porch attic pantry lintel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0135` as accepted, and the refreshed Dallas pipeline reports `ready` with `135/135` queue corrections, `135` imported permits, `282` imported inspections, `293` eval tasks, `141` reviewed labels, `425` source-lineage rows, and next raw append rows at `permits.csv` row `138` and `inspections.csv` row `285`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0337` now adds a repair rough-in partial for upper north garden porch attic pantry frieze-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0136` as accepted, and the refreshed Dallas pipeline reports `ready` with `136/136` queue corrections, `136` imported permits, `284` imported inspections, `295` eval tasks, `142` reviewed labels, `428` source-lineage rows, and next raw append rows at `permits.csv` row `139` and `inspections.csv` row `287`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0338` now adds a repair rough-in partial for upper central garden porch attic pantry plinth-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0137` as accepted, and the refreshed Dallas pipeline reports `ready` with `137/137` queue corrections, `137` imported permits, `286` imported inspections, `297` eval tasks, `143` reviewed labels, `431` source-lineage rows, and next raw append rows at `permits.csv` row `140` and `inspections.csv` row `289`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0339` now adds a repair rough-in partial for upper rear garden porch attic pantry cornice-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0138` as accepted, and the refreshed Dallas pipeline reports `ready` with `138/138` queue corrections, `138` imported permits, `288` imported inspections, `299` eval tasks, `144` reviewed labels, `434` source-lineage rows, and next raw append rows at `permits.csv` row `141` and `inspections.csv` row `291`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0340` now adds a repair rough-in partial for upper front garden porch attic pantry keystone-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0139` as accepted, and the refreshed Dallas pipeline reports `ready` with `139/139` queue corrections, `139` imported permits, `290` imported inspections, `301` eval tasks, `145` reviewed labels, `437` source-lineage rows, and next raw append rows at `permits.csv` row `142` and `inspections.csv` row `293`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0341` now adds a repair rough-in partial for upper side garden porch attic pantry pediment-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0140` as accepted, and the refreshed Dallas pipeline reports `ready` with `140/140` queue corrections, `140` imported permits, `292` imported inspections, `303` eval tasks, `146` reviewed labels, `440` source-lineage rows, and next raw append rows at `permits.csv` row `143` and `inspections.csv` row `295`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0342` now adds a repair rough-in partial for upper landing garden porch attic pantry transom-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0141` as accepted, and the refreshed Dallas pipeline reports `ready` with `141/141` queue corrections, `141` imported permits, `294` imported inspections, `305` eval tasks, `147` reviewed labels, `443` source-lineage rows, and next raw append rows at `permits.csv` row `144` and `inspections.csv` row `297`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0343` now adds a repair rough-in partial for upper stair garden porch attic pantry mullion-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0142` as accepted, and the refreshed Dallas pipeline reports `ready` with `142/142` queue corrections, `142` imported permits, `296` imported inspections, `307` eval tasks, `148` reviewed labels, `446` source-lineage rows, and next raw append rows at `permits.csv` row `145` and `inspections.csv` row `299`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0344` now adds a repair rough-in partial for upper hall garden porch attic pantry stile-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0143` as accepted, and the refreshed Dallas pipeline reports `ready` with `143/143` queue corrections, `143` imported permits, `298` imported inspections, `309` eval tasks, `149` reviewed labels, `449` source-lineage rows, and next raw append rows at `permits.csv` row `146` and `inspections.csv` row `301`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0345` now adds a repair rough-in partial for upper den garden porch attic pantry lintel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0144` as accepted, and the refreshed Dallas pipeline reports `ready` with `144/144` queue corrections, `144` imported permits, `300` imported inspections, `311` eval tasks, `150` reviewed labels, `452` source-lineage rows, and next raw append rows at `permits.csv` row `147` and `inspections.csv` row `303`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0346` now adds a repair rough-in partial for upper parlor garden porch attic pantry soffit-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0145` as accepted, and the refreshed Dallas pipeline reports `ready` with `145/145` queue corrections, `145` imported permits, `302` imported inspections, `313` eval tasks, `151` reviewed labels, `455` source-lineage rows, and next raw append rows at `permits.csv` row `148` and `inspections.csv` row `305`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0347` now adds a repair rough-in partial for upper vestibule garden porch attic pantry fascia-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0146` as accepted, and the refreshed Dallas pipeline reports `ready` with `146/146` queue corrections, `146` imported permits, `304` imported inspections, `315` eval tasks, `152` reviewed labels, `458` source-lineage rows, and next raw append rows at `permits.csv` row `149` and `inspections.csv` row `307`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0348` now adds a repair rough-in partial for upper sitting garden porch attic pantry jamb-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0147` as accepted, and the refreshed Dallas pipeline reports `ready` with `147/147` queue corrections, `147` imported permits, `306` imported inspections, `317` eval tasks, `153` reviewed labels, `461` source-lineage rows, and next raw append rows at `permits.csv` row `150` and `inspections.csv` row `309`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0349` now adds a repair rough-in partial for upper library garden porch attic pantry stop-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0148` as accepted, and the refreshed Dallas pipeline reports `ready` with `148/148` queue corrections, `148` imported permits, `308` imported inspections, `319` eval tasks, `154` reviewed labels, `464` source-lineage rows, and next raw append rows at `permits.csv` row `151` and `inspections.csv` row `311`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0350` now adds a repair rough-in partial for upper study garden porch attic pantry casing-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0149` as accepted, and the refreshed Dallas pipeline reports `ready` with `149/149` queue corrections, `149` imported permits, `310` imported inspections, `321` eval tasks, `155` reviewed labels, `467` source-lineage rows, and next raw append rows at `permits.csv` row `152` and `inspections.csv` row `313`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0351` now adds a repair rough-in partial for upper alcove garden porch attic pantry apron-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0150` as accepted, and the refreshed Dallas pipeline reports `ready` with `150/150` queue corrections, `150` imported permits, `312` imported inspections, `323` eval tasks, `156` reviewed labels, `470` source-lineage rows, and next raw append rows at `permits.csv` row `153` and `inspections.csv` row `315`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0352` now adds a repair rough-in partial for upper nook garden porch attic pantry threshold-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0151` as accepted, and the refreshed Dallas pipeline reports `ready` with `151/151` queue corrections, `151` imported permits, `314` imported inspections, `325` eval tasks, `157` reviewed labels, `473` source-lineage rows, and next raw append rows at `permits.csv` row `154` and `inspections.csv` row `317`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0353` now adds a repair rough-in partial for upper foyer garden porch attic pantry header-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0152` as accepted, and the refreshed Dallas pipeline reports `ready` with `152/152` queue corrections, `152` imported permits, `316` imported inspections, `327` eval tasks, `158` reviewed labels, `476` source-lineage rows, and next raw append rows at `permits.csv` row `155` and `inspections.csv` row `319`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0354` now adds a repair rough-in partial for upper bay garden porch attic pantry reveal-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0153` as accepted, and the refreshed Dallas pipeline reports `ready` with `153/153` queue corrections, `153` imported permits, `318` imported inspections, `329` eval tasks, `159` reviewed labels, `479` source-lineage rows, and next raw append rows at `permits.csv` row `156` and `inspections.csv` row `321`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0355` now adds a repair rough-in partial for upper loft garden porch attic pantry capstone-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0154` as accepted, and the refreshed Dallas pipeline reports `ready` with `154/154` queue corrections, `154` imported permits, `320` imported inspections, `331` eval tasks, `160` reviewed labels, `482` source-lineage rows, and next raw append rows at `permits.csv` row `157` and `inspections.csv` row `323`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0356` now adds a repair rough-in partial for upper gallery garden porch attic pantry crown-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0155` as accepted, and the refreshed Dallas pipeline reports `ready` with `155/155` queue corrections, `155` imported permits, `322` imported inspections, `333` eval tasks, `161` reviewed labels, `485` source-lineage rows, and next raw append rows at `permits.csv` row `158` and `inspections.csv` row `325`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0357` now adds a repair rough-in partial for upper conservatory garden porch attic pantry gable-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0156` as accepted, and the refreshed Dallas pipeline reports `ready` with `156/156` queue corrections, `156` imported permits, `324` imported inspections, `335` eval tasks, `162` reviewed labels, `488` source-lineage rows, and next raw append rows at `permits.csv` row `159` and `inspections.csv` row `327`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0358` now adds a repair rough-in partial for upper solarium garden porch attic pantry clerestory-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0157` as accepted, and the refreshed Dallas pipeline reports `ready` with `157/157` queue corrections, `157` imported permits, `326` imported inspections, `337` eval tasks, `163` reviewed labels, `491` source-lineage rows, and next raw append rows at `permits.csv` row `160` and `inspections.csv` row `329`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0359` now adds a repair rough-in partial for upper arcade garden porch attic pantry lintel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0158` as accepted, and the refreshed Dallas pipeline reports `ready` with `158/158` queue corrections, `158` imported permits, `328` imported inspections, `339` eval tasks, `164` reviewed labels, `494` source-lineage rows, and next raw append rows at `permits.csv` row `161` and `inspections.csv` row `331`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0360` now adds a repair rough-in partial for upper passage garden porch attic pantry architrave-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0159` as accepted, and the refreshed Dallas pipeline reports `ready` with `159/159` queue corrections, `159` imported permits, `330` imported inspections, `341` eval tasks, `165` reviewed labels, `497` source-lineage rows, and next raw append rows at `permits.csv` row `162` and `inspections.csv` row `333`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0361` now adds a repair rough-in partial for upper loggia garden porch attic pantry spandrel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0160` as accepted, and the refreshed Dallas pipeline reports `ready` with `160/160` queue corrections, `160` imported permits, `332` imported inspections, `343` eval tasks, `166` reviewed labels, `500` source-lineage rows, and next raw append rows at `permits.csv` row `163` and `inspections.csv` row `335`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0362` now adds a repair rough-in partial for upper dormer garden porch attic pantry parapet-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0161` as accepted, and the refreshed Dallas pipeline reports `ready` with `161/161` queue corrections, `161` imported permits, `334` imported inspections, `345` eval tasks, `167` reviewed labels, `503` source-lineage rows, and next raw append rows at `permits.csv` row `164` and `inspections.csv` row `337`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0363` now adds a repair rough-in partial for upper terrace garden porch attic pantry cornice-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0162` as accepted, and the refreshed Dallas pipeline reports `ready` with `162/162` queue corrections, `162` imported permits, `336` imported inspections, `347` eval tasks, `168` reviewed labels, `506` source-lineage rows, and next raw append rows at `permits.csv` row `165` and `inspections.csv` row `339`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0364` now adds a repair rough-in partial for upper portico garden porch attic pantry frieze-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0163` as accepted, and the refreshed Dallas pipeline reports `ready` with `163/163` queue corrections, `163` imported permits, `338` imported inspections, `349` eval tasks, `169` reviewed labels, `509` source-lineage rows, and next raw append rows at `permits.csv` row `166` and `inspections.csv` row `341`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0365` now adds a repair rough-in partial for upper gallery wing garden porch attic pantry dentil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0164` as accepted, and the refreshed Dallas pipeline reports `ready` with `164/164` queue corrections, `164` imported permits, `340` imported inspections, `351` eval tasks, `170` reviewed labels, `512` source-lineage rows, and next raw append rows at `permits.csv` row `167` and `inspections.csv` row `343`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0366` now adds a repair rough-in partial for upper arcade wing garden porch attic pantry modillion-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0165` as accepted, and the refreshed Dallas pipeline reports `ready` with `165/165` queue corrections, `165` imported permits, `342` imported inspections, `353` eval tasks, `171` reviewed labels, `515` source-lineage rows, and next raw append rows at `permits.csv` row `168` and `inspections.csv` row `345`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0367` now adds a repair rough-in partial for upper veranda wing garden porch attic pantry soffit-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0166` as accepted, and the refreshed Dallas pipeline reports `ready` with `166/166` queue corrections, `166` imported permits, `344` imported inspections, `355` eval tasks, `172` reviewed labels, `518` source-lineage rows, and next raw append rows at `permits.csv` row `169` and `inspections.csv` row `347`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0368` now adds a repair rough-in partial for upper balcony wing garden porch attic pantry fascia-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0167` as accepted, and the refreshed Dallas pipeline reports `ready` with `167/167` queue corrections, `167` imported permits, `346` imported inspections, `357` eval tasks, `173` reviewed labels, `521` source-lineage rows, and next raw append rows at `permits.csv` row `170` and `inspections.csv` row `349`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0369` now adds a repair rough-in partial for upper breezeway wing garden porch attic pantry gable-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0168` as accepted, and the refreshed Dallas pipeline reports `ready` with `168/168` queue corrections, `168` imported permits, `348` imported inspections, `359` eval tasks, `174` reviewed labels, `524` source-lineage rows, and next raw append rows at `permits.csv` row `171` and `inspections.csv` row `351`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0370` now adds a repair rough-in partial for upper lanai wing garden porch attic pantry eave-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0169` as accepted, and the refreshed Dallas pipeline reports `ready` with `169/169` queue corrections, `169` imported permits, `350` imported inspections, `361` eval tasks, `175` reviewed labels, `527` source-lineage rows, and next raw append rows at `permits.csv` row `172` and `inspections.csv` row `353`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0371` now adds a repair rough-in partial for upper sunroom wing garden porch attic pantry parapet-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0170` as accepted, and the refreshed Dallas pipeline reports `ready` with `170/170` queue corrections, `170` imported permits, `352` imported inspections, `363` eval tasks, `176` reviewed labels, `530` source-lineage rows, and next raw append rows at `permits.csv` row `173` and `inspections.csv` row `355`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0372` now adds a repair rough-in partial for upper lounge wing garden porch attic pantry corbel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0171` as accepted, and the refreshed Dallas pipeline reports `ready` with `171/171` queue corrections, `171` imported permits, `354` imported inspections, `365` eval tasks, `177` reviewed labels, `533` source-lineage rows, and next raw append rows at `permits.csv` row `174` and `inspections.csv` row `357`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0373` now adds a repair rough-in partial for upper atrium wing garden porch attic pantry pilaster-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0172` as accepted, and the refreshed Dallas pipeline reports `ready` with `172/172` queue corrections, `172` imported permits, `356` imported inspections, `367` eval tasks, `178` reviewed labels, `536` source-lineage rows, and next raw append rows at `permits.csv` row `175` and `inspections.csv` row `359`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0374` now adds a repair rough-in partial for upper solarium wing garden porch attic pantry keystone-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0173` as accepted, and the refreshed Dallas pipeline reports `ready` with `173/173` queue corrections, `173` imported permits, `358` imported inspections, `369` eval tasks, `179` reviewed labels, `539` source-lineage rows, and next raw append rows at `permits.csv` row `176` and `inspections.csv` row `361`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0375` now adds a repair rough-in partial for upper conservatory wing garden porch attic pantry voussoir-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0174` as accepted, and the refreshed Dallas pipeline reports `ready` with `174/174` queue corrections, `174` imported permits, `360` imported inspections, `371` eval tasks, `180` reviewed labels, `542` source-lineage rows, and next raw append rows at `permits.csv` row `177` and `inspections.csv` row `363`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0376` now adds a repair rough-in partial for upper oriel wing garden porch attic pantry tracery-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0175` as accepted, and the refreshed Dallas pipeline reports `ready` with `175/175` queue corrections, `175` imported permits, `362` imported inspections, `373` eval tasks, `181` reviewed labels, `545` source-lineage rows, and next raw append rows at `permits.csv` row `178` and `inspections.csv` row `365`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0377` now adds a repair rough-in partial for upper cupola wing garden porch attic pantry finial-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0176` as accepted, and the refreshed Dallas pipeline reports `ready` with `176/176` queue corrections, `176` imported permits, `364` imported inspections, `375` eval tasks, `182` reviewed labels, `548` source-lineage rows, and next raw append rows at `permits.csv` row `179` and `inspections.csv` row `367`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0378` now adds a repair rough-in partial for upper clerestory wing garden porch attic pantry cresting-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0177` as accepted, and the refreshed Dallas pipeline reports `ready` with `177/177` queue corrections, `177` imported permits, `366` imported inspections, `377` eval tasks, `183` reviewed labels, `551` source-lineage rows, and next raw append rows at `permits.csv` row `180` and `inspections.csv` row `369`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0379` now adds a repair rough-in partial for upper lantern wing garden porch attic pantry oculus-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0178` as accepted, and the refreshed Dallas pipeline reports `ready` with `178/178` queue corrections, `178` imported permits, `368` imported inspections, `379` eval tasks, `184` reviewed labels, `554` source-lineage rows, and next raw append rows at `permits.csv` row `181` and `inspections.csv` row `371`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0380` now adds a repair rough-in partial for upper belvedere wing garden porch attic pantry dormer-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0179` as accepted, and the refreshed Dallas pipeline reports `ready` with `179/179` queue corrections, `179` imported permits, `370` imported inspections, `381` eval tasks, `185` reviewed labels, `557` source-lineage rows, and next raw append rows at `permits.csv` row `182` and `inspections.csv` row `373`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0381` now adds a repair rough-in partial for upper observatory wing garden porch attic pantry mansard-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0180` as accepted, and the refreshed Dallas pipeline reports `ready` with `180/180` queue corrections, `180` imported permits, `372` imported inspections, `383` eval tasks, `186` reviewed labels, `560` source-lineage rows, and next raw append rows at `permits.csv` row `183` and `inspections.csv` row `375`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0382` now adds a repair rough-in partial for upper turret wing garden porch attic pantry gambrel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0181` as accepted, and the refreshed Dallas pipeline reports `ready` with `181/181` queue corrections, `181` imported permits, `374` imported inspections, `385` eval tasks, `187` reviewed labels, `563` source-lineage rows, and next raw append rows at `permits.csv` row `184` and `inspections.csv` row `377`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0383` now adds a repair rough-in partial for upper spire wing garden porch attic pantry bargeboard-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0182` as accepted, and the refreshed Dallas pipeline reports `ready` with `182/182` queue corrections, `182` imported permits, `376` imported inspections, `387` eval tasks, `188` reviewed labels, `566` source-lineage rows, and next raw append rows at `permits.csv` row `185` and `inspections.csv` row `379`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0384` now adds a repair rough-in partial for upper gablet wing garden porch attic pantry quoin-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0183` as accepted, and the refreshed Dallas pipeline reports `ready` with `183/183` queue corrections, `183` imported permits, `378` imported inspections, `389` eval tasks, `189` reviewed labels, `569` source-lineage rows, and next raw append rows at `permits.csv` row `186` and `inspections.csv` row `381`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0385` now adds a repair rough-in partial for upper oriel wing garden porch attic pantry fanlight-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0184` as accepted, and the refreshed Dallas pipeline reports `ready` with `184/184` queue corrections, `184` imported permits, `380` imported inspections, `391` eval tasks, `190` reviewed labels, `572` source-lineage rows, and next raw append rows at `permits.csv` row `187` and `inspections.csv` row `383`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0386` now adds a repair rough-in partial for upper vestibule wing garden porch attic pantry lunette-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0185` as accepted, and the refreshed Dallas pipeline reports `ready` with `185/185` queue corrections, `185` imported permits, `382` imported inspections, `393` eval tasks, `191` reviewed labels, `575` source-lineage rows, and next raw append rows at `permits.csv` row `188` and `inspections.csv` row `385`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0387` now adds a repair rough-in partial for upper transom wing garden porch attic pantry rosette-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0186` as accepted, and the refreshed Dallas pipeline reports `ready` with `186/186` queue corrections, `186` imported permits, `384` imported inspections, `395` eval tasks, `192` reviewed labels, `578` source-lineage rows, and next raw append rows at `permits.csv` row `189` and `inspections.csv` row `387`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0388` now adds a repair rough-in partial for upper gallery wing garden porch attic pantry medallion-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0187` as accepted, and the refreshed Dallas pipeline reports `ready` with `187/187` queue corrections, `187` imported permits, `386` imported inspections, `397` eval tasks, `193` reviewed labels, `581` source-lineage rows, and next raw append rows at `permits.csv` row `190` and `inspections.csv` row `389`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0389` now adds a repair rough-in partial for upper arcade wing garden porch attic pantry triforium-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0188` as accepted, and the refreshed Dallas pipeline reports `ready` with `188/188` queue corrections, `188` imported permits, `388` imported inspections, `399` eval tasks, `194` reviewed labels, `584` source-lineage rows, and next raw append rows at `permits.csv` row `191` and `inspections.csv` row `391`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0390` now adds a repair rough-in partial for upper cloister wing garden porch attic pantry archivolt-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0189` as accepted, and the refreshed Dallas pipeline reports `ready` with `189/189` queue corrections, `189` imported permits, `390` imported inspections, `401` eval tasks, `195` reviewed labels, `587` source-lineage rows, and next raw append rows at `permits.csv` row `192` and `inspections.csv` row `393`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0391` now adds a repair rough-in partial for upper apse wing garden porch attic pantry apse-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0190` as accepted, and the refreshed Dallas pipeline reports `ready` with `190/190` queue corrections, `190` imported permits, `392` imported inspections, `403` eval tasks, `196` reviewed labels, `590` source-lineage rows, and next raw append rows at `permits.csv` row `193` and `inspections.csv` row `395`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0392` now adds a repair rough-in partial for upper nave wing garden porch attic pantry nave-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0191` as accepted, and the refreshed Dallas pipeline reports `ready` with `191/191` queue corrections, `191` imported permits, `394` imported inspections, `405` eval tasks, `197` reviewed labels, `593` source-lineage rows, and next raw append rows at `permits.csv` row `194` and `inspections.csv` row `397`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0393` now adds a repair rough-in partial for upper chancel wing garden porch attic pantry chancel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0192` as accepted, and the refreshed Dallas pipeline reports `ready` with `192/192` queue corrections, `192` imported permits, `396` imported inspections, `407` eval tasks, `198` reviewed labels, `596` source-lineage rows, and next raw append rows at `permits.csv` row `195` and `inspections.csv` row `399`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0394` now adds a repair rough-in partial for upper transept wing garden porch attic pantry reredos-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0193` as accepted, and the refreshed Dallas pipeline reports `ready` with `193/193` queue corrections, `193` imported permits, `398` imported inspections, `409` eval tasks, `199` reviewed labels, `599` source-lineage rows, and next raw append rows at `permits.csv` row `196` and `inspections.csv` row `401`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0395` now adds a repair rough-in partial for upper narthex wing garden porch attic pantry narthex-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0194` as accepted, and the refreshed Dallas pipeline reports `ready` with `194/194` queue corrections, `194` imported permits, `400` imported inspections, `411` eval tasks, `200` reviewed labels, `602` source-lineage rows, and next raw append rows at `permits.csv` row `197` and `inspections.csv` row `403`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0396` now adds a repair rough-in partial for upper choir-loft wing garden porch attic pantry choir-loft-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0195` as accepted, and the refreshed Dallas pipeline reports `ready` with `195/195` queue corrections, `195` imported permits, `402` imported inspections, `413` eval tasks, `201` reviewed labels, `605` source-lineage rows, and next raw append rows at `permits.csv` row `198` and `inspections.csv` row `405`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0397` now adds a repair rough-in partial for upper sacristy wing garden porch attic pantry sacristy-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0196` as accepted, and the refreshed Dallas pipeline reports `ready` with `196/196` queue corrections, `196` imported permits, `404` imported inspections, `415` eval tasks, `202` reviewed labels, `608` source-lineage rows, and next raw append rows at `permits.csv` row `199` and `inspections.csv` row `407`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0398` now adds a repair rough-in partial for upper vestibule wing garden porch attic pantry vestibule-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0197` as accepted, and the refreshed Dallas pipeline reports `ready` with `197/197` queue corrections, `197` imported permits, `406` imported inspections, `417` eval tasks, `203` reviewed labels, `611` source-lineage rows, and next raw append rows at `permits.csv` row `200` and `inspections.csv` row `409`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0400` now adds a repair rough-in partial for upper chapel wing garden porch attic pantry chapel-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0199` as accepted, and the refreshed Dallas pipeline reports `ready` with `199/199` queue corrections, `199` imported permits, `410` imported inspections, `421` eval tasks, `205` reviewed labels, `617` source-lineage rows, and next raw append rows at `permits.csv` row `202` and `inspections.csv` row `413`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0399` now adds a repair rough-in partial for upper baptistry wing garden porch attic pantry baptistry-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0198` as accepted, and the refreshed Dallas pipeline reports `ready` with `198/198` queue corrections, `198` imported permits, `408` imported inspections, `419` eval tasks, `204` reviewed labels, `614` source-lineage rows, and next raw append rows at `permits.csv` row `201` and `inspections.csv` row `411`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0401` now adds a repair rough-in partial for upper vestry wing garden porch attic pantry vestry-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0200` as accepted, and the refreshed Dallas pipeline reports `ready` with `200/200` queue corrections, `200` imported permits, `412` imported inspections, `423` eval tasks, `206` reviewed labels, `620` source-lineage rows, and next raw append rows at `permits.csv` row `203` and `inspections.csv` row `415`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0402` now adds a repair rough-in partial for upper cloister wing garden porch attic pantry cloister-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0201` as accepted, and the refreshed Dallas pipeline reports `ready` with `201/201` queue corrections, `201` imported permits, `414` imported inspections, `425` eval tasks, `207` reviewed labels, `623` source-lineage rows, and next raw append rows at `permits.csv` row `204` and `inspections.csv` row `417`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0403` now adds a repair rough-in partial for upper ambulatory wing garden porch attic pantry ambulatory-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0202` as accepted, and the refreshed Dallas pipeline reports `ready` with `202/202` queue corrections, `202` imported permits, `416` imported inspections, `427` eval tasks, `208` reviewed labels, `626` source-lineage rows, and next raw append rows at `permits.csv` row `205` and `inspections.csv` row `419`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0404` now adds a repair rough-in partial for upper tympanum wing garden porch attic pantry tympanum-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0203` as accepted, and the refreshed Dallas pipeline reports `ready` with `203/203` queue corrections, `203` imported permits, `418` imported inspections, `429` eval tasks, `209` reviewed labels, `629` source-lineage rows, and next raw append rows at `permits.csv` row `206` and `inspections.csv` row `421`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0405` now adds a repair rough-in partial for upper quatrefoil wing garden porch attic pantry quatrefoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0204` as accepted, and the refreshed Dallas pipeline reports `ready` with `204/204` queue corrections, `204` imported permits, `420` imported inspections, `431` eval tasks, `210` reviewed labels, `632` source-lineage rows, and next raw append rows at `permits.csv` row `207` and `inspections.csv` row `423`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0406` now adds a repair rough-in partial for upper cinquefoil wing garden porch attic pantry cinquefoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0205` as accepted, and the refreshed Dallas pipeline reports `ready` with `205/205` queue corrections, `205` imported permits, `422` imported inspections, `433` eval tasks, `211` reviewed labels, `635` source-lineage rows, and next raw append rows at `permits.csv` row `208` and `inspections.csv` row `425`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0407` now adds a repair rough-in partial for upper sexfoil wing garden porch attic pantry sexfoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0206` as accepted, and the refreshed Dallas pipeline reports `ready` with `206/206` queue corrections, `206` imported permits, `424` imported inspections, `435` eval tasks, `212` reviewed labels, `638` source-lineage rows, and next raw append rows at `permits.csv` row `209` and `inspections.csv` row `427`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0408` now adds a repair rough-in partial for upper heptfoil wing garden porch attic pantry heptfoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0207` as accepted, and the refreshed Dallas pipeline reports `ready` with `207/207` queue corrections, `207` imported permits, `426` imported inspections, `437` eval tasks, `213` reviewed labels, `641` source-lineage rows, and next raw append rows at `permits.csv` row `210` and `inspections.csv` row `429`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0409` now adds a repair rough-in partial for upper octfoil wing garden porch attic pantry octfoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0208` as accepted, and the refreshed Dallas pipeline reports `ready` with `208/208` queue corrections, `208` imported permits, `428` imported inspections, `439` eval tasks, `214` reviewed labels, `644` source-lineage rows, and next raw append rows at `permits.csv` row `211` and `inspections.csv` row `431`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0410` now adds a repair rough-in partial for upper enneafoil wing garden porch attic pantry enneafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0209` as accepted, and the refreshed Dallas pipeline reports `ready` with `209/209` queue corrections, `209` imported permits, `430` imported inspections, `441` eval tasks, `215` reviewed labels, `647` source-lineage rows, and next raw append rows at `permits.csv` row `212` and `inspections.csv` row `433`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0411` now adds a repair rough-in partial for upper decafoil wing garden porch attic pantry decafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0210` as accepted, and the refreshed Dallas pipeline reports `ready` with `210/210` queue corrections, `210` imported permits, `432` imported inspections, `443` eval tasks, `216` reviewed labels, `650` source-lineage rows, and next raw append rows at `permits.csv` row `213` and `inspections.csv` row `435`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0412` now adds a repair rough-in partial for upper hendecafoil wing garden porch attic pantry hendecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0211` as accepted, and the refreshed Dallas pipeline reports `ready` with `211/211` queue corrections, `211` imported permits, `434` imported inspections, `445` eval tasks, `217` reviewed labels, `653` source-lineage rows, and next raw append rows at `permits.csv` row `214` and `inspections.csv` row `437`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0413` now adds a repair rough-in partial for upper dodecafoil wing garden porch attic pantry dodecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0212` as accepted, and the refreshed Dallas pipeline reports `ready` with `212/212` queue corrections, `212` imported permits, `436` imported inspections, `447` eval tasks, `218` reviewed labels, `656` source-lineage rows, and next raw append rows at `permits.csv` row `215` and `inspections.csv` row `439`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0414` now adds a repair rough-in partial for upper tridecafoil wing garden porch attic pantry tridecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0213` as accepted, and the refreshed Dallas pipeline reports `ready` with `213/213` queue corrections, `213` imported permits, `438` imported inspections, `449` eval tasks, `219` reviewed labels, `659` source-lineage rows, and next raw append rows at `permits.csv` row `216` and `inspections.csv` row `441`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0415` now adds a repair rough-in partial for upper tetradecafoil wing garden porch attic pantry tetradecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0214` as accepted, and the refreshed Dallas pipeline reports `ready` with `214/214` queue corrections, `214` imported permits, `440` imported inspections, `451` eval tasks, `220` reviewed labels, `662` source-lineage rows, and next raw append rows at `permits.csv` row `217` and `inspections.csv` row `443`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0416` now adds a repair rough-in partial for upper pentadecafoil wing garden porch attic pantry pentadecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0215` as accepted, and the refreshed Dallas pipeline reports `ready` with `215/215` queue corrections, `215` imported permits, `442` imported inspections, `453` eval tasks, `221` reviewed labels, `665` source-lineage rows, and next raw append rows at `permits.csv` row `218` and `inspections.csv` row `445`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0417` now adds a repair rough-in partial for upper hexadecafoil wing garden porch attic pantry hexadecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0216` as accepted, and the refreshed Dallas pipeline reports `ready` with `216/216` queue corrections, `216` imported permits, `444` imported inspections, `455` eval tasks, `222` reviewed labels, `668` source-lineage rows, and next raw append rows at `permits.csv` row `219` and `inspections.csv` row `447`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0418` now adds a repair rough-in partial for upper heptadecafoil wing garden porch attic pantry heptadecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0217` as accepted, and the refreshed Dallas pipeline reports `ready` with `217/217` queue corrections, `217` imported permits, `446` imported inspections, `457` eval tasks, `223` reviewed labels, `671` source-lineage rows, and next raw append rows at `permits.csv` row `220` and `inspections.csv` row `449`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0419` now adds a repair rough-in partial for upper octadecafoil wing garden porch attic pantry octadecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0218` as accepted, and the refreshed Dallas pipeline reports `ready` with `218/218` queue corrections, `218` imported permits, `448` imported inspections, `459` eval tasks, `224` reviewed labels, `674` source-lineage rows, and next raw append rows at `permits.csv` row `221` and `inspections.csv` row `451`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0420` now adds a repair rough-in partial for upper enneadecafoil wing garden porch attic pantry enneadecafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0219` as accepted, and the refreshed Dallas pipeline reports `ready` with `219/219` queue corrections, `219` imported permits, `450` imported inspections, `461` eval tasks, `225` reviewed labels, `677` source-lineage rows, and next raw append rows at `permits.csv` row `222` and `inspections.csv` row `453`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0421` now adds a repair rough-in partial for upper icosafoil wing garden porch attic pantry icosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0220` as accepted, and the refreshed Dallas pipeline reports `ready` with `220/220` queue corrections, `220` imported permits, `452` imported inspections, `463` eval tasks, `226` reviewed labels, `680` source-lineage rows, and next raw append rows at `permits.csv` row `223` and `inspections.csv` row `455`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0422` now adds a repair rough-in partial for upper henicosafoil wing garden porch attic pantry henicosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0221` as accepted, and the refreshed Dallas pipeline reports `ready` with `221/221` queue corrections, `221` imported permits, `454` imported inspections, `465` eval tasks, `227` reviewed labels, `683` source-lineage rows, and next raw append rows at `permits.csv` row `224` and `inspections.csv` row `457`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0423` now adds a repair rough-in partial for upper docosafoil wing garden porch attic pantry docosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0222` as accepted, and the refreshed Dallas pipeline reports `ready` with `222/222` queue corrections, `222` imported permits, `456` imported inspections, `467` eval tasks, `228` reviewed labels, `686` source-lineage rows, and next raw append rows at `permits.csv` row `225` and `inspections.csv` row `459`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0424` now adds a repair rough-in partial for upper tricosafoil wing garden porch attic pantry tricosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0223` as accepted, and the refreshed Dallas pipeline reports `ready` with `223/223` queue corrections, `223` imported permits, `458` imported inspections, `469` eval tasks, `229` reviewed labels, `689` source-lineage rows, and next raw append rows at `permits.csv` row `226` and `inspections.csv` row `461`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0425` now adds a repair rough-in partial for upper tetracosafoil wing garden porch attic pantry tetracosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0224` as accepted, and the refreshed Dallas pipeline reports `ready` with `224/224` queue corrections, `224` imported permits, `460` imported inspections, `471` eval tasks, `230` reviewed labels, `692` source-lineage rows, and next raw append rows at `permits.csv` row `227` and `inspections.csv` row `463`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0426` now adds a repair rough-in partial for upper pentacosafoil wing garden porch attic pantry pentacosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0225` as accepted, and the refreshed Dallas pipeline reports `ready` with `225/225` queue corrections, `225` imported permits, `462` imported inspections, `473` eval tasks, `231` reviewed labels, `695` source-lineage rows, and next raw append rows at `permits.csv` row `228` and `inspections.csv` row `465`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0427` now adds a repair rough-in partial for upper hexacosafoil wing garden porch attic pantry hexacosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0226` as accepted, and the refreshed Dallas pipeline reports `ready` with `226/226` queue corrections, `226` imported permits, `464` imported inspections, `475` eval tasks, `232` reviewed labels, `698` source-lineage rows, and next raw append rows at `permits.csv` row `229` and `inspections.csv` row `467`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0428` now adds a repair rough-in partial for upper heptacosafoil wing garden porch attic pantry heptacosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0227` as accepted, and the refreshed Dallas pipeline reports `ready` with `227/227` queue corrections, `227` imported permits, `466` imported inspections, `477` eval tasks, `233` reviewed labels, `701` source-lineage rows, and next raw append rows at `permits.csv` row `230` and `inspections.csv` row `469`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0429` now adds a repair rough-in partial for upper octacosafoil wing garden porch attic pantry octacosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0228` as accepted, and the refreshed Dallas pipeline reports `ready` with `228/228` queue corrections, `228` imported permits, `468` imported inspections, `479` eval tasks, `234` reviewed labels, `704` source-lineage rows, and next raw append rows at `permits.csv` row `231` and `inspections.csv` row `471`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0430` now adds a repair rough-in partial for upper enneacosafoil wing garden porch attic pantry enneacosafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0229` as accepted, and the refreshed Dallas pipeline reports `ready` with `229/229` queue corrections, `229` imported permits, `470` imported inspections, `481` eval tasks, `235` reviewed labels, `707` source-lineage rows, and next raw append rows at `permits.csv` row `232` and `inspections.csv` row `473`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0431` now adds a repair rough-in partial for upper triacontafoil wing garden porch attic pantry triacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0230` as accepted, and the refreshed Dallas pipeline reports `ready` with `230/230` queue corrections, `230` imported permits, `472` imported inspections, `483` eval tasks, `236` reviewed labels, `710` source-lineage rows, and next raw append rows at `permits.csv` row `233` and `inspections.csv` row `475`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0432` now adds a repair rough-in partial for upper hentriacontafoil wing garden porch attic pantry hentriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0231` as accepted, and the refreshed Dallas pipeline reports `ready` with `231/231` queue corrections, `231` imported permits, `474` imported inspections, `485` eval tasks, `237` reviewed labels, `713` source-lineage rows, and next raw append rows at `permits.csv` row `234` and `inspections.csv` row `477`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0433` now adds a repair rough-in partial for upper dotriacontafoil wing garden porch attic pantry dotriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0232` as accepted, and the refreshed Dallas pipeline reports `ready` with `232/232` queue corrections, `232` imported permits, `476` imported inspections, `487` eval tasks, `238` reviewed labels, `716` source-lineage rows, and next raw append rows at `permits.csv` row `235` and `inspections.csv` row `479`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0434` now adds a repair rough-in partial for upper tritriacontafoil wing garden porch attic pantry tritriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0233` as accepted, and the refreshed Dallas pipeline reports `ready` with `233/233` queue corrections, `233` imported permits, `478` imported inspections, `489` eval tasks, `239` reviewed labels, `719` source-lineage rows, and next raw append rows at `permits.csv` row `236` and `inspections.csv` row `481`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0435` now adds a repair rough-in partial for upper tetratriacontafoil wing garden porch attic pantry tetratriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0234` as accepted, and the refreshed Dallas pipeline reports `ready` with `234/234` queue corrections, `234` imported permits, `480` imported inspections, `491` eval tasks, `240` reviewed labels, `722` source-lineage rows, and next raw append rows at `permits.csv` row `237` and `inspections.csv` row `483`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0436` now adds a repair rough-in partial for upper pentatriacontafoil wing garden porch attic pantry pentatriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0235` as accepted, and the refreshed Dallas pipeline reports `ready` with `235/235` queue corrections, `235` imported permits, `482` imported inspections, `493` eval tasks, `241` reviewed labels, `725` source-lineage rows, and next raw append rows at `permits.csv` row `238` and `inspections.csv` row `485`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0437` now adds a repair rough-in partial for upper hexatriacontafoil wing garden porch attic pantry hexatriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0236` as accepted, and the refreshed Dallas pipeline reports `ready` with `236/236` queue corrections, `236` imported permits, `484` imported inspections, `495` eval tasks, `242` reviewed labels, `728` source-lineage rows, and next raw append rows at `permits.csv` row `239` and `inspections.csv` row `487`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0438` now adds a repair rough-in partial for upper heptatriacontafoil wing garden porch attic pantry heptatriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0237` as accepted, and the refreshed Dallas pipeline reports `ready` with `237/237` queue corrections, `237` imported permits, `486` imported inspections, `497` eval tasks, `243` reviewed labels, `731` source-lineage rows, and next raw append rows at `permits.csv` row `240` and `inspections.csv` row `489`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0439` now adds a repair rough-in partial for upper octatriacontafoil wing garden porch attic pantry octatriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0238` as accepted, and the refreshed Dallas pipeline reports `ready` with `238/238` queue corrections, `238` imported permits, `488` imported inspections, `499` eval tasks, `244` reviewed labels, `734` source-lineage rows, and next raw append rows at `permits.csv` row `241` and `inspections.csv` row `491`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0440` now adds a repair rough-in partial for upper enneatriacontafoil wing garden porch attic pantry enneatriacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0239` as accepted, and the refreshed Dallas pipeline reports `ready` with `239/239` queue corrections, `239` imported permits, `490` imported inspections, `501` eval tasks, `245` reviewed labels, `737` source-lineage rows, and next raw append rows at `permits.csv` row `242` and `inspections.csv` row `493`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0441` now adds a repair rough-in partial for upper tetracontafoil wing garden porch attic pantry tetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0240` as accepted, and the refreshed Dallas pipeline reports `ready` with `240/240` queue corrections, `240` imported permits, `492` imported inspections, `503` eval tasks, `246` reviewed labels, `740` source-lineage rows, and next raw append rows at `permits.csv` row `243` and `inspections.csv` row `495`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0442` now adds a repair rough-in partial for upper henatetracontafoil wing garden porch attic pantry henatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0241` as accepted, and the refreshed Dallas pipeline reports `ready` with `241/241` queue corrections, `241` imported permits, `494` imported inspections, `505` eval tasks, `247` reviewed labels, `743` source-lineage rows, and next raw append rows at `permits.csv` row `244` and `inspections.csv` row `497`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0443` now adds a repair rough-in partial for upper dotetracontafoil wing garden porch attic pantry dotetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0242` as accepted, and the refreshed Dallas pipeline reports `ready` with `242/242` queue corrections, `242` imported permits, `496` imported inspections, `507` eval tasks, `248` reviewed labels, `746` source-lineage rows, and next raw append rows at `permits.csv` row `245` and `inspections.csv` row `499`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0444` now adds a repair rough-in partial for upper tritetracontafoil wing garden porch attic pantry tritetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0243` as accepted, and the refreshed Dallas pipeline reports `ready` with `243/243` queue corrections, `243` imported permits, `498` imported inspections, `509` eval tasks, `249` reviewed labels, `749` source-lineage rows, and next raw append rows at `permits.csv` row `246` and `inspections.csv` row `501`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0445` now adds a repair rough-in partial for upper tetratetracontafoil wing garden porch attic pantry tetratetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0244` as accepted, and the refreshed Dallas pipeline reports `ready` with `244/244` queue corrections, `244` imported permits, `500` imported inspections, `511` eval tasks, `250` reviewed labels, `752` source-lineage rows, and next raw append rows at `permits.csv` row `247` and `inspections.csv` row `503`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0446` now adds a repair rough-in partial for upper pentatetracontafoil wing garden porch attic pantry pentatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0245` as accepted, and the refreshed Dallas pipeline reports `ready` with `245/245` queue corrections, `245` imported permits, `502` imported inspections, `513` eval tasks, `251` reviewed labels, `755` source-lineage rows, and next raw append rows at `permits.csv` row `248` and `inspections.csv` row `505`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0447` now adds a repair rough-in partial for upper hexatetracontafoil wing garden porch attic pantry hexatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0246` as accepted, and the refreshed Dallas pipeline reports `ready` with `246/246` queue corrections, `246` imported permits, `504` imported inspections, `515` eval tasks, `252` reviewed labels, `758` source-lineage rows, and next raw append rows at `permits.csv` row `249` and `inspections.csv` row `507`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0448` now adds a repair rough-in partial for upper heptatetracontafoil wing garden porch attic pantry heptatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0247` as accepted, and the refreshed Dallas pipeline reports `ready` with `247/247` queue corrections, `247` imported permits, `506` imported inspections, `517` eval tasks, `253` reviewed labels, `761` source-lineage rows, and next raw append rows at `permits.csv` row `250` and `inspections.csv` row `509`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0449` now adds a repair rough-in partial for upper octatetracontafoil wing garden porch attic pantry octatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0248` as accepted, and the refreshed Dallas pipeline reports `ready` with `248/248` queue corrections, `248` imported permits, `508` imported inspections, `519` eval tasks, `254` reviewed labels, `764` source-lineage rows, and next raw append rows at `permits.csv` row `251` and `inspections.csv` row `511`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0450` now adds a repair rough-in partial for upper enneatetracontafoil wing garden porch attic pantry enneatetracontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0249` as accepted, and the refreshed Dallas pipeline reports `ready` with `249/249` queue corrections, `249` imported permits, `510` imported inspections, `521` eval tasks, `255` reviewed labels, `767` source-lineage rows, and next raw append rows at `permits.csv` row `252` and `inspections.csv` row `513`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0451` now adds a repair rough-in partial for upper pentacontafoil wing garden porch attic pantry pentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0250` as accepted, and the refreshed Dallas pipeline reports `ready` with `250/250` queue corrections, `250` imported permits, `512` imported inspections, `523` eval tasks, `256` reviewed labels, `770` source-lineage rows, and next raw append rows at `permits.csv` row `253` and `inspections.csv` row `515`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0452` now adds a repair rough-in partial for upper henapentacontafoil wing garden porch attic pantry henapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0251` as accepted, and the refreshed Dallas pipeline reports `ready` with `251/251` queue corrections, `251` imported permits, `514` imported inspections, `525` eval tasks, `257` reviewed labels, `773` source-lineage rows, and next raw append rows at `permits.csv` row `254` and `inspections.csv` row `517`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0453` now adds a repair rough-in partial for upper dopentacontafoil wing garden porch attic pantry dopentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0252` as accepted, and the refreshed Dallas pipeline reports `ready` with `252/252` queue corrections, `252` imported permits, `516` imported inspections, `527` eval tasks, `258` reviewed labels, `776` source-lineage rows, and next raw append rows at `permits.csv` row `255` and `inspections.csv` row `519`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0454` now adds a repair rough-in partial for upper tripentacontafoil wing garden porch attic pantry tripentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0253` as accepted, and the refreshed Dallas pipeline reports `ready` with `253/253` queue corrections, `253` imported permits, `518` imported inspections, `529` eval tasks, `259` reviewed labels, `779` source-lineage rows, and next raw append rows at `permits.csv` row `256` and `inspections.csv` row `521`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0455` now adds a repair rough-in partial for upper tetrapentacontafoil wing garden porch attic pantry tetrapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0254` as accepted, and the refreshed Dallas pipeline reports `ready` with `254/254` queue corrections, `254` imported permits, `520` imported inspections, `531` eval tasks, `260` reviewed labels, `782` source-lineage rows, and next raw append rows at `permits.csv` row `257` and `inspections.csv` row `523`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0456` now adds a repair rough-in partial for upper pentapentacontafoil wing garden porch attic pantry pentapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0255` as accepted, and the refreshed Dallas pipeline reports `ready` with `255/255` queue corrections, `255` imported permits, `522` imported inspections, `533` eval tasks, `261` reviewed labels, `785` source-lineage rows, and next raw append rows at `permits.csv` row `258` and `inspections.csv` row `525`.

## 2026-05-25

- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0487` now adds a repair rough-in partial for upper hexaoctacontafoil wing garden porch attic pantry hexaoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0286` as accepted, and the refreshed Dallas pipeline reports `ready` with `286/286` queue corrections, `286` imported permits, `584` imported inspections, `595` eval tasks, `292` reviewed labels, `878` source-lineage rows, and next raw append rows at `permits.csv` row `289` and `inspections.csv` row `587`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0488` now adds a repair rough-in partial for upper heptaoctacontafoil wing garden porch attic pantry heptaoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0287` as accepted, and the refreshed Dallas pipeline reports `ready` with `287/287` queue corrections, `287` imported permits, `586` imported inspections, `597` eval tasks, `293` reviewed labels, `881` source-lineage rows, and next raw append rows at `permits.csv` row `290` and `inspections.csv` row `589`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0486` now adds a repair rough-in partial for upper pentaoctacontafoil wing garden porch attic pantry pentaoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0285` as accepted, and the refreshed Dallas pipeline reports `ready` with `285/285` queue corrections, `285` imported permits, `582` imported inspections, `593` eval tasks, `291` reviewed labels, `875` source-lineage rows, and next raw append rows at `permits.csv` row `288` and `inspections.csv` row `585`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0485` now adds a repair rough-in partial for upper tetraoctacontafoil wing garden porch attic pantry tetraoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0284` as accepted, and the refreshed Dallas pipeline reports `ready` with `284/284` queue corrections, `284` imported permits, `580` imported inspections, `591` eval tasks, `290` reviewed labels, `872` source-lineage rows, and next raw append rows at `permits.csv` row `287` and `inspections.csv` row `583`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0484` now adds a repair rough-in partial for upper trioctacontafoil wing garden porch attic pantry trioctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0283` as accepted, and the refreshed Dallas pipeline reports `ready` with `283/283` queue corrections, `283` imported permits, `578` imported inspections, `589` eval tasks, `289` reviewed labels, `869` source-lineage rows, and next raw append rows at `permits.csv` row `286` and `inspections.csv` row `581`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0482` now adds a repair rough-in partial for upper henoctacontafoil wing garden porch attic pantry henoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0281` as accepted, and the refreshed Dallas pipeline reports `ready` with `281/281` queue corrections, `281` imported permits, `574` imported inspections, `585` eval tasks, `287` reviewed labels, `863` source-lineage rows, and next raw append rows at `permits.csv` row `284` and `inspections.csv` row `577`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0483` now adds a repair rough-in partial for upper duooctacontafoil wing garden porch attic pantry duooctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0282` as accepted, and the refreshed Dallas pipeline reports `ready` with `282/282` queue corrections, `282` imported permits, `576` imported inspections, `587` eval tasks, `288` reviewed labels, `866` source-lineage rows, and next raw append rows at `permits.csv` row `285` and `inspections.csv` row `579`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0481` now adds a repair rough-in partial for upper octacontafoil wing garden porch attic pantry octacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0280` as accepted, and the refreshed Dallas pipeline reports `ready` with `280/280` queue corrections, `280` imported permits, `572` imported inspections, `583` eval tasks, `286` reviewed labels, `860` source-lineage rows, and next raw append rows at `permits.csv` row `283` and `inspections.csv` row `575`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0480` now adds a repair rough-in partial for upper enneaheptacontafoil wing garden porch attic pantry enneaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0279` as accepted, and the refreshed Dallas pipeline reports `ready` with `279/279` queue corrections, `279` imported permits, `570` imported inspections, `581` eval tasks, `285` reviewed labels, `857` source-lineage rows, and next raw append rows at `permits.csv` row `282` and `inspections.csv` row `573`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0479` now adds a repair rough-in partial for upper octaheptacontafoil wing garden porch attic pantry octaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0278` as accepted, and the refreshed Dallas pipeline reports `ready` with `278/278` queue corrections, `278` imported permits, `568` imported inspections, `579` eval tasks, `284` reviewed labels, `854` source-lineage rows, and next raw append rows at `permits.csv` row `281` and `inspections.csv` row `571`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0478` now adds a repair rough-in partial for upper heptaheptacontafoil wing garden porch attic pantry heptaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0277` as accepted, and the refreshed Dallas pipeline reports `ready` with `277/277` queue corrections, `277` imported permits, `566` imported inspections, `577` eval tasks, `283` reviewed labels, `851` source-lineage rows, and next raw append rows at `permits.csv` row `280` and `inspections.csv` row `569`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0477` now adds a repair rough-in partial for upper hexaheptacontafoil wing garden porch attic pantry hexaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0276` as accepted, and the refreshed Dallas pipeline reports `ready` with `276/276` queue corrections, `276` imported permits, `564` imported inspections, `575` eval tasks, `282` reviewed labels, `848` source-lineage rows, and next raw append rows at `permits.csv` row `279` and `inspections.csv` row `567`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0476` now adds a repair rough-in partial for upper pentaheptacontafoil wing garden porch attic pantry pentaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0275` as accepted, and the refreshed Dallas pipeline reports `ready` with `275/275` queue corrections, `275` imported permits, `562` imported inspections, `573` eval tasks, `281` reviewed labels, `845` source-lineage rows, and next raw append rows at `permits.csv` row `278` and `inspections.csv` row `565`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0475` now adds a repair rough-in partial for upper tetraheptacontafoil wing garden porch attic pantry tetraheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0274` as accepted, and the refreshed Dallas pipeline reports `ready` with `274/274` queue corrections, `274` imported permits, `560` imported inspections, `571` eval tasks, `280` reviewed labels, `842` source-lineage rows, and next raw append rows at `permits.csv` row `277` and `inspections.csv` row `563`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0474` now adds a repair rough-in partial for upper triheptacontafoil wing garden porch attic pantry triheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0273` as accepted, and the refreshed Dallas pipeline reports `ready` with `273/273` queue corrections, `273` imported permits, `558` imported inspections, `569` eval tasks, `279` reviewed labels, `839` source-lineage rows, and next raw append rows at `permits.csv` row `276` and `inspections.csv` row `561`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0473` now adds a repair rough-in partial for upper doheptacontafoil wing garden porch attic pantry doheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0272` as accepted, and the refreshed Dallas pipeline reports `ready` with `272/272` queue corrections, `272` imported permits, `556` imported inspections, `567` eval tasks, `278` reviewed labels, `836` source-lineage rows, and next raw append rows at `permits.csv` row `275` and `inspections.csv` row `559`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0472` now adds a repair rough-in partial for upper henaheptacontafoil wing garden porch attic pantry henaheptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0271` as accepted, and the refreshed Dallas pipeline reports `ready` with `271/271` queue corrections, `271` imported permits, `554` imported inspections, `565` eval tasks, `277` reviewed labels, `833` source-lineage rows, and next raw append rows at `permits.csv` row `274` and `inspections.csv` row `557`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0471` now adds a repair rough-in partial for upper heptacontafoil wing garden porch attic pantry heptacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0270` as accepted, and the refreshed Dallas pipeline reports `ready` with `270/270` queue corrections, `270` imported permits, `552` imported inspections, `563` eval tasks, `276` reviewed labels, `830` source-lineage rows, and next raw append rows at `permits.csv` row `273` and `inspections.csv` row `555`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0470` now adds a repair rough-in partial for upper enneahexacontafoil wing garden porch attic pantry enneahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0269` as accepted, and the refreshed Dallas pipeline reports `ready` with `269/269` queue corrections, `269` imported permits, `550` imported inspections, `561` eval tasks, `275` reviewed labels, `827` source-lineage rows, and next raw append rows at `permits.csv` row `272` and `inspections.csv` row `553`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0469` now adds a repair rough-in partial for upper octahexacontafoil wing garden porch attic pantry octahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0268` as accepted, and the refreshed Dallas pipeline reports `ready` with `268/268` queue corrections, `268` imported permits, `548` imported inspections, `559` eval tasks, `274` reviewed labels, `824` source-lineage rows, and next raw append rows at `permits.csv` row `271` and `inspections.csv` row `551`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0468` now adds a repair rough-in partial for upper heptahexacontafoil wing garden porch attic pantry heptahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0267` as accepted, and the refreshed Dallas pipeline reports `ready` with `267/267` queue corrections, `267` imported permits, `546` imported inspections, `557` eval tasks, `273` reviewed labels, `821` source-lineage rows, and next raw append rows at `permits.csv` row `270` and `inspections.csv` row `549`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0467` now adds a repair rough-in partial for upper hexahexacontafoil wing garden porch attic pantry hexahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0266` as accepted, and the refreshed Dallas pipeline reports `ready` with `266/266` queue corrections, `266` imported permits, `544` imported inspections, `555` eval tasks, `272` reviewed labels, `818` source-lineage rows, and next raw append rows at `permits.csv` row `269` and `inspections.csv` row `547`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0466` now adds a repair rough-in partial for upper pentahexacontafoil wing garden porch attic pantry pentahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0265` as accepted, and the refreshed Dallas pipeline reports `ready` with `265/265` queue corrections, `265` imported permits, `542` imported inspections, `553` eval tasks, `271` reviewed labels, `815` source-lineage rows, and next raw append rows at `permits.csv` row `268` and `inspections.csv` row `545`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0465` now adds a repair rough-in partial for upper tetrahexacontafoil wing garden porch attic pantry tetrahexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0264` as accepted, and the refreshed Dallas pipeline reports `ready` with `264/264` queue corrections, `264` imported permits, `540` imported inspections, `551` eval tasks, `270` reviewed labels, `812` source-lineage rows, and next raw append rows at `permits.csv` row `267` and `inspections.csv` row `543`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0464` now adds a repair rough-in partial for upper trihexacontafoil wing garden porch attic pantry trihexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0263` as accepted, and the refreshed Dallas pipeline reports `ready` with `263/263` queue corrections, `263` imported permits, `538` imported inspections, `549` eval tasks, `269` reviewed labels, `809` source-lineage rows, and next raw append rows at `permits.csv` row `266` and `inspections.csv` row `541`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0463` now adds a repair rough-in partial for upper dohexacontafoil wing garden porch attic pantry dohexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0262` as accepted, and the refreshed Dallas pipeline reports `ready` with `262/262` queue corrections, `262` imported permits, `536` imported inspections, `547` eval tasks, `268` reviewed labels, `806` source-lineage rows, and next raw append rows at `permits.csv` row `265` and `inspections.csv` row `539`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0462` now adds a repair rough-in partial for upper henhexacontafoil wing garden porch attic pantry henhexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0261` as accepted, and the refreshed Dallas pipeline reports `ready` with `261/261` queue corrections, `261` imported permits, `534` imported inspections, `545` eval tasks, `267` reviewed labels, `803` source-lineage rows, and next raw append rows at `permits.csv` row `264` and `inspections.csv` row `537`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0461` now adds a repair rough-in partial for upper hexacontafoil wing garden porch attic pantry hexacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0260` as accepted, and the refreshed Dallas pipeline reports `ready` with `260/260` queue corrections, `260` imported permits, `532` imported inspections, `543` eval tasks, `266` reviewed labels, `800` source-lineage rows, and next raw append rows at `permits.csv` row `263` and `inspections.csv` row `535`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0460` now adds a repair rough-in partial for upper enneapentacontafoil wing garden porch attic pantry enneapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0259` as accepted, and the refreshed Dallas pipeline reports `ready` with `259/259` queue corrections, `259` imported permits, `530` imported inspections, `541` eval tasks, `265` reviewed labels, `797` source-lineage rows, and next raw append rows at `permits.csv` row `262` and `inspections.csv` row `533`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0457` now adds a repair rough-in partial for upper hexapentacontafoil wing garden porch attic pantry hexapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0256` as accepted, and the refreshed Dallas pipeline reports `ready` with `256/256` queue corrections, `256` imported permits, `524` imported inspections, `535` eval tasks, `262` reviewed labels, `788` source-lineage rows, and next raw append rows at `permits.csv` row `259` and `inspections.csv` row `527`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0458` now adds a repair rough-in partial for upper heptapentacontafoil wing garden porch attic pantry heptapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0257` as accepted, and the refreshed Dallas pipeline reports `ready` with `257/257` queue corrections, `257` imported permits, `526` imported inspections, `537` eval tasks, `263` reviewed labels, `791` source-lineage rows, and next raw append rows at `permits.csv` row `260` and `inspections.csv` row `529`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0459` now adds a repair rough-in partial for upper octapentacontafoil wing garden porch attic pantry octapentacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0258` as accepted, and the refreshed Dallas pipeline reports `ready` with `258/258` queue corrections, `258` imported permits, `528` imported inspections, `539` eval tasks, `264` reviewed labels, `794` source-lineage rows, and next raw append rows at `permits.csv` row `261` and `inspections.csv` row `531`.

## 2026-05-26

- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0558` now adds a repair rough-in partial for upper octopentacontacentafoil wing garden porch attic pantry octopentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0357` as accepted, and the refreshed Dallas pipeline reports `ready` with `357/357` queue corrections, `357` imported permits, `726` imported inspections, `737` eval tasks, `363` reviewed labels, `1091` source-lineage rows, and next raw append rows at `permits.csv` row `360` and `inspections.csv` row `729`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0557` now adds a repair rough-in partial for upper heptapentacontacentafoil wing garden porch attic pantry heptapentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0356` as accepted, and the refreshed Dallas pipeline reports `ready` with `356/356` queue corrections, `356` imported permits, `724` imported inspections, `735` eval tasks, `362` reviewed labels, `1088` source-lineage rows, and next raw append rows at `permits.csv` row `359` and `inspections.csv` row `727`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0556` now adds a repair rough-in partial for upper hexapentacontacentafoil wing garden porch attic pantry hexapentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0355` as accepted, and the refreshed Dallas pipeline reports `ready` with `355/355` queue corrections, `355` imported permits, `722` imported inspections, `733` eval tasks, `361` reviewed labels, `1085` source-lineage rows, and next raw append rows at `permits.csv` row `358` and `inspections.csv` row `725`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0555` now adds a repair rough-in partial for upper pentapentacontacentafoil wing garden porch attic pantry pentapentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0354` as accepted, and the refreshed Dallas pipeline reports `ready` with `354/354` queue corrections, `354` imported permits, `720` imported inspections, `731` eval tasks, `360` reviewed labels, `1082` source-lineage rows, and next raw append rows at `permits.csv` row `357` and `inspections.csv` row `723`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0524` now adds a repair rough-in partial for upper tetracosacentafoil wing garden porch attic pantry tetracosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0323` as accepted, and the refreshed Dallas pipeline reports `ready` with `323/323` queue corrections, `323` imported permits, `658` imported inspections, `669` eval tasks, `329` reviewed labels, `989` source-lineage rows, and next raw append rows at `permits.csv` row `326` and `inspections.csv` row `661`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0523` now adds a repair rough-in partial for upper tricosacentafoil wing garden porch attic pantry tricosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0322` as accepted, and the refreshed Dallas pipeline reports `ready` with `322/322` queue corrections, `322` imported permits, `656` imported inspections, `667` eval tasks, `328` reviewed labels, `986` source-lineage rows, and next raw append rows at `permits.csv` row `325` and `inspections.csv` row `659`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0522` now adds a repair rough-in partial for upper doicosacentafoil wing garden porch attic pantry doicosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0321` as accepted, and the refreshed Dallas pipeline reports `ready` with `321/321` queue corrections, `321` imported permits, `654` imported inspections, `665` eval tasks, `327` reviewed labels, `983` source-lineage rows, and next raw append rows at `permits.csv` row `324` and `inspections.csv` row `657`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0521` now adds a repair rough-in partial for upper henicosacentafoil wing garden porch attic pantry henicosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0320` as accepted, and the refreshed Dallas pipeline reports `ready` with `320/320` queue corrections, `320` imported permits, `652` imported inspections, `663` eval tasks, `326` reviewed labels, `980` source-lineage rows, and next raw append rows at `permits.csv` row `323` and `inspections.csv` row `655`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0520` now adds a repair rough-in partial for upper icosacentafoil wing garden porch attic pantry icosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0319` as accepted, and the refreshed Dallas pipeline reports `ready` with `319/319` queue corrections, `319` imported permits, `650` imported inspections, `661` eval tasks, `325` reviewed labels, `977` source-lineage rows, and next raw append rows at `permits.csv` row `322` and `inspections.csv` row `653`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0519` now adds a repair rough-in partial for upper enneadecacentafoil wing garden porch attic pantry enneadecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0318` as accepted, and the refreshed Dallas pipeline reports `ready` with `318/318` queue corrections, `318` imported permits, `648` imported inspections, `659` eval tasks, `324` reviewed labels, `974` source-lineage rows, and next raw append rows at `permits.csv` row `321` and `inspections.csv` row `651`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0518` now adds a repair rough-in partial for upper octadecacentafoil wing garden porch attic pantry octadecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0317` as accepted, and the refreshed Dallas pipeline reports `ready` with `317/317` queue corrections, `317` imported permits, `646` imported inspections, `657` eval tasks, `323` reviewed labels, `971` source-lineage rows, and next raw append rows at `permits.csv` row `320` and `inspections.csv` row `649`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0517` now adds a repair rough-in partial for upper heptadecacentafoil wing garden porch attic pantry heptadecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0316` as accepted, and the refreshed Dallas pipeline reports `ready` with `316/316` queue corrections, `316` imported permits, `644` imported inspections, `655` eval tasks, `322` reviewed labels, `968` source-lineage rows, and next raw append rows at `permits.csv` row `319` and `inspections.csv` row `647`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0516` now adds a repair rough-in partial for upper hexadecacentafoil wing garden porch attic pantry hexadecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0315` as accepted, and the refreshed Dallas pipeline reports `ready` with `315/315` queue corrections, `315` imported permits, `642` imported inspections, `653` eval tasks, `321` reviewed labels, `965` source-lineage rows, and next raw append rows at `permits.csv` row `318` and `inspections.csv` row `645`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0515` now adds a repair rough-in partial for upper pentadecacentafoil wing garden porch attic pantry pentadecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0314` as accepted, and the refreshed Dallas pipeline reports `ready` with `314/314` queue corrections, `314` imported permits, `640` imported inspections, `651` eval tasks, `320` reviewed labels, `962` source-lineage rows, and next raw append rows at `permits.csv` row `317` and `inspections.csv` row `643`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0514` now adds a repair rough-in partial for upper tetradecacentafoil wing garden porch attic pantry tetradecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0313` as accepted, and the refreshed Dallas pipeline reports `ready` with `313/313` queue corrections, `313` imported permits, `638` imported inspections, `649` eval tasks, `319` reviewed labels, `959` source-lineage rows, and next raw append rows at `permits.csv` row `316` and `inspections.csv` row `641`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0513` now adds a repair rough-in partial for upper tridecacentafoil wing garden porch attic pantry tridecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0312` as accepted, and the refreshed Dallas pipeline reports `ready` with `312/312` queue corrections, `312` imported permits, `636` imported inspections, `647` eval tasks, `318` reviewed labels, `956` source-lineage rows, and next raw append rows at `permits.csv` row `315` and `inspections.csv` row `639`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0512` now adds a repair rough-in partial for upper dodecacentafoil wing garden porch attic pantry dodecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0311` as accepted, and the refreshed Dallas pipeline reports `ready` with `311/311` queue corrections, `311` imported permits, `634` imported inspections, `645` eval tasks, `317` reviewed labels, `953` source-lineage rows, and next raw append rows at `permits.csv` row `314` and `inspections.csv` row `637`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0511` now adds a repair rough-in partial for upper hendecacentafoil wing garden porch attic pantry hendecacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0310` as accepted, and the refreshed Dallas pipeline reports `ready` with `310/310` queue corrections, `310` imported permits, `632` imported inspections, `643` eval tasks, `316` reviewed labels, `950` source-lineage rows, and next raw append rows at `permits.csv` row `313` and `inspections.csv` row `635`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0510` now adds a repair rough-in partial for upper decacentafoil wing garden porch attic pantry decacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0309` as accepted, and the refreshed Dallas pipeline reports `ready` with `309/309` queue corrections, `309` imported permits, `630` imported inspections, `641` eval tasks, `315` reviewed labels, `947` source-lineage rows, and next raw append rows at `permits.csv` row `312` and `inspections.csv` row `633`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0509` now adds a repair rough-in partial for upper enneacentafoil wing garden porch attic pantry enneacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0308` as accepted, and the refreshed Dallas pipeline reports `ready` with `308/308` queue corrections, `308` imported permits, `628` imported inspections, `639` eval tasks, `314` reviewed labels, `944` source-lineage rows, and next raw append rows at `permits.csv` row `311` and `inspections.csv` row `631`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0508` now adds a repair rough-in partial for upper octacentafoil wing garden porch attic pantry octacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0307` as accepted, and the refreshed Dallas pipeline reports `ready` with `307/307` queue corrections, `307` imported permits, `626` imported inspections, `637` eval tasks, `313` reviewed labels, `941` source-lineage rows, and next raw append rows at `permits.csv` row `310` and `inspections.csv` row `629`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0507` now adds a repair rough-in partial for upper heptacentafoil wing garden porch attic pantry heptacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0306` as accepted, and the refreshed Dallas pipeline reports `ready` with `306/306` queue corrections, `306` imported permits, `624` imported inspections, `635` eval tasks, `312` reviewed labels, `938` source-lineage rows, and next raw append rows at `permits.csv` row `309` and `inspections.csv` row `627`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0506` now adds a repair rough-in partial for upper hexacentafoil wing garden porch attic pantry hexacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0305` as accepted, and the refreshed Dallas pipeline reports `ready` with `305/305` queue corrections, `305` imported permits, `622` imported inspections, `633` eval tasks, `311` reviewed labels, `935` source-lineage rows, and next raw append rows at `permits.csv` row `308` and `inspections.csv` row `625`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0505` now adds a repair rough-in partial for upper pentacentafoil wing garden porch attic pantry pentacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0304` as accepted, and the refreshed Dallas pipeline reports `ready` with `304/304` queue corrections, `304` imported permits, `620` imported inspections, `631` eval tasks, `310` reviewed labels, `932` source-lineage rows, and next raw append rows at `permits.csv` row `307` and `inspections.csv` row `623`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0504` now adds a repair rough-in partial for upper tetracentafoil wing garden porch attic pantry tetracentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0303` as accepted, and the refreshed Dallas pipeline reports `ready` with `303/303` queue corrections, `303` imported permits, `618` imported inspections, `629` eval tasks, `309` reviewed labels, `929` source-lineage rows, and next raw append rows at `permits.csv` row `306` and `inspections.csv` row `621`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0503` now adds a repair rough-in partial for upper triacentafoil wing garden porch attic pantry triacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0302` as accepted, and the refreshed Dallas pipeline reports `ready` with `302/302` queue corrections, `302` imported permits, `616` imported inspections, `627` eval tasks, `308` reviewed labels, `926` source-lineage rows, and next raw append rows at `permits.csv` row `305` and `inspections.csv` row `619`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0502` now adds a repair rough-in partial for upper doacentafoil wing garden porch attic pantry doacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0301` as accepted, and the refreshed Dallas pipeline reports `ready` with `301/301` queue corrections, `301` imported permits, `614` imported inspections, `625` eval tasks, `307` reviewed labels, `923` source-lineage rows, and next raw append rows at `permits.csv` row `304` and `inspections.csv` row `617`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0501` now adds a repair rough-in partial for upper henacentafoil wing garden porch attic pantry henacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0300` as accepted, and the refreshed Dallas pipeline reports `ready` with `300/300` queue corrections, `300` imported permits, `612` imported inspections, `623` eval tasks, `306` reviewed labels, `920` source-lineage rows, and next raw append rows at `permits.csv` row `303` and `inspections.csv` row `615`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0500` now adds a repair rough-in partial for upper centafoil wing garden porch attic pantry centafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0299` as accepted, and the refreshed Dallas pipeline reports `ready` with `299/299` queue corrections, `299` imported permits, `610` imported inspections, `621` eval tasks, `305` reviewed labels, `917` source-lineage rows, and next raw append rows at `permits.csv` row `302` and `inspections.csv` row `613`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0499` now adds a repair rough-in partial for upper octanonagintafoil wing garden porch attic pantry octanonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0298` as accepted, and the refreshed Dallas pipeline reports `ready` with `298/298` queue corrections, `298` imported permits, `608` imported inspections, `619` eval tasks, `304` reviewed labels, `914` source-lineage rows, and next raw append rows at `permits.csv` row `301` and `inspections.csv` row `611`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0498` now adds a repair rough-in partial for upper heptanonagintafoil wing garden porch attic pantry heptanonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0297` as accepted, and the refreshed Dallas pipeline reports `ready` with `297/297` queue corrections, `297` imported permits, `606` imported inspections, `617` eval tasks, `303` reviewed labels, `911` source-lineage rows, and next raw append rows at `permits.csv` row `300` and `inspections.csv` row `609`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0497` now adds a repair rough-in partial for upper hexanonagintafoil wing garden porch attic pantry hexanonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0296` as accepted, and the refreshed Dallas pipeline reports `ready` with `296/296` queue corrections, `296` imported permits, `604` imported inspections, `615` eval tasks, `302` reviewed labels, `908` source-lineage rows, and next raw append rows at `permits.csv` row `299` and `inspections.csv` row `607`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0496` now adds a repair rough-in partial for upper pentanonagintafoil wing garden porch attic pantry pentanonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0295` as accepted, and the refreshed Dallas pipeline reports `ready` with `295/295` queue corrections, `295` imported permits, `602` imported inspections, `613` eval tasks, `301` reviewed labels, `905` source-lineage rows, and next raw append rows at `permits.csv` row `298` and `inspections.csv` row `605`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0495` now adds a repair rough-in partial for upper tetranonagintafoil wing garden porch attic pantry tetranonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0294` as accepted, and the refreshed Dallas pipeline reports `ready` with `294/294` queue corrections, `294` imported permits, `600` imported inspections, `611` eval tasks, `300` reviewed labels, `902` source-lineage rows, and next raw append rows at `permits.csv` row `297` and `inspections.csv` row `603`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0494` now adds a repair rough-in partial for upper triononagintafoil wing garden porch attic pantry triononagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0293` as accepted, and the refreshed Dallas pipeline reports `ready` with `293/293` queue corrections, `293` imported permits, `598` imported inspections, `609` eval tasks, `299` reviewed labels, `899` source-lineage rows, and next raw append rows at `permits.csv` row `296` and `inspections.csv` row `601`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0493` now adds a repair rough-in partial for upper duononagintafoil wing garden porch attic pantry duononagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0292` as accepted, and the refreshed Dallas pipeline reports `ready` with `292/292` queue corrections, `292` imported permits, `596` imported inspections, `607` eval tasks, `298` reviewed labels, `896` source-lineage rows, and next raw append rows at `permits.csv` row `295` and `inspections.csv` row `599`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0492` now adds a repair rough-in partial for upper hennonagintafoil wing garden porch attic pantry hennonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0291` as accepted, and the refreshed Dallas pipeline reports `ready` with `291/291` queue corrections, `291` imported permits, `594` imported inspections, `605` eval tasks, `297` reviewed labels, `893` source-lineage rows, and next raw append rows at `permits.csv` row `294` and `inspections.csv` row `597`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0489` now adds a repair rough-in partial for upper octaoctacontafoil wing garden porch attic pantry octaoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0288` as accepted, and the refreshed Dallas pipeline reports `ready` with `288/288` queue corrections, `288` imported permits, `588` imported inspections, `599` eval tasks, `294` reviewed labels, `884` source-lineage rows, and next raw append rows at `permits.csv` row `291` and `inspections.csv` row `591`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0490` now adds a repair rough-in partial for upper enneaoctacontafoil wing garden porch attic pantry enneaoctacontafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0289` as accepted, and the refreshed Dallas pipeline reports `ready` with `289/289` queue corrections, `289` imported permits, `590` imported inspections, `601` eval tasks, `295` reviewed labels, `887` source-lineage rows, and next raw append rows at `permits.csv` row `292` and `inspections.csv` row `593`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0491` now adds a repair rough-in partial for upper nonagintafoil wing garden porch attic pantry nonagintafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0290` as accepted, and the refreshed Dallas pipeline reports `ready` with `290/290` queue corrections, `290` imported permits, `592` imported inspections, `603` eval tasks, `296` reviewed labels, `890` source-lineage rows, and next raw append rows at `permits.csv` row `293` and `inspections.csv` row `595`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0525` now adds a repair rough-in partial for upper pentacosacentafoil wing garden porch attic pantry pentacosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0324` as accepted, and the refreshed Dallas pipeline reports `ready` with `324/324` queue corrections, `324` imported permits, `660` imported inspections, `671` eval tasks, `330` reviewed labels, `992` source-lineage rows, and next raw append rows at `permits.csv` row `327` and `inspections.csv` row `663`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0526` now adds a repair rough-in partial for upper hexacosacentafoil wing garden porch attic pantry hexacosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0325` as accepted, and the refreshed Dallas pipeline reports `ready` with `325/325` queue corrections, `325` imported permits, `662` imported inspections, `673` eval tasks, `331` reviewed labels, `995` source-lineage rows, and next raw append rows at `permits.csv` row `328` and `inspections.csv` row `665`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0527` now adds a repair rough-in partial for upper heptacosacentafoil wing garden porch attic pantry heptacosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0326` as accepted, and the refreshed Dallas pipeline reports `ready` with `326/326` queue corrections, `326` imported permits, `664` imported inspections, `675` eval tasks, `332` reviewed labels, `998` source-lineage rows, and next raw append rows at `permits.csv` row `329` and `inspections.csv` row `667`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0528` now adds a repair rough-in partial for upper octacosacentafoil wing garden porch attic pantry octacosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0327` as accepted, and the refreshed Dallas pipeline reports `ready` with `327/327` queue corrections, `327` imported permits, `666` imported inspections, `677` eval tasks, `333` reviewed labels, `1001` source-lineage rows, and next raw append rows at `permits.csv` row `330` and `inspections.csv` row `669`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0529` now adds a repair rough-in partial for upper enneacosacentafoil wing garden porch attic pantry enneacosacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0328` as accepted, and the refreshed Dallas pipeline reports `ready` with `328/328` queue corrections, `328` imported permits, `668` imported inspections, `679` eval tasks, `334` reviewed labels, `1004` source-lineage rows, and next raw append rows at `permits.csv` row `331` and `inspections.csv` row `671`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0530` now adds a repair rough-in partial for upper triacontacentafoil wing garden porch attic pantry triacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0329` as accepted, and the refreshed Dallas pipeline reports `ready` with `329/329` queue corrections, `329` imported permits, `670` imported inspections, `681` eval tasks, `335` reviewed labels, `1007` source-lineage rows, and next raw append rows at `permits.csv` row `332` and `inspections.csv` row `673`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0531` now adds a repair rough-in partial for upper hentriacontacentafoil wing garden porch attic pantry hentriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0330` as accepted, and the refreshed Dallas pipeline reports `ready` with `330/330` queue corrections, `330` imported permits, `672` imported inspections, `683` eval tasks, `336` reviewed labels, `1010` source-lineage rows, and next raw append rows at `permits.csv` row `333` and `inspections.csv` row `675`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0532` now adds a repair rough-in partial for upper dotriacontacentafoil wing garden porch attic pantry dotriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0331` as accepted, and the refreshed Dallas pipeline reports `ready` with `331/331` queue corrections, `331` imported permits, `674` imported inspections, `685` eval tasks, `337` reviewed labels, `1013` source-lineage rows, and next raw append rows at `permits.csv` row `334` and `inspections.csv` row `677`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0533` now adds a repair rough-in partial for upper tritriacontacentafoil wing garden porch attic pantry tritriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0332` as accepted, and the refreshed Dallas pipeline reports `ready` with `332/332` queue corrections, `332` imported permits, `676` imported inspections, `687` eval tasks, `338` reviewed labels, `1016` source-lineage rows, and next raw append rows at `permits.csv` row `335` and `inspections.csv` row `679`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0534` now adds a repair rough-in partial for upper tetratriacontacentafoil wing garden porch attic pantry tetratriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0333` as accepted, and the refreshed Dallas pipeline reports `ready` with `333/333` queue corrections, `333` imported permits, `678` imported inspections, `689` eval tasks, `339` reviewed labels, `1019` source-lineage rows, and next raw append rows at `permits.csv` row `336` and `inspections.csv` row `681`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0535` now adds a repair rough-in partial for upper pentatriacontacentafoil wing garden porch attic pantry pentatriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0334` as accepted, and the refreshed Dallas pipeline reports `ready` with `334/334` queue corrections, `334` imported permits, `680` imported inspections, `691` eval tasks, `340` reviewed labels, `1022` source-lineage rows, and next raw append rows at `permits.csv` row `337` and `inspections.csv` row `683`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0536` now adds a repair rough-in partial for upper hexatriacontacentafoil wing garden porch attic pantry hexatriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0335` as accepted, and the refreshed Dallas pipeline reports `ready` with `335/335` queue corrections, `335` imported permits, `682` imported inspections, `693` eval tasks, `341` reviewed labels, `1025` source-lineage rows, and next raw append rows at `permits.csv` row `338` and `inspections.csv` row `685`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0537` now adds a repair rough-in partial for upper heptatriacontacentafoil wing garden porch attic pantry heptatriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0336` as accepted, and the refreshed Dallas pipeline reports `ready` with `336/336` queue corrections, `336` imported permits, `684` imported inspections, `695` eval tasks, `342` reviewed labels, `1028` source-lineage rows, and next raw append rows at `permits.csv` row `339` and `inspections.csv` row `687`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0538` now adds a repair rough-in partial for upper octatriacontacentafoil wing garden porch attic pantry octatriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0337` as accepted, and the refreshed Dallas pipeline reports `ready` with `337/337` queue corrections, `337` imported permits, `686` imported inspections, `697` eval tasks, `343` reviewed labels, `1031` source-lineage rows, and next raw append rows at `permits.csv` row `340` and `inspections.csv` row `689`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0539` now adds a repair rough-in partial for upper enneatriacontacentafoil wing garden porch attic pantry enneatriacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0338` as accepted, and the refreshed Dallas pipeline reports `ready` with `338/338` queue corrections, `338` imported permits, `688` imported inspections, `699` eval tasks, `344` reviewed labels, `1034` source-lineage rows, and next raw append rows at `permits.csv` row `341` and `inspections.csv` row `691`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0540` now adds a repair rough-in partial for upper tetracontacentafoil wing garden porch attic pantry tetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0339` as accepted, and the refreshed Dallas pipeline reports `ready` with `339/339` queue corrections, `339` imported permits, `690` imported inspections, `701` eval tasks, `345` reviewed labels, `1037` source-lineage rows, and next raw append rows at `permits.csv` row `342` and `inspections.csv` row `693`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0541` now adds a repair rough-in partial for upper hentetracontacentafoil wing garden porch attic pantry hentetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0340` as accepted, and the refreshed Dallas pipeline reports `ready` with `340/340` queue corrections, `340` imported permits, `692` imported inspections, `703` eval tasks, `346` reviewed labels, `1040` source-lineage rows, and next raw append rows at `permits.csv` row `343` and `inspections.csv` row `695`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0542` now adds a repair rough-in partial for upper dotetracontacentafoil wing garden porch attic pantry dotetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0341` as accepted, and the refreshed Dallas pipeline reports `ready` with `341/341` queue corrections, `341` imported permits, `694` imported inspections, `705` eval tasks, `347` reviewed labels, `1043` source-lineage rows, and next raw append rows at `permits.csv` row `344` and `inspections.csv` row `697`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0543` now adds a repair rough-in partial for upper tritetracontacentafoil wing garden porch attic pantry tritetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0342` as accepted, and the refreshed Dallas pipeline reports `ready` with `342/342` queue corrections, `342` imported permits, `696` imported inspections, `707` eval tasks, `348` reviewed labels, `1046` source-lineage rows, and next raw append rows at `permits.csv` row `345` and `inspections.csv` row `699`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0544` now adds a repair rough-in partial for upper tetratetracontacentafoil wing garden porch attic pantry tetratetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0343` as accepted, and the refreshed Dallas pipeline reports `ready` with `343/343` queue corrections, `343` imported permits, `698` imported inspections, `709` eval tasks, `349` reviewed labels, `1049` source-lineage rows, and next raw append rows at `permits.csv` row `346` and `inspections.csv` row `701`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0545` now adds a repair rough-in partial for upper pentatetracontacentafoil wing garden porch attic pantry pentatetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0344` as accepted, and the refreshed Dallas pipeline reports `ready` with `344/344` queue corrections, `344` imported permits, `700` imported inspections, `711` eval tasks, `350` reviewed labels, `1052` source-lineage rows, and next raw append rows at `permits.csv` row `347` and `inspections.csv` row `703`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0546` now adds a repair rough-in partial for upper hexatetracontacentafoil wing garden porch attic pantry hexatetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0345` as accepted, and the refreshed Dallas pipeline reports `ready` with `345/345` queue corrections, `345` imported permits, `702` imported inspections, `713` eval tasks, `351` reviewed labels, `1055` source-lineage rows, and next raw append rows at `permits.csv` row `348` and `inspections.csv` row `705`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0547` now adds a repair rough-in partial for upper heptatetracontacentafoil wing garden porch attic pantry heptatetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0346` as accepted, and the refreshed Dallas pipeline reports `ready` with `346/346` queue corrections, `346` imported permits, `704` imported inspections, `715` eval tasks, `352` reviewed labels, `1058` source-lineage rows, and next raw append rows at `permits.csv` row `349` and `inspections.csv` row `707`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0548` now adds a repair rough-in partial for upper octatetracontacentafoil wing garden porch attic pantry octatetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0347` as accepted, and the refreshed Dallas pipeline reports `ready` with `347/347` queue corrections, `347` imported permits, `706` imported inspections, `717` eval tasks, `353` reviewed labels, `1061` source-lineage rows, and next raw append rows at `permits.csv` row `350` and `inspections.csv` row `709`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0549` now adds a repair rough-in partial for upper enneatetracontacentafoil wing garden porch attic pantry enneatetracontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0348` as accepted, and the refreshed Dallas pipeline reports `ready` with `348/348` queue corrections, `348` imported permits, `708` imported inspections, `719` eval tasks, `354` reviewed labels, `1064` source-lineage rows, and next raw append rows at `permits.csv` row `351` and `inspections.csv` row `711`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0550` now adds a repair rough-in partial for upper pentacontacentafoil wing garden porch attic pantry pentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0349` as accepted, and the refreshed Dallas pipeline reports `ready` with `349/349` queue corrections, `349` imported permits, `710` imported inspections, `721` eval tasks, `355` reviewed labels, `1067` source-lineage rows, and next raw append rows at `permits.csv` row `352` and `inspections.csv` row `713`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0551` now adds a repair rough-in partial for upper henpentacontacentafoil wing garden porch attic pantry henpentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0350` as accepted, and the refreshed Dallas pipeline reports `ready` with `350/350` queue corrections, `350` imported permits, `712` imported inspections, `723` eval tasks, `356` reviewed labels, `1070` source-lineage rows, and next raw append rows at `permits.csv` row `353` and `inspections.csv` row `715`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0552` now adds a repair rough-in partial for upper dopentacontacentafoil wing garden porch attic pantry dopentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0351` as accepted, and the refreshed Dallas pipeline reports `ready` with `351/351` queue corrections, `351` imported permits, `714` imported inspections, `725` eval tasks, `357` reviewed labels, `1073` source-lineage rows, and next raw append rows at `permits.csv` row `354` and `inspections.csv` row `717`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0553` now adds a repair rough-in partial for upper tripentacontacentafoil wing garden porch attic pantry tripentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0352` as accepted, and the refreshed Dallas pipeline reports `ready` with `352/352` queue corrections, `352` imported permits, `716` imported inspections, `727` eval tasks, `358` reviewed labels, `1076` source-lineage rows, and next raw append rows at `permits.csv` row `355` and `inspections.csv` row `719`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0554` now adds a repair rough-in partial for upper tetrapentacontacentafoil wing garden porch attic pantry tetrapentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0353` as accepted, and the refreshed Dallas pipeline reports `ready` with `353/353` queue corrections, `353` imported permits, `718` imported inspections, `729` eval tasks, `359` reviewed labels, `1079` source-lineage rows, and next raw append rows at `permits.csv` row `356` and `inspections.csv` row `721`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0559` now adds a repair rough-in partial for upper enneapentacontacentafoil wing garden porch attic pantry enneapentacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0358` as accepted, and the refreshed Dallas pipeline reports `ready` with `358/358` queue corrections, `358` imported permits, `728` imported inspections, `739` eval tasks, `364` reviewed labels, `1094` source-lineage rows, and next raw append rows at `permits.csv` row `361` and `inspections.csv` row `731`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0560` now adds a repair rough-in partial for upper hexacontacentafoil wing garden porch attic pantry hexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0359` as accepted, and the refreshed Dallas pipeline reports `ready` with `359/359` queue corrections, `359` imported permits, `730` imported inspections, `741` eval tasks, `365` reviewed labels, `1097` source-lineage rows, and next raw append rows at `permits.csv` row `362` and `inspections.csv` row `733`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0561` now adds a repair rough-in partial for upper henhexacontacentafoil wing garden porch attic pantry henhexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0360` as accepted, and the refreshed Dallas pipeline reports `ready` with `360/360` queue corrections, `360` imported permits, `732` imported inspections, `743` eval tasks, `366` reviewed labels, `1100` source-lineage rows, and next raw append rows at `permits.csv` row `363` and `inspections.csv` row `735`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0562` now adds a repair rough-in partial for upper dohexacontacentafoil wing garden porch attic pantry dohexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0361` as accepted, and the refreshed Dallas pipeline reports `ready` with `361/361` queue corrections, `361` imported permits, `734` imported inspections, `745` eval tasks, `367` reviewed labels, `1103` source-lineage rows, and next raw append rows at `permits.csv` row `364` and `inspections.csv` row `737`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0563` now adds a repair rough-in partial for upper trihexacontacentafoil wing garden porch attic pantry trihexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0362` as accepted, and the refreshed Dallas pipeline reports `ready` with `362/362` queue corrections, `362` imported permits, `736` imported inspections, `747` eval tasks, `368` reviewed labels, `1106` source-lineage rows, and next raw append rows at `permits.csv` row `365` and `inspections.csv` row `739`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0564` now adds a repair rough-in partial for upper tetrahexacontacentafoil wing garden porch attic pantry tetrahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0363` as accepted, and the refreshed Dallas pipeline reports `ready` with `363/363` queue corrections, `363` imported permits, `738` imported inspections, `749` eval tasks, `369` reviewed labels, `1109` source-lineage rows, and next raw append rows at `permits.csv` row `366` and `inspections.csv` row `741`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0565` now adds a repair rough-in partial for upper pentahexacontacentafoil wing garden porch attic pantry pentahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0364` as accepted, and the refreshed Dallas pipeline reports `ready` with `364/364` queue corrections, `364` imported permits, `740` imported inspections, `751` eval tasks, `370` reviewed labels, `1112` source-lineage rows, and next raw append rows at `permits.csv` row `367` and `inspections.csv` row `743`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0566` now adds a repair rough-in partial for upper hexahexacontacentafoil wing garden porch attic pantry hexahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0365` as accepted, and the refreshed Dallas pipeline reports `ready` with `365/365` queue corrections, `365` imported permits, `742` imported inspections, `753` eval tasks, `371` reviewed labels, `1115` source-lineage rows, and next raw append rows at `permits.csv` row `368` and `inspections.csv` row `745`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0567` now adds a repair rough-in partial for upper heptahexacontacentafoil wing garden porch attic pantry heptahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0366` as accepted, and the refreshed Dallas pipeline reports `ready` with `366/366` queue corrections, `366` imported permits, `744` imported inspections, `755` eval tasks, `372` reviewed labels, `1118` source-lineage rows, and next raw append rows at `permits.csv` row `369` and `inspections.csv` row `747`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0568` now adds a repair rough-in partial for upper octahexacontacentafoil wing garden porch attic pantry octahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0367` as accepted, and the refreshed Dallas pipeline reports `ready` with `367/367` queue corrections, `367` imported permits, `746` imported inspections, `757` eval tasks, `373` reviewed labels, `1121` source-lineage rows, and next raw append rows at `permits.csv` row `370` and `inspections.csv` row `749`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0569` now adds a repair rough-in partial for upper enneahexacontacentafoil wing garden porch attic pantry enneahexacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0368` as accepted, and the refreshed Dallas pipeline reports `ready` with `368/368` queue corrections, `368` imported permits, `748` imported inspections, `759` eval tasks, `374` reviewed labels, `1124` source-lineage rows, and next raw append rows at `permits.csv` row `371` and `inspections.csv` row `751`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0570` now adds a repair rough-in partial for upper heptacontacentafoil wing garden porch attic pantry heptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0369` as accepted, and the refreshed Dallas pipeline reports `ready` with `369/369` queue corrections, `369` imported permits, `750` imported inspections, `761` eval tasks, `375` reviewed labels, `1127` source-lineage rows, and next raw append rows at `permits.csv` row `372` and `inspections.csv` row `753`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0571` now adds a repair rough-in partial for upper henheptacontacentafoil wing garden porch attic pantry henheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0370` as accepted, and the refreshed Dallas pipeline reports `ready` with `370/370` queue corrections, `370` imported permits, `752` imported inspections, `763` eval tasks, `376` reviewed labels, `1130` source-lineage rows, and next raw append rows at `permits.csv` row `373` and `inspections.csv` row `755`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0572` now adds a repair rough-in partial for upper doheptacontacentafoil wing garden porch attic pantry doheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0371` as accepted, and the refreshed Dallas pipeline reports `ready` with `371/371` queue corrections, `371` imported permits, `754` imported inspections, `765` eval tasks, `377` reviewed labels, `1133` source-lineage rows, and next raw append rows at `permits.csv` row `374` and `inspections.csv` row `757`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0573` now adds a repair rough-in partial for upper triheptacontacentafoil wing garden porch attic pantry triheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0372` as accepted, and the refreshed Dallas pipeline reports `ready` with `372/372` queue corrections, `372` imported permits, `756` imported inspections, `767` eval tasks, `378` reviewed labels, `1136` source-lineage rows, and next raw append rows at `permits.csv` row `375` and `inspections.csv` row `759`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0574` now adds a repair rough-in partial for upper tetraheptacontacentafoil wing garden porch attic pantry tetraheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0373` as accepted, and the refreshed Dallas pipeline reports `ready` with `373/373` queue corrections, `373` imported permits, `758` imported inspections, `769` eval tasks, `379` reviewed labels, `1139` source-lineage rows, and next raw append rows at `permits.csv` row `376` and `inspections.csv` row `761`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0575` now adds a repair rough-in partial for upper pentaheptacontacentafoil wing garden porch attic pantry pentaheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0374` as accepted, and the refreshed Dallas pipeline reports `ready` with `374/374` queue corrections, `374` imported permits, `760` imported inspections, `771` eval tasks, `380` reviewed labels, `1142` source-lineage rows, and next raw append rows at `permits.csv` row `377` and `inspections.csv` row `763`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0576` now adds a repair rough-in partial for upper hexaheptacontacentafoil wing garden porch attic pantry hexaheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0375` as accepted, and the refreshed Dallas pipeline reports `ready` with `375/375` queue corrections, `375` imported permits, `762` imported inspections, `773` eval tasks, `381` reviewed labels, `1145` source-lineage rows, and next raw append rows at `permits.csv` row `378` and `inspections.csv` row `765`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0577` now adds a repair rough-in partial for upper heptaheptacontacentafoil wing garden porch attic pantry heptaheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0376` as accepted, and the refreshed Dallas pipeline reports `ready` with `376/376` queue corrections, `376` imported permits, `764` imported inspections, `775` eval tasks, `382` reviewed labels, `1148` source-lineage rows, and next raw append rows at `permits.csv` row `379` and `inspections.csv` row `767`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0578` now adds a repair rough-in partial for upper octoheptacontacentafoil wing garden porch attic pantry octoheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0377` as accepted, and the refreshed Dallas pipeline reports `ready` with `377/377` queue corrections, `377` imported permits, `766` imported inspections, `777` eval tasks, `383` reviewed labels, `1151` source-lineage rows, and next raw append rows at `permits.csv` row `380` and `inspections.csv` row `769`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0579` now adds a repair rough-in partial for upper enneaheptacontacentafoil wing garden porch attic pantry enneaheptacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0378` as accepted, and the refreshed Dallas pipeline reports `ready` with `378/378` queue corrections, `378` imported permits, `768` imported inspections, `779` eval tasks, `384` reviewed labels, `1154` source-lineage rows, and next raw append rows at `permits.csv` row `381` and `inspections.csv` row `771`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0580` now adds a repair rough-in partial for upper octacontacentafoil wing garden porch attic pantry octacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0379` as accepted, and the refreshed Dallas pipeline reports `ready` with `379/379` queue corrections, `379` imported permits, `770` imported inspections, `781` eval tasks, `385` reviewed labels, `1157` source-lineage rows, and next raw append rows at `permits.csv` row `382` and `inspections.csv` row `773`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0581` now adds a repair rough-in partial for upper henoctacontacentafoil wing garden porch attic pantry henoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0380` as accepted, and the refreshed Dallas pipeline reports `ready` with `380/380` queue corrections, `380` imported permits, `772` imported inspections, `783` eval tasks, `386` reviewed labels, `1160` source-lineage rows, and next raw append rows at `permits.csv` row `383` and `inspections.csv` row `775`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0582` now adds a repair rough-in partial for upper dooctacontacentafoil wing garden porch attic pantry dooctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0381` as accepted, and the refreshed Dallas pipeline reports `ready` with `381/381` queue corrections, `381` imported permits, `774` imported inspections, `785` eval tasks, `387` reviewed labels, `1163` source-lineage rows, and next raw append rows at `permits.csv` row `384` and `inspections.csv` row `777`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0583` now adds a repair rough-in partial for upper trioctacontacentafoil wing garden porch attic pantry trioctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0382` as accepted, and the refreshed Dallas pipeline reports `ready` with `382/382` queue corrections, `382` imported permits, `776` imported inspections, `787` eval tasks, `388` reviewed labels, `1166` source-lineage rows, and next raw append rows at `permits.csv` row `385` and `inspections.csv` row `779`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0584` now adds a repair rough-in partial for upper tetraoctacontacentafoil wing garden porch attic pantry tetraoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0383` as accepted, and the refreshed Dallas pipeline reports `ready` with `383/383` queue corrections, `383` imported permits, `778` imported inspections, `789` eval tasks, `389` reviewed labels, `1169` source-lineage rows, and next raw append rows at `permits.csv` row `386` and `inspections.csv` row `781`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0585` now adds a repair rough-in partial for upper pentaoctacontacentafoil wing garden porch attic pantry pentaoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0384` as accepted, and the refreshed Dallas pipeline reports `ready` with `384/384` queue corrections, `384` imported permits, `780` imported inspections, `791` eval tasks, `390` reviewed labels, `1172` source-lineage rows, and next raw append rows at `permits.csv` row `387` and `inspections.csv` row `783`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0586` now adds a repair rough-in partial for upper hexaoctacontacentafoil wing garden porch attic pantry hexaoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0385` as accepted, and the refreshed Dallas pipeline reports `ready` with `385/385` queue corrections, `385` imported permits, `782` imported inspections, `793` eval tasks, `391` reviewed labels, `1175` source-lineage rows, and next raw append rows at `permits.csv` row `388` and `inspections.csv` row `785`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0587` now adds a repair rough-in partial for upper heptaoctacontacentafoil wing garden porch attic pantry heptaoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0386` as accepted, and the refreshed Dallas pipeline reports `ready` with `386/386` queue corrections, `386` imported permits, `784` imported inspections, `795` eval tasks, `392` reviewed labels, `1178` source-lineage rows, and next raw append rows at `permits.csv` row `389` and `inspections.csv` row `787`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0588` now adds a repair rough-in partial for upper octooctacontacentafoil wing garden porch attic pantry octooctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0387` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `387/387` queue corrections, `387` imported permits, `786` imported inspections, `797` eval tasks, `393` reviewed labels, `1181` source-lineage rows, and next raw append rows at `permits.csv` row `390` and `inspections.csv` row `789`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0589` now adds a repair rough-in partial for upper enneaoctacontacentafoil wing garden porch attic pantry enneaoctacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0388` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `388/388` queue corrections, `388` imported permits, `788` imported inspections, `799` eval tasks, `394` reviewed labels, `1184` source-lineage rows, and next raw append rows at `permits.csv` row `391` and `inspections.csv` row `791`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0590` now adds a repair rough-in partial for upper enneacontacentafoil wing garden porch attic pantry enneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0389` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `389/389` queue corrections, `389` imported permits, `790` imported inspections, `801` eval tasks, `395` reviewed labels, `1187` source-lineage rows, and next raw append rows at `permits.csv` row `392` and `inspections.csv` row `793`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0591` now adds a repair rough-in partial for upper henenneacontacentafoil wing garden porch attic pantry henenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0390` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `390/390` queue corrections, `390` imported permits, `792` imported inspections, `803` eval tasks, `396` reviewed labels, `1190` source-lineage rows, and next raw append rows at `permits.csv` row `393` and `inspections.csv` row `795`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0592` now adds a repair rough-in partial for upper doenneacontacentafoil wing garden porch attic pantry doenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0391` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `391/391` queue corrections, `391` imported permits, `794` imported inspections, `805` eval tasks, `397` reviewed labels, `1193` source-lineage rows, and next raw append rows at `permits.csv` row `394` and `inspections.csv` row `797`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0593` now adds a repair rough-in partial for upper trienneacontacentafoil wing garden porch attic pantry trienneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0392` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `392/392` queue corrections, `392` imported permits, `796` imported inspections, `807` eval tasks, `398` reviewed labels, `1196` source-lineage rows, and next raw append rows at `permits.csv` row `395` and `inspections.csv` row `799`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0594` now adds a repair rough-in partial for upper tetraenneacontacentafoil wing garden porch attic pantry tetraenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0393` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `393/393` queue corrections, `393` imported permits, `798` imported inspections, `809` eval tasks, `399` reviewed labels, `1199` source-lineage rows, and next raw append rows at `permits.csv` row `396` and `inspections.csv` row `801`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0595` now adds a repair rough-in partial for upper pentaenneacontacentafoil wing garden porch attic pantry pentaenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0394` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `394/394` queue corrections, `394` imported permits, `800` imported inspections, `811` eval tasks, `400` reviewed labels, `1202` source-lineage rows, and next raw append rows at `permits.csv` row `397` and `inspections.csv` row `803`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0596` now adds a repair rough-in partial for upper hexaenneacontacentafoil wing garden porch attic pantry hexaenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0395` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `395/395` queue corrections, `395` imported permits, `802` imported inspections, `813` eval tasks, `401` reviewed labels, `1205` source-lineage rows, and next raw append rows at `permits.csv` row `398` and `inspections.csv` row `805`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0597` now adds a repair rough-in partial for upper heptaenneacontacentafoil wing garden porch attic pantry heptaenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0396` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `396/396` queue corrections, `396` imported permits, `804` imported inspections, `815` eval tasks, `402` reviewed labels, `1208` source-lineage rows, and next raw append rows at `permits.csv` row `399` and `inspections.csv` row `807`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0598` now adds a repair rough-in partial for upper octoenneacontacentafoil wing garden porch attic pantry octoenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0397` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `397/397` queue corrections, `397` imported permits, `806` imported inspections, `817` eval tasks, `403` reviewed labels, `1211` source-lineage rows, and next raw append rows at `permits.csv` row `400` and `inspections.csv` row `809`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0599` now adds a repair rough-in partial for upper enneaenneacontacentafoil wing garden porch attic pantry enneaenneacontacentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0398` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `398/398` queue corrections, `398` imported permits, `808` imported inspections, `819` eval tasks, `404` reviewed labels, `1214` source-lineage rows, and next raw append rows at `permits.csv` row `401` and `inspections.csv` row `811`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0600` now adds a repair rough-in partial for upper ducentafoil wing garden porch attic pantry ducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0399` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `399/399` queue corrections, `399` imported permits, `810` imported inspections, `821` eval tasks, `405` reviewed labels, `1217` source-lineage rows, and next raw append rows at `permits.csv` row `402` and `inspections.csv` row `813`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0601` now adds a repair rough-in partial for upper henducentafoil wing garden porch attic pantry henducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0400` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `400/400` queue corrections, `400` imported permits, `812` imported inspections, `823` eval tasks, `406` reviewed labels, `1220` source-lineage rows, and next raw append rows at `permits.csv` row `403` and `inspections.csv` row `815`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0602` now adds a repair rough-in partial for upper doducentafoil wing garden porch attic pantry doducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0401` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `401/401` queue corrections, `401` imported permits, `814` imported inspections, `825` eval tasks, `407` reviewed labels, `1223` source-lineage rows, and next raw append rows at `permits.csv` row `404` and `inspections.csv` row `817`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0603` now adds a repair rough-in partial for upper triducentafoil wing garden porch attic pantry triducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0402` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `402/402` queue corrections, `402` imported permits, `816` imported inspections, `827` eval tasks, `408` reviewed labels, `1226` source-lineage rows, and next raw append rows at `permits.csv` row `405` and `inspections.csv` row `819`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0604` now adds a repair rough-in partial for upper tetraducentafoil wing garden porch attic pantry tetraducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0403` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `403/403` queue corrections, `403` imported permits, `818` imported inspections, `829` eval tasks, `409` reviewed labels, `1229` source-lineage rows, and next raw append rows at `permits.csv` row `406` and `inspections.csv` row `821`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0605` now adds a repair rough-in partial for upper pentaducentafoil wing garden porch attic pantry pentaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0404` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `404/404` queue corrections, `404` imported permits, `820` imported inspections, `831` eval tasks, `410` reviewed labels, `1232` source-lineage rows, and next raw append rows at `permits.csv` row `407` and `inspections.csv` row `823`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0606` now adds a repair rough-in partial for upper hexaducentafoil wing garden porch attic pantry hexaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0405` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `405/405` queue corrections, `405` imported permits, `822` imported inspections, `833` eval tasks, `411` reviewed labels, `1235` source-lineage rows, and next raw append rows at `permits.csv` row `408` and `inspections.csv` row `825`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0607` now adds a repair rough-in partial for upper heptaducentafoil wing garden porch attic pantry heptaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0406` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `406/406` queue corrections, `406` imported permits, `824` imported inspections, `835` eval tasks, `412` reviewed labels, `1238` source-lineage rows, and next raw append rows at `permits.csv` row `409` and `inspections.csv` row `827`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0608` now adds a repair rough-in partial for upper octaducentafoil wing garden porch attic pantry octaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0407` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `407/407` queue corrections, `407` imported permits, `826` imported inspections, `837` eval tasks, `413` reviewed labels, `1241` source-lineage rows, and next raw append rows at `permits.csv` row `410` and `inspections.csv` row `829`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0609` now adds a repair rough-in partial for upper enneaducentafoil wing garden porch attic pantry enneaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0408` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `408/408` queue corrections, `408` imported permits, `828` imported inspections, `839` eval tasks, `414` reviewed labels, `1244` source-lineage rows, and next raw append rows at `permits.csv` row `411` and `inspections.csv` row `831`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0610` now adds a repair rough-in partial for upper decaducentafoil wing garden porch attic pantry decaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0409` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `409/409` queue corrections, `409` imported permits, `830` imported inspections, `841` eval tasks, `415` reviewed labels, `1247` source-lineage rows, and next raw append rows at `permits.csv` row `412` and `inspections.csv` row `833`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0611` now adds a repair rough-in partial for upper hendecaducentafoil wing garden porch attic pantry hendecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0410` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `410/410` queue corrections, `410` imported permits, `832` imported inspections, `843` eval tasks, `416` reviewed labels, `1250` source-lineage rows, and next raw append rows at `permits.csv` row `413` and `inspections.csv` row `835`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0612` now adds a repair rough-in partial for upper dodecaducentafoil wing garden porch attic pantry dodecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0411` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `411/411` queue corrections, `411` imported permits, `834` imported inspections, `845` eval tasks, `417` reviewed labels, `1253` source-lineage rows, and next raw append rows at `permits.csv` row `414` and `inspections.csv` row `837`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0613` now adds a repair rough-in partial for upper tridecaducentafoil wing garden porch attic pantry tridecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0412` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `412/412` queue corrections, `412` imported permits, `836` imported inspections, `847` eval tasks, `418` reviewed labels, `1256` source-lineage rows, and next raw append rows at `permits.csv` row `415` and `inspections.csv` row `839`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0614` now adds a repair rough-in partial for upper tetradecaducentafoil wing garden porch attic pantry tetradecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0413` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `413/413` queue corrections, `413` imported permits, `838` imported inspections, `849` eval tasks, `419` reviewed labels, `1259` source-lineage rows, and next raw append rows at `permits.csv` row `416` and `inspections.csv` row `841`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0615` now adds a repair rough-in partial for upper pentadecaducentafoil wing garden porch attic pantry pentadecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0414` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `414/414` queue corrections, `414` imported permits, `840` imported inspections, `851` eval tasks, `420` reviewed labels, `1262` source-lineage rows, and next raw append rows at `permits.csv` row `417` and `inspections.csv` row `843`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0616` now adds a repair rough-in partial for upper hexadecaducentafoil wing garden porch attic pantry hexadecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0415` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `415/415` queue corrections, `415` imported permits, `842` imported inspections, `853` eval tasks, `421` reviewed labels, `1265` source-lineage rows, and next raw append rows at `permits.csv` row `418` and `inspections.csv` row `845`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0617` now adds a repair rough-in partial for upper heptadecaducentafoil wing garden porch attic pantry heptadecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0416` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `416/416` queue corrections, `416` imported permits, `844` imported inspections, `855` eval tasks, `422` reviewed labels, `1268` source-lineage rows, and next raw append rows at `permits.csv` row `419` and `inspections.csv` row `847`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0618` now adds a repair rough-in partial for upper octadecaducentafoil wing garden porch attic pantry octadecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0417` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `417/417` queue corrections, `417` imported permits, `846` imported inspections, `857` eval tasks, `423` reviewed labels, `1271` source-lineage rows, and next raw append rows at `permits.csv` row `420` and `inspections.csv` row `849`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0619` now adds a repair rough-in partial for upper enneadecaducentafoil wing garden porch attic pantry enneadecaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0418` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `418/418` queue corrections, `418` imported permits, `848` imported inspections, `859` eval tasks, `424` reviewed labels, `1274` source-lineage rows, and next raw append rows at `permits.csv` row `421` and `inspections.csv` row `851`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0620` now adds a repair rough-in partial for upper icosaducentafoil wing garden porch attic pantry icosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0419` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `419/419` queue corrections, `419` imported permits, `850` imported inspections, `861` eval tasks, `425` reviewed labels, `1277` source-lineage rows, and next raw append rows at `permits.csv` row `422` and `inspections.csv` row `853`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0621` now adds a repair rough-in partial for upper henicosaducentafoil wing garden porch attic pantry henicosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0420` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `420/420` queue corrections, `420` imported permits, `852` imported inspections, `863` eval tasks, `426` reviewed labels, `1280` source-lineage rows, and next raw append rows at `permits.csv` row `423` and `inspections.csv` row `855`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0622` now adds a repair rough-in partial for upper docosaducentafoil wing garden porch attic pantry docosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0421` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `421/421` queue corrections, `421` imported permits, `854` imported inspections, `865` eval tasks, `427` reviewed labels, `1283` source-lineage rows, and next raw append rows at `permits.csv` row `424` and `inspections.csv` row `857`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0623` now adds a repair rough-in partial for upper tricosaducentafoil wing garden porch attic pantry tricosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0422` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `422/422` queue corrections, `422` imported permits, `856` imported inspections, `867` eval tasks, `428` reviewed labels, `1286` source-lineage rows, and next raw append rows at `permits.csv` row `425` and `inspections.csv` row `859`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0624` now adds a repair rough-in partial for upper tetracosaducentafoil wing garden porch attic pantry tetracosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0423` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `423/423` queue corrections, `423` imported permits, `858` imported inspections, `869` eval tasks, `429` reviewed labels, `1289` source-lineage rows, and next raw append rows at `permits.csv` row `426` and `inspections.csv` row `861`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0625` now adds a repair rough-in partial for upper pentacosaducentafoil wing garden porch attic pantry pentacosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0424` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `424/424` queue corrections, `424` imported permits, `860` imported inspections, `871` eval tasks, `430` reviewed labels, `1292` source-lineage rows, and next raw append rows at `permits.csv` row `427` and `inspections.csv` row `863`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0626` now adds a repair rough-in partial for upper hexacosaducentafoil wing garden porch attic pantry hexacosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0425` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `425/425` queue corrections, `425` imported permits, `862` imported inspections, `873` eval tasks, `431` reviewed labels, `1295` source-lineage rows, and next raw append rows at `permits.csv` row `428` and `inspections.csv` row `865`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0627` now adds a repair rough-in partial for upper heptacosaducentafoil wing garden porch attic pantry heptacosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0426` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `426/426` queue corrections, `426` imported permits, `864` imported inspections, `875` eval tasks, `432` reviewed labels, `1298` source-lineage rows, and next raw append rows at `permits.csv` row `429` and `inspections.csv` row `867`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0628` now adds a repair rough-in partial for upper octacosaducentafoil wing garden porch attic pantry octacosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0427` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `427/427` queue corrections, `427` imported permits, `866` imported inspections, `877` eval tasks, `433` reviewed labels, `1301` source-lineage rows, and next raw append rows at `permits.csv` row `430` and `inspections.csv` row `869`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0629` now adds a repair rough-in partial for upper enneacosaducentafoil wing garden porch attic pantry enneacosaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0428` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `428/428` queue corrections, `428` imported permits, `868` imported inspections, `879` eval tasks, `434` reviewed labels, `1304` source-lineage rows, and next raw append rows at `permits.csv` row `431` and `inspections.csv` row `871`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0630` now adds a repair rough-in partial for upper triacontaducentafoil wing garden porch attic pantry triacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0429` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `429/429` queue corrections, `429` imported permits, `870` imported inspections, `881` eval tasks, `435` reviewed labels, `1307` source-lineage rows, and next raw append rows at `permits.csv` row `432` and `inspections.csv` row `873`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0631` now adds a repair rough-in partial for upper henatriacontaducentafoil wing garden porch attic pantry henatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0430` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `430/430` queue corrections, `430` imported permits, `872` imported inspections, `883` eval tasks, `436` reviewed labels, `1310` source-lineage rows, and next raw append rows at `permits.csv` row `433` and `inspections.csv` row `875`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0632` now adds a repair rough-in partial for upper duotriacontaducentafoil wing garden porch attic pantry duotriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0431` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `431/431` queue corrections, `431` imported permits, `874` imported inspections, `885` eval tasks, `437` reviewed labels, `1313` source-lineage rows, and next raw append rows at `permits.csv` row `434` and `inspections.csv` row `877`.

## 2026-05-27

- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0673` now adds a repair rough-in partial for upper triseptuagintaducentafoil wing garden porch attic pantry triseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0472` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `472/472` queue corrections, `472` imported permits, `956` imported inspections, `967` eval tasks, `478` reviewed labels, `1436` source-lineage rows, and next raw append rows at `permits.csv` row `475` and `inspections.csv` row `959`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0672` now adds a repair rough-in partial for upper duoseptuagintaducentafoil wing garden porch attic pantry duoseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0471` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `471/471` queue corrections, `471` imported permits, `954` imported inspections, `965` eval tasks, `477` reviewed labels, `1433` source-lineage rows, and next raw append rows at `permits.csv` row `474` and `inspections.csv` row `957`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0671` now adds a repair rough-in partial for upper henseptuagintaducentafoil wing garden porch attic pantry henseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0470` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `470/470` queue corrections, `470` imported permits, `952` imported inspections, `963` eval tasks, `476` reviewed labels, `1430` source-lineage rows, and next raw append rows at `permits.csv` row `473` and `inspections.csv` row `955`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0633` now adds a repair rough-in partial for upper tritriacontaducentafoil wing garden porch attic pantry tritriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0432` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `432/432` queue corrections, `432` imported permits, `876` imported inspections, `887` eval tasks, `438` reviewed labels, `1316` source-lineage rows, and next raw append rows at `permits.csv` row `435` and `inspections.csv` row `879`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0634` now adds a repair rough-in partial for upper tetratriacontaducentafoil wing garden porch attic pantry tetratriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0433` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `433/433` queue corrections, `433` imported permits, `878` imported inspections, `889` eval tasks, `439` reviewed labels, `1319` source-lineage rows, and next raw append rows at `permits.csv` row `436` and `inspections.csv` row `881`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0635` now adds a repair rough-in partial for upper pentatriacontaducentafoil wing garden porch attic pantry pentatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0434` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `434/434` queue corrections, `434` imported permits, `880` imported inspections, `891` eval tasks, `440` reviewed labels, `1322` source-lineage rows, and next raw append rows at `permits.csv` row `437` and `inspections.csv` row `883`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0636` now adds a repair rough-in partial for upper hexatriacontaducentafoil wing garden porch attic pantry hexatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0435` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `435/435` queue corrections, `435` imported permits, `882` imported inspections, `893` eval tasks, `441` reviewed labels, `1325` source-lineage rows, and next raw append rows at `permits.csv` row `438` and `inspections.csv` row `885`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0637` now adds a repair rough-in partial for upper heptatriacontaducentafoil wing garden porch attic pantry heptatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0436` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `436/436` queue corrections, `436` imported permits, `884` imported inspections, `895` eval tasks, `442` reviewed labels, `1328` source-lineage rows, and next raw append rows at `permits.csv` row `439` and `inspections.csv` row `887`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0638` now adds a repair rough-in partial for upper octatriacontaducentafoil wing garden porch attic pantry octatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0437` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `437/437` queue corrections, `437` imported permits, `886` imported inspections, `897` eval tasks, `443` reviewed labels, `1331` source-lineage rows, and next raw append rows at `permits.csv` row `440` and `inspections.csv` row `889`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0639` now adds a repair rough-in partial for upper enneatriacontaducentafoil wing garden porch attic pantry enneatriacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0438` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `438/438` queue corrections, `438` imported permits, `888` imported inspections, `899` eval tasks, `444` reviewed labels, `1334` source-lineage rows, and next raw append rows at `permits.csv` row `441` and `inspections.csv` row `891`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0640` now adds a repair rough-in partial for upper tetracontaducentafoil wing garden porch attic pantry tetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0439` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `439/439` queue corrections, `439` imported permits, `890` imported inspections, `901` eval tasks, `445` reviewed labels, `1337` source-lineage rows, and next raw append rows at `permits.csv` row `442` and `inspections.csv` row `893`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0641` now adds a repair rough-in partial for upper hentetracontaducentafoil wing garden porch attic pantry hentetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0440` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `440/440` queue corrections, `440` imported permits, `892` imported inspections, `903` eval tasks, `446` reviewed labels, `1340` source-lineage rows, and next raw append rows at `permits.csv` row `443` and `inspections.csv` row `895`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0642` now adds a repair rough-in partial for upper duotetracontaducentafoil wing garden porch attic pantry duotetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0441` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `441/441` queue corrections, `441` imported permits, `894` imported inspections, `905` eval tasks, `447` reviewed labels, `1343` source-lineage rows, and next raw append rows at `permits.csv` row `444` and `inspections.csv` row `897`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0643` now adds a repair rough-in partial for upper tritetracontaducentafoil wing garden porch attic pantry tritetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0442` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `442/442` queue corrections, `442` imported permits, `896` imported inspections, `907` eval tasks, `448` reviewed labels, `1346` source-lineage rows, and next raw append rows at `permits.csv` row `445` and `inspections.csv` row `899`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0644` now adds a repair rough-in partial for upper tetratetracontaducentafoil wing garden porch attic pantry tetratetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0443` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `443/443` queue corrections, `443` imported permits, `898` imported inspections, `909` eval tasks, `449` reviewed labels, `1349` source-lineage rows, and next raw append rows at `permits.csv` row `446` and `inspections.csv` row `901`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0645` now adds a repair rough-in partial for upper pentatetracontaducentafoil wing garden porch attic pantry pentatetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0444` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `444/444` queue corrections, `444` imported permits, `900` imported inspections, `911` eval tasks, `450` reviewed labels, `1352` source-lineage rows, and next raw append rows at `permits.csv` row `447` and `inspections.csv` row `903`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0646` now adds a repair rough-in partial for upper hexatetracontaducentafoil wing garden porch attic pantry hexatetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0445` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `445/445` queue corrections, `445` imported permits, `902` imported inspections, `913` eval tasks, `451` reviewed labels, `1355` source-lineage rows, and next raw append rows at `permits.csv` row `448` and `inspections.csv` row `905`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0647` now adds a repair rough-in partial for upper heptatetracontaducentafoil wing garden porch attic pantry heptatetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0446` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `446/446` queue corrections, `446` imported permits, `904` imported inspections, `915` eval tasks, `452` reviewed labels, `1358` source-lineage rows, and next raw append rows at `permits.csv` row `449` and `inspections.csv` row `907`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0648` now adds a repair rough-in partial for upper octatetracontaducentafoil wing garden porch attic pantry octatetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0447` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `447/447` queue corrections, `447` imported permits, `906` imported inspections, `917` eval tasks, `453` reviewed labels, `1361` source-lineage rows, and next raw append rows at `permits.csv` row `450` and `inspections.csv` row `909`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0649` now adds a repair rough-in partial for upper enneatetracontaducentafoil wing garden porch attic pantry enneatetracontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0448` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `448/448` queue corrections, `448` imported permits, `908` imported inspections, `919` eval tasks, `454` reviewed labels, `1364` source-lineage rows, and next raw append rows at `permits.csv` row `451` and `inspections.csv` row `911`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0650` now adds a repair rough-in partial for upper pentacontaducentafoil wing garden porch attic pantry pentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0449` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `449/449` queue corrections, `449` imported permits, `910` imported inspections, `921` eval tasks, `455` reviewed labels, `1367` source-lineage rows, and next raw append rows at `permits.csv` row `452` and `inspections.csv` row `913`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0651` now adds a repair rough-in partial for upper henpentacontaducentafoil wing garden porch attic pantry henpentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0450` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `450/450` queue corrections, `450` imported permits, `912` imported inspections, `923` eval tasks, `456` reviewed labels, `1370` source-lineage rows, and next raw append rows at `permits.csv` row `453` and `inspections.csv` row `915`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0652` now adds a repair rough-in partial for upper dopentacontaducentafoil wing garden porch attic pantry dopentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0451` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `451/451` queue corrections, `451` imported permits, `914` imported inspections, `925` eval tasks, `457` reviewed labels, `1373` source-lineage rows, and next raw append rows at `permits.csv` row `454` and `inspections.csv` row `917`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0653` now adds a repair rough-in partial for upper tripentacontaducentafoil wing garden porch attic pantry tripentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0452` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `452/452` queue corrections, `452` imported permits, `916` imported inspections, `927` eval tasks, `458` reviewed labels, `1376` source-lineage rows, and next raw append rows at `permits.csv` row `455` and `inspections.csv` row `919`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0654` now adds a repair rough-in partial for upper tetrapentacontaducentafoil wing garden porch attic pantry tetrapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0453` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `453/453` queue corrections, `453` imported permits, `918` imported inspections, `929` eval tasks, `459` reviewed labels, `1379` source-lineage rows, and next raw append rows at `permits.csv` row `456` and `inspections.csv` row `921`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0655` now adds a repair rough-in partial for upper pentapentacontaducentafoil wing garden porch attic pantry pentapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0454` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `454/454` queue corrections, `454` imported permits, `920` imported inspections, `931` eval tasks, `460` reviewed labels, `1382` source-lineage rows, and next raw append rows at `permits.csv` row `457` and `inspections.csv` row `923`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0656` now adds a repair rough-in partial for upper hexapentacontaducentafoil wing garden porch attic pantry hexapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0455` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `455/455` queue corrections, `455` imported permits, `922` imported inspections, `933` eval tasks, `461` reviewed labels, `1385` source-lineage rows, and next raw append rows at `permits.csv` row `458` and `inspections.csv` row `925`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0657` now adds a repair rough-in partial for upper heptapentacontaducentafoil wing garden porch attic pantry heptapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0456` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `456/456` queue corrections, `456` imported permits, `924` imported inspections, `935` eval tasks, `462` reviewed labels, `1388` source-lineage rows, and next raw append rows at `permits.csv` row `459` and `inspections.csv` row `927`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0658` now adds a repair rough-in partial for upper octapentacontaducentafoil wing garden porch attic pantry octapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0457` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `457/457` queue corrections, `457` imported permits, `926` imported inspections, `937` eval tasks, `463` reviewed labels, `1391` source-lineage rows, and next raw append rows at `permits.csv` row `460` and `inspections.csv` row `929`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0659` now adds a repair rough-in partial for upper enneapentacontaducentafoil wing garden porch attic pantry enneapentacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0458` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `458/458` queue corrections, `458` imported permits, `928` imported inspections, `939` eval tasks, `464` reviewed labels, `1394` source-lineage rows, and next raw append rows at `permits.csv` row `461` and `inspections.csv` row `931`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0660` now adds a repair rough-in partial for upper hexacontaducentafoil wing garden porch attic pantry hexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0459` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `459/459` queue corrections, `459` imported permits, `930` imported inspections, `941` eval tasks, `465` reviewed labels, `1397` source-lineage rows, and next raw append rows at `permits.csv` row `462` and `inspections.csv` row `933`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0661` now adds a repair rough-in partial for upper henhexacontaducentafoil wing garden porch attic pantry henhexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0460` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `460/460` queue corrections, `460` imported permits, `932` imported inspections, `943` eval tasks, `466` reviewed labels, `1400` source-lineage rows, and next raw append rows at `permits.csv` row `463` and `inspections.csv` row `935`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0662` now adds a repair rough-in partial for upper dohexacontaducentafoil wing garden porch attic pantry dohexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0461` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `461/461` queue corrections, `461` imported permits, `934` imported inspections, `945` eval tasks, `467` reviewed labels, `1403` source-lineage rows, and next raw append rows at `permits.csv` row `464` and `inspections.csv` row `937`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0663` now adds a repair rough-in partial for upper trihexacontaducentafoil wing garden porch attic pantry trihexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0462` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `462/462` queue corrections, `462` imported permits, `936` imported inspections, `947` eval tasks, `468` reviewed labels, `1406` source-lineage rows, and next raw append rows at `permits.csv` row `465` and `inspections.csv` row `939`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0664` now adds a repair rough-in partial for upper tetrahexacontaducentafoil wing garden porch attic pantry tetrahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0463` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `463/463` queue corrections, `463` imported permits, `938` imported inspections, `949` eval tasks, `469` reviewed labels, `1409` source-lineage rows, and next raw append rows at `permits.csv` row `466` and `inspections.csv` row `941`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0665` now adds a repair rough-in partial for upper pentahexacontaducentafoil wing garden porch attic pantry pentahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0464` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `464/464` queue corrections, `464` imported permits, `940` imported inspections, `951` eval tasks, `470` reviewed labels, `1412` source-lineage rows, and next raw append rows at `permits.csv` row `467` and `inspections.csv` row `943`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0666` now adds a repair rough-in partial for upper hexahexacontaducentafoil wing garden porch attic pantry hexahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0465` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `465/465` queue corrections, `465` imported permits, `942` imported inspections, `953` eval tasks, `471` reviewed labels, `1415` source-lineage rows, and next raw append rows at `permits.csv` row `468` and `inspections.csv` row `945`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0667` now adds a repair rough-in partial for upper heptahexacontaducentafoil wing garden porch attic pantry heptahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0466` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `466/466` queue corrections, `466` imported permits, `944` imported inspections, `955` eval tasks, `472` reviewed labels, `1418` source-lineage rows, and next raw append rows at `permits.csv` row `469` and `inspections.csv` row `947`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0668` now adds a repair rough-in partial for upper octahexacontaducentafoil wing garden porch attic pantry octahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0467` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `467/467` queue corrections, `467` imported permits, `946` imported inspections, `957` eval tasks, `473` reviewed labels, `1421` source-lineage rows, and next raw append rows at `permits.csv` row `470` and `inspections.csv` row `949`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0669` now adds a repair rough-in partial for upper enneahexacontaducentafoil wing garden porch attic pantry enneahexacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0468` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `468/468` queue corrections, `468` imported permits, `948` imported inspections, `959` eval tasks, `474` reviewed labels, `1424` source-lineage rows, and next raw append rows at `permits.csv` row `471` and `inspections.csv` row `951`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0670` now adds a repair rough-in partial for upper septuagintaducentafoil wing garden porch attic pantry septuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0469` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `469/469` queue corrections, `469` imported permits, `950` imported inspections, `961` eval tasks, `475` reviewed labels, `1427` source-lineage rows, and next raw append rows at `permits.csv` row `472` and `inspections.csv` row `953`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0674` now adds a repair rough-in partial for upper tetraseptuagintaducentafoil wing garden porch attic pantry tetraseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0473` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `473/473` queue corrections, `473` imported permits, `958` imported inspections, `969` eval tasks, `479` reviewed labels, `1439` source-lineage rows, and next raw append rows at `permits.csv` row `476` and `inspections.csv` row `961`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0675` now adds a repair rough-in partial for upper pentaseptuagintaducentafoil wing garden porch attic pantry pentaseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0474` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `474/474` queue corrections, `474` imported permits, `960` imported inspections, `971` eval tasks, `480` reviewed labels, `1442` source-lineage rows, and next raw append rows at `permits.csv` row `477` and `inspections.csv` row `963`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0676` now adds a repair rough-in partial for upper hexaseptuagintaducentafoil wing garden porch attic pantry hexaseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0475` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `475/475` queue corrections, `475` imported permits, `962` imported inspections, `973` eval tasks, `481` reviewed labels, `1445` source-lineage rows, and next raw append rows at `permits.csv` row `478` and `inspections.csv` row `965`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0677` now adds a repair rough-in partial for upper heptaseptuagintaducentafoil wing garden porch attic pantry heptaseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0476` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `476/476` queue corrections, `476` imported permits, `964` imported inspections, `975` eval tasks, `482` reviewed labels, `1448` source-lineage rows, and next raw append rows at `permits.csv` row `479` and `inspections.csv` row `967`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0678` now adds a repair rough-in partial for upper octaseptuagintaducentafoil wing garden porch attic pantry octaseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0477` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `477/477` queue corrections, `477` imported permits, `966` imported inspections, `977` eval tasks, `483` reviewed labels, `1451` source-lineage rows, and next raw append rows at `permits.csv` row `480` and `inspections.csv` row `969`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0679` now adds a repair rough-in partial for upper enneaseptuagintaducentafoil wing garden porch attic pantry enneaseptuagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0478` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `478/478` queue corrections, `478` imported permits, `968` imported inspections, `979` eval tasks, `484` reviewed labels, `1454` source-lineage rows, and next raw append rows at `permits.csv` row `481` and `inspections.csv` row `971`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0680` now adds a repair rough-in partial for upper octacontaducentafoil wing garden porch attic pantry octacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0479` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `479/479` queue corrections, `479` imported permits, `970` imported inspections, `981` eval tasks, `485` reviewed labels, `1457` source-lineage rows, and next raw append rows at `permits.csv` row `482` and `inspections.csv` row `973`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0681` now adds a repair rough-in partial for upper henoctacontaducentafoil wing garden porch attic pantry henoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0480` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `480/480` queue corrections, `480` imported permits, `972` imported inspections, `983` eval tasks, `486` reviewed labels, `1460` source-lineage rows, and next raw append rows at `permits.csv` row `483` and `inspections.csv` row `975`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0682` now adds a repair rough-in partial for upper dooctacontaducentafoil wing garden porch attic pantry dooctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0481` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `481/481` queue corrections, `481` imported permits, `974` imported inspections, `985` eval tasks, `487` reviewed labels, `1463` source-lineage rows, and next raw append rows at `permits.csv` row `484` and `inspections.csv` row `977`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0683` now adds a repair rough-in partial for upper trioctacontaducentafoil wing garden porch attic pantry trioctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0482` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `482/482` queue corrections, `482` imported permits, `976` imported inspections, `987` eval tasks, `488` reviewed labels, `1466` source-lineage rows, and next raw append rows at `permits.csv` row `485` and `inspections.csv` row `979`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0684` now adds a repair rough-in partial for upper tetraoctacontaducentafoil wing garden porch attic pantry tetraoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0483` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `483/483` queue corrections, `483` imported permits, `978` imported inspections, `989` eval tasks, `489` reviewed labels, `1469` source-lineage rows, and next raw append rows at `permits.csv` row `486` and `inspections.csv` row `981`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0685` now adds a repair rough-in partial for upper pentaoctacontaducentafoil wing garden porch attic pantry pentaoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0484` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `484/484` queue corrections, `484` imported permits, `980` imported inspections, `991` eval tasks, `490` reviewed labels, `1472` source-lineage rows, and next raw append rows at `permits.csv` row `487` and `inspections.csv` row `983`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0686` now adds a repair rough-in partial for upper hexaoctacontaducentafoil wing garden porch attic pantry hexaoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0485` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `485/485` queue corrections, `485` imported permits, `982` imported inspections, `993` eval tasks, `491` reviewed labels, `1475` source-lineage rows, and next raw append rows at `permits.csv` row `488` and `inspections.csv` row `985`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0687` now adds a repair rough-in partial for upper heptaoctacontaducentafoil wing garden porch attic pantry heptaoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0486` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `486/486` queue corrections, `486` imported permits, `984` imported inspections, `995` eval tasks, `492` reviewed labels, `1478` source-lineage rows, and next raw append rows at `permits.csv` row `489` and `inspections.csv` row `987`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0688` now adds a repair rough-in partial for upper octaoctacontaducentafoil wing garden porch attic pantry octaoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0487` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `487/487` queue corrections, `487` imported permits, `986` imported inspections, `997` eval tasks, `493` reviewed labels, `1481` source-lineage rows, and next raw append rows at `permits.csv` row `490` and `inspections.csv` row `989`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0689` now adds a repair rough-in partial for upper enneaoctacontaducentafoil wing garden porch attic pantry enneaoctacontaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0488` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `488/488` queue corrections, `488` imported permits, `988` imported inspections, `999` eval tasks, `494` reviewed labels, `1484` source-lineage rows, and next raw append rows at `permits.csv` row `491` and `inspections.csv` row `991`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0690` now adds a repair rough-in partial for upper nonagintaducentafoil wing garden porch attic pantry nonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0489` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `489/489` queue corrections, `489` imported permits, `990` imported inspections, `1001` eval tasks, `495` reviewed labels, `1487` source-lineage rows, and next raw append rows at `permits.csv` row `492` and `inspections.csv` row `993`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0691` now adds a repair rough-in partial for upper hennonagintaducentafoil wing garden porch attic pantry hennonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0490` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `490/490` queue corrections, `490` imported permits, `992` imported inspections, `1003` eval tasks, `496` reviewed labels, `1490` source-lineage rows, and next raw append rows at `permits.csv` row `493` and `inspections.csv` row `995`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0692` now adds a repair rough-in partial for upper duononagintaducentafoil wing garden porch attic pantry duononagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0491` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `491/491` queue corrections, `491` imported permits, `994` imported inspections, `1005` eval tasks, `497` reviewed labels, `1493` source-lineage rows, and next raw append rows at `permits.csv` row `494` and `inspections.csv` row `997`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0693` now adds a repair rough-in partial for upper triononagintaducentafoil wing garden porch attic pantry triononagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0492` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `492/492` queue corrections, `492` imported permits, `996` imported inspections, `1007` eval tasks, `498` reviewed labels, `1496` source-lineage rows, and next raw append rows at `permits.csv` row `495` and `inspections.csv` row `999`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0694` now adds a repair rough-in partial for upper tetranonagintaducentafoil wing garden porch attic pantry tetranonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0493` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `493/493` queue corrections, `493` imported permits, `998` imported inspections, `1009` eval tasks, `499` reviewed labels, `1499` source-lineage rows, and next raw append rows at `permits.csv` row `496` and `inspections.csv` row `1001`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0695` now adds a repair rough-in partial for upper pentanonagintaducentafoil wing garden porch attic pantry pentanonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0494` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `494/494` queue corrections, `494` imported permits, `1000` imported inspections, `1011` eval tasks, `500` reviewed labels, `1502` source-lineage rows, and next raw append rows at `permits.csv` row `497` and `inspections.csv` row `1003`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0696` now adds a repair rough-in partial for upper hexanonagintaducentafoil wing garden porch attic pantry hexanonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0495` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `495/495` queue corrections, `495` imported permits, `1002` imported inspections, `1013` eval tasks, `501` reviewed labels, `1505` source-lineage rows, and next raw append rows at `permits.csv` row `498` and `inspections.csv` row `1005`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0697` now adds a repair rough-in partial for upper heptanonagintaducentafoil wing garden porch attic pantry heptanonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0496` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `496/496` queue corrections, `496` imported permits, `1004` imported inspections, `1015` eval tasks, `502` reviewed labels, `1508` source-lineage rows, and next raw append rows at `permits.csv` row `499` and `inspections.csv` row `1007`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0698` now adds a repair rough-in partial for upper octanonagintaducentafoil wing garden porch attic pantry octanonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0497` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `497/497` queue corrections, `497` imported permits, `1006` imported inspections, `1017` eval tasks, `503` reviewed labels, `1511` source-lineage rows, and next raw append rows at `permits.csv` row `500` and `inspections.csv` row `1009`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0699` now adds a repair rough-in partial for upper enneanonagintaducentafoil wing garden porch attic pantry enneanonagintaducentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0498` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `498/498` queue corrections, `498` imported permits, `1008` imported inspections, `1019` eval tasks, `504` reviewed labels, `1514` source-lineage rows, and next raw append rows at `permits.csv` row `501` and `inspections.csv` row `1011`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0700` now adds a repair rough-in partial for upper trecentafoil wing garden porch attic pantry trecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0499` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `499/499` queue corrections, `499` imported permits, `1010` imported inspections, `1021` eval tasks, `505` reviewed labels, `1517` source-lineage rows, and next raw append rows at `permits.csv` row `502` and `inspections.csv` row `1013`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0701` now adds a repair rough-in partial for upper hentrecentafoil wing garden porch attic pantry hentrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0500` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `500/500` queue corrections, `500` imported permits, `1012` imported inspections, `1023` eval tasks, `506` reviewed labels, `1520` source-lineage rows, and next raw append rows at `permits.csv` row `503` and `inspections.csv` row `1015`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0702` now adds a repair rough-in partial for upper dotrecentafoil wing garden porch attic pantry dotrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0501` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `501/501` queue corrections, `501` imported permits, `1014` imported inspections, `1025` eval tasks, `507` reviewed labels, `1523` source-lineage rows, and next raw append rows at `permits.csv` row `504` and `inspections.csv` row `1017`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0703` now adds a repair rough-in partial for upper tritrecentafoil wing garden porch attic pantry tritrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0502` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `502/502` queue corrections, `502` imported permits, `1016` imported inspections, `1027` eval tasks, `508` reviewed labels, `1526` source-lineage rows, and next raw append rows at `permits.csv` row `505` and `inspections.csv` row `1019`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0704` now adds a repair rough-in partial for upper tetratrecentafoil wing garden porch attic pantry tetratrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0503` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `503/503` queue corrections, `503` imported permits, `1018` imported inspections, `1029` eval tasks, `509` reviewed labels, `1529` source-lineage rows, and next raw append rows at `permits.csv` row `506` and `inspections.csv` row `1021`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0705` now adds a repair rough-in partial for upper pentatrecentafoil wing garden porch attic pantry pentatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0504` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `504/504` queue corrections, `504` imported permits, `1020` imported inspections, `1031` eval tasks, `510` reviewed labels, `1532` source-lineage rows, and next raw append rows at `permits.csv` row `507` and `inspections.csv` row `1023`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0706` now adds a repair rough-in partial for upper hexatrecentafoil wing garden porch attic pantry hexatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0505` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `505/505` queue corrections, `505` imported permits, `1022` imported inspections, `1033` eval tasks, `511` reviewed labels, `1535` source-lineage rows, and next raw append rows at `permits.csv` row `508` and `inspections.csv` row `1025`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0707` now adds a repair rough-in partial for upper heptatrecentafoil wing garden porch attic pantry heptatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0506` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `506/506` queue corrections, `506` imported permits, `1024` imported inspections, `1035` eval tasks, `512` reviewed labels, `1538` source-lineage rows, and next raw append rows at `permits.csv` row `509` and `inspections.csv` row `1027`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0708` now adds a repair rough-in partial for upper octatrecentafoil wing garden porch attic pantry octatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0507` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `507/507` queue corrections, `507` imported permits, `1026` imported inspections, `1037` eval tasks, `513` reviewed labels, `1541` source-lineage rows, and next raw append rows at `permits.csv` row `510` and `inspections.csv` row `1029`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0709` now adds a repair rough-in partial for upper enneatrecentafoil wing garden porch attic pantry enneatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0508` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `508/508` queue corrections, `508` imported permits, `1028` imported inspections, `1039` eval tasks, `514` reviewed labels, `1544` source-lineage rows, and next raw append rows at `permits.csv` row `511` and `inspections.csv` row `1031`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0710` now adds a repair rough-in partial for upper decatrecentafoil wing garden porch attic pantry decatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0509` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `509/509` queue corrections, `509` imported permits, `1030` imported inspections, `1041` eval tasks, `515` reviewed labels, `1547` source-lineage rows, and next raw append rows at `permits.csv` row `512` and `inspections.csv` row `1033`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0711` now adds a repair rough-in partial for upper hendecatrecentafoil wing garden porch attic pantry hendecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0510` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `510/510` queue corrections, `510` imported permits, `1032` imported inspections, `1043` eval tasks, `516` reviewed labels, `1550` source-lineage rows, and next raw append rows at `permits.csv` row `513` and `inspections.csv` row `1035`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0712` now adds a repair rough-in partial for upper dodecatrecentafoil wing garden porch attic pantry dodecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0511` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `511/511` queue corrections, `511` imported permits, `1034` imported inspections, `1045` eval tasks, `517` reviewed labels, `1553` source-lineage rows, and next raw append rows at `permits.csv` row `514` and `inspections.csv` row `1037`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0713` now adds a repair rough-in partial for upper tridecatrecentafoil wing garden porch attic pantry tridecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0512` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `512/512` queue corrections, `512` imported permits, `1036` imported inspections, `1047` eval tasks, `518` reviewed labels, `1556` source-lineage rows, and next raw append rows at `permits.csv` row `515` and `inspections.csv` row `1039`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0714` now adds a repair rough-in partial for upper tetradecatrecentafoil wing garden porch attic pantry tetradecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0513` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `513/513` queue corrections, `513` imported permits, `1038` imported inspections, `1049` eval tasks, `519` reviewed labels, `1559` source-lineage rows, and next raw append rows at `permits.csv` row `516` and `inspections.csv` row `1041`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0715` now adds a repair rough-in partial for upper pentadecatrecentafoil wing garden porch attic pantry pentadecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0514` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `514/514` queue corrections, `514` imported permits, `1040` imported inspections, `1051` eval tasks, `520` reviewed labels, `1562` source-lineage rows, and next raw append rows at `permits.csv` row `517` and `inspections.csv` row `1043`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0716` now adds a repair rough-in partial for upper hexadecatrecentafoil wing garden porch attic pantry hexadecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0515` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `515/515` queue corrections, `515` imported permits, `1042` imported inspections, `1053` eval tasks, `521` reviewed labels, `1565` source-lineage rows, and next raw append rows at `permits.csv` row `518` and `inspections.csv` row `1045`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0717` now adds a repair rough-in partial for upper heptadecatrecentafoil wing garden porch attic pantry heptadecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0516` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `516/516` queue corrections, `516` imported permits, `1044` imported inspections, `1055` eval tasks, `522` reviewed labels, `1568` source-lineage rows, and next raw append rows at `permits.csv` row `519` and `inspections.csv` row `1047`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0718` now adds a repair rough-in partial for upper octadecatrecentafoil wing garden porch attic pantry octadecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0517` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `517/517` queue corrections, `517` imported permits, `1046` imported inspections, `1057` eval tasks, `523` reviewed labels, `1571` source-lineage rows, and next raw append rows at `permits.csv` row `520` and `inspections.csv` row `1049`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0719` now adds a repair rough-in partial for upper enneadecatrecentafoil wing garden porch attic pantry enneadecatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0518` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `518/518` queue corrections, `518` imported permits, `1048` imported inspections, `1059` eval tasks, `524` reviewed labels, `1574` source-lineage rows, and next raw append rows at `permits.csv` row `521` and `inspections.csv` row `1051`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0720` now adds a repair rough-in partial for upper icosatrecentafoil wing garden porch attic pantry icosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0519` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `519/519` queue corrections, `519` imported permits, `1050` imported inspections, `1061` eval tasks, `525` reviewed labels, `1577` source-lineage rows, and next raw append rows at `permits.csv` row `522` and `inspections.csv` row `1053`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0721` now adds a repair rough-in partial for upper henicosatrecentafoil wing garden porch attic pantry henicosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0520` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `520/520` queue corrections, `520` imported permits, `1052` imported inspections, `1063` eval tasks, `526` reviewed labels, `1580` source-lineage rows, and next raw append rows at `permits.csv` row `523` and `inspections.csv` row `1055`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0722` now adds a repair rough-in partial for upper docosatrecentafoil wing garden porch attic pantry docosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0521` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `521/521` queue corrections, `521` imported permits, `1054` imported inspections, `1065` eval tasks, `527` reviewed labels, `1583` source-lineage rows, and next raw append rows at `permits.csv` row `524` and `inspections.csv` row `1057`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0723` now adds a repair rough-in partial for upper tricosatrecentafoil wing garden porch attic pantry tricosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0522` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `522/522` queue corrections, `522` imported permits, `1056` imported inspections, `1067` eval tasks, `528` reviewed labels, `1586` source-lineage rows, and next raw append rows at `permits.csv` row `525` and `inspections.csv` row `1059`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0724` now adds a repair rough-in partial for upper tetracosatrecentafoil wing garden porch attic pantry tetracosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0523` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `523/523` queue corrections, `523` imported permits, `1058` imported inspections, `1069` eval tasks, `529` reviewed labels, `1589` source-lineage rows, and next raw append rows at `permits.csv` row `526` and `inspections.csv` row `1061`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0725` now adds a repair rough-in partial for upper pentacosatrecentafoil wing garden porch attic pantry pentacosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0524` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `524/524` queue corrections, `524` imported permits, `1060` imported inspections, `1071` eval tasks, `530` reviewed labels, `1592` source-lineage rows, and next raw append rows at `permits.csv` row `527` and `inspections.csv` row `1063`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0726` now adds a repair rough-in partial for upper hexacosatrecentafoil wing garden porch attic pantry hexacosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0525` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `525/525` queue corrections, `525` imported permits, `1062` imported inspections, `1073` eval tasks, `531` reviewed labels, `1595` source-lineage rows, and next raw append rows at `permits.csv` row `528` and `inspections.csv` row `1065`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0727` now adds a repair rough-in partial for upper heptacosatrecentafoil wing garden porch attic pantry heptacosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0526` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `526/526` queue corrections, `526` imported permits, `1064` imported inspections, `1075` eval tasks, `532` reviewed labels, `1598` source-lineage rows, and next raw append rows at `permits.csv` row `529` and `inspections.csv` row `1067`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0728` now adds a repair rough-in partial for upper octacosatrecentafoil wing garden porch attic pantry octacosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0527` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `527/527` queue corrections, `527` imported permits, `1066` imported inspections, `1077` eval tasks, `533` reviewed labels, `1601` source-lineage rows, and next raw append rows at `permits.csv` row `530` and `inspections.csv` row `1069`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0729` now adds a repair rough-in partial for upper enneacosatrecentafoil wing garden porch attic pantry enneacosatrecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0528` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `528/528` queue corrections, `528` imported permits, `1068` imported inspections, `1079` eval tasks, `534` reviewed labels, `1604` source-lineage rows, and next raw append rows at `permits.csv` row `531` and `inspections.csv` row `1071`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0730` now adds a repair rough-in partial for upper triacontarecentafoil wing garden porch attic pantry triacontarecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0529` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `529/529` queue corrections, `529` imported permits, `1070` imported inspections, `1081` eval tasks, `535` reviewed labels, `1607` source-lineage rows, and next raw append rows at `permits.csv` row `532` and `inspections.csv` row `1073`.
- Appended one importable Dallas electrical repair permit bundle to the raw `v2` fixture: `ELZ-2026-0731` now adds a repair rough-in partial for upper henatriacontarecentafoil wing garden porch attic pantry henatriacontarecentafoil-bracket lighting and cover-trim completion plus a passing correction follow-up, the non-server CLI captured `workflow-item:dallas:next-action:0530` as accepted, synced the visible status page, and the refreshed Dallas pipeline reports `ready` with `530/530` queue corrections, `530` imported permits, `1072` imported inspections, `1083` eval tasks, `536` reviewed labels, `1610` source-lineage rows, and next raw append rows at `permits.csv` row `533` and `inspections.csv` row `1075`.
